Entry  Friday, March 01, 2019, 08:42, Anders Mjos, Conditioning Station, Standard Operation, TM2, , Conditioning TM2 without source tray TM2_BIAS_current_vs_voltage_2019-03.xlsxTM2_HV_Conditioning_2019-03-01.docx
BIAS and EZL connected. No water flowing into the module (water looped on top of module)
Friday, March 01, 2019, 08:20: 10kV
Friday, March 01, 2019, 08:40: 20kV
    Reply  Thursday, March 28, 2019, 12:48, Anders Mjos, Conditioning Station, Repair, TM2, dummy febiad test target, TM2 new source tray helium pressure test at TCS. 


    
        
            David Wang wrote:
        
        
            
            Helium pressure test on TM2 all water circuits is done. 70 psi helium , 10 minutes test time. Leak detector
Entry  Tuesday, October 01, 2019, 16:30, Anders Mjos, Conditioning Station, Standard Operation, TM2, Ta#58, Conditioning of Ta#58 
Tuesday, October 01, 2019, 15:15: Started roughing.
Tuesday, October 01, 2019, 16:30: Started TPs
Tuesday, October 01, 2019, 16:34: All TPs at speed
Entry  Thursday, October 31, 2019, 08:49, Anders Mjos, Conditioning Station, Repair, , , Water leak on non-active cooling water circuit 
Yesterday a leak was discovered in the ISAC-I experimental hall. The leak appears to be at the connection between the evaporator and the return water
line. 1 in of water was lost from TCS:TK1. The water is currently valved off to prevent further leakage.
A fault reportt has been submitted to mechanical
    Reply  Thursday, November 07, 2019, 10:39, Anders Mjos, Conditioning Station, Standard Operation, TM2, SiC#38, Conditioing SiC#38 SiC#38_ANODE_bias_2019-11-07.PNG
Thursday, November 07, 2019, 10:35: Tested source to 30 A on TGHT, TBHT and COIL. ANODE at 100 V.

Tuesday, November 12, 2019 
The FEBIAD source worked well over the weekend. The anode current limit was adjusted twice to stop voltage limiting. About 5E-8 A on the FC with
Entry  Thursday, February 27, 2020, 16:08, Anders Mjos, North Hot-Cell, Maintenance, , , Hot Cell Entry NHC_2020-02-27.pdf
Chad entered the NHC today to tighten set-screws on both slave side manipulators and re-align the West side slave. Work took place using the HC Confined
Space Entry procedure. See attached checklist. WP I2020-02-27-4
Entry  Thursday, March 19, 2020, 15:48, Anders Mjos, Conditioning Station, Maintenance, , , Filter replacement in water system March 5th 
Filters were replaced by Curtis von Cube on March 5th. See work permit for details I2020-03-05-5
Entry  Thursday, August 27, 2020, 09:42, Anders Mjos, Conditioning Station, Maintenance, TM2, Ta#60, Refilled TK2 
Refilled TCS:TK2 from 10 in to 22 in using the newly installed valve.
Entry  Thursday, August 27, 2020, 13:18, Anders Mjos, Conditioning Station, Maintenance, TM2, , New Power Supply installed for TGHT 
Arthur installed a new Magna Power PS for the TGHT yesterday. The old power supply has been moved to Evaporator 2. The power supply was configured for
remote operation and tested successfully with low current (30 A).
Entry  Thursday, March 25, 2021, 08:55, Anders Mjos, Conditioning Station, Maintenance, , , Filters inspected and cleaned on water circuit 
By Curtis. See Work Permit I2021-03-24-1 for details.
Entry  Monday, April 12, 2021, 13:45, Anders Mjos, Cooling, Maintenance, , , New T installed for instrumentation loop on HALCW system MicrosoftTeams-image_(9).png
Adrian and co installed a new T to be able to add an instrument loop for O2 and pH monitoring on the low conductivity water systtem (photo). See WP I2021-04-09-4
Entry  Monday, April 12, 2021, 13:47, Anders Mjos, Assembly/Bench Test, Repair, TM4, , Steerer wiring TM4_Steerers_electric_check.pdf
Travis assembled and tested the steerer wires March 31st (see attached)
Entry  Tuesday, May 25, 2021, 16:20, Anders Mjos, Conditioning Station, Maintenance, , , Chiller maintenance 
A contractor on site today for chiller maintenance. CP2 and CP3 circuit is leaking and shall not be used. CP1 can still be used. The contractor will
contact Plant Group with a quote for repair and upgrades.
Entry  Tuesday, May 25, 2021, 16:20, Anders Mjos, Conditioning Station, Maintenance, , , TK2 refilled 
Tank refilled from 12 in to 25 in using the new valve.
Entry  Friday, May 17, 2019, 16:46, Adam Newsome, Safe Module Parking, Development, , , SMP Controls Installation Update IMG_20190417_100838.jpgIMG_20190417_100843.jpgIMG_20190517_162230.jpgIMG_20190517_162305.jpg
 
The following controls-related items were installed for the SMP project:
- Cable tray
Entry  Monday, July 22, 2019, 14:51, Adam Newsome, South Hot-Cell, Standard Operation, TM4, No Target, TM4 Move 
TM4 has been moved from the South West silo to the South Hot Cell. New source tray, no target.
Entry  Wednesday, July 31, 2019, 08:57, Adam Newsome, South Hot-Cell, Standard Operation, TM4, No Target, TM4 Move 
TM4 has been moved from the Conditioning Station to the South Hot Cell. No target. 
Entry  Tuesday, August 13, 2019, 09:49, Adam Newsome, South Hot-Cell, Standard Operation, TM2, Ta 58, TM2 Move 
TM2 was moved from ITE to South Hot Cell. Tantalum 58 target. 
Entry  Thursday, August 15, 2019, 09:36, Adam Newsome, ITE, Standard Operation, TM2, ZrC #8, TM2 Move 
TM2 was moved from South Hot Cell to ITE. ZrC #8 target. 
Entry  Tuesday, August 27, 2019, 13:12, Adam Newsome, Safe Module Parking, Development, , , SMP Remote Control Wiring Inspection 
The wiring for the SMP remote control module was inspected by Joel Semilla (TRIUMF  electrician).  The module was plugged in to verify there were no
issues. No changes were suggested, and then wiring was approved.