Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1646     Entry time: Wednesday, October 18, 2017, 14:54
Author: Anders Mjos 
Category: Assembly/Bench Test 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Source tray assembly electrical check 

Source tray meggered today by Anders and Keith

GND - MSP OL @ 1000V
MSP - EE OL @ 1000V
EE - GND OL @ 1000V
4x Steerers - GND OL @ 500V

Steerer continuity verified from socket to steerer plates
(looking in the direction of the RIB, labeled top to bottom on sockets)

1 - Top
2 - Left
3 - Right
4 - Bottom

Attachment 1: Steerer_Connections_2017-10-18.pdf  423 kB  Uploaded Wednesday, October 18, 2017, 16:16  | Show | Hide all
ELOG V2.9.2-2455