  463   Wednesday, September 25, 2013, 06:59 maicodallavalleSouth Hot-CellStandard OperationTM3 Containment box coverThe containment box cover has had all 
the bolts installed and all bolts were checked
with a mirror. TM3 has been raised and is
  
  455   Tuesday, September 17, 2013, 14:36 Bevan MossSouth Hot-CellStandard OperationTM3 Containment Box has been removed The containment box has been removed.
Tomorrow the wiring harness will be installed.
  
  907   Friday, May 01, 2015, 08:27 chad fisherSouth Hot-CellRepairTM2 Containment Box RemovalContainment box has been removed in preparation
for wire replacement.
  
  280   Wednesday, March 27, 2013, 11:49 David WangITEStandard OperationTM4Sic LIS-RFQ Connected TM4 in ITETM4 has been reconnected to ITE after the
module moving. The roughing is started .
The water will be supplied to ITE after 
  
  687   Tuesday, June 24, 2014, 15:14 Anders MjosSouth Hot-CellStandard OperationTM3TiC#4Conductor insulator broken close to right TGHT terminalWhen the Containment Box was opened today
by Chad for a target change, we found the
conductor insulator block B (ITD0054) to
 TiC#4_Broken_Insulator.pdf 
  689   Wednesday, June 25, 2014, 12:49 Anders MjosSouth Hot-CellStandard OperationTM3TiC#4Conductor insulator broken close to right TGHT terminal

    

       
            
 ITD0052C_revB.pdf 
  2767   Tuesday, February 11, 2025, 10:36 chad fisherSouth Hot-CellRepairTM2 Conductor Block Insulator ReplacementCeramic conductor blocks ITD0053 and ITD0054
were replaced on TM2. Initially, only ITD0053
was to be replaced but after removing it
 Image_(12).jpegImage_(13).jpegImage_(14).jpeg 
  1996   Tuesday, October 01, 2019, 16:30 Anders MjosConditioning StationStandard OperationTM2Ta#58Conditioning of Ta#58Tuesday, October 01, 2019, 15:15: Started
roughing.
Tuesday, October 01, 2019, 16:30:
  
  1055   Thursday, August 27, 2015, 10:10 Anders MjosConditioning StationStandard OperationTM2ZrC#7Conditioning new Source TrayThursday, August 27, 2015, 10:10: Started
water system. TK2 level reduced from 24.9
to 23.5 in. 
 2015-08-31_Service_Cap_Sparking_on_Rubber_Plug.pdfTM2_Source_Tray_with_ZrC#7.docxVacuum_gague_calibration.xlsx 
  1470   Wednesday, March 29, 2017, 11:42 Anders MjosConditioning StationStandard OperationTM4UC#19Conditioning UC#19 Wednesday, March 29, 2017, 11:37:
RGA on
Wednesday, March 29, 2017, 13:51:
 UC#19.docxTCS-2017-03-29_UC#19.rgaTCS-2017-03-30_UC#19.rgaTCS-2017-04-03_UC#19.rga 
  1405   Thursday, November 24, 2016, 09:33 Anders MjosConditioning StationStandard OperationTM2UC#18Conditioning UC#18Thursday, November 24, 2016, 09:33: Water
package on
Thursday, November 24, 2016, 09:43:
  
  1299   Wednesday, August 03, 2016, 08:08 Anders MjosConditioning StationStandard OperationTM4UC#17Conditioning UC#17Wednesday, August 03, 2016, 08:08: RGA
on
Wednesday, August 03, 2016, 11:25:
 UC#17.docxTCS-2016-08-03_UC#17.rgaTCS-2016-08-08_UC#17.rga 
  1259   Wednesday, June 08, 2016, 08:25 Anders MjosConditioning StationStandard OperationTM4UC#16Conditioning UC#16 Wednesday, June 08, 2016, 08:15:
RGA on

Thursday, June 09, 2016,
 UC#16.docxTCS-2016-06-08_UC#16.rga 
  891   Monday, April 20, 2015, 10:12 Anders MjosConditioning StationStandard OperationTM1UC#12Conditioning UC#12Monday, April 20, 2015, 09:35: Started
cooling water circulation
HV cover did not fit due to interference
  
  1658   Thursday, November 09, 2017, 10:39 Anders MjosConditioning StationStandard OperationTM2Ta#55Conditioning Ta#55Thursday, November 09, 2017, 10:40: BIAS
/ EL to 30 / 15 kV. 400 uA on BIAS
Bias was stable for 1 hour. Handed
  
  1632   Thursday, September 28, 2017, 17:44 Anders MjosConditioning StationStandard OperationTM2Ta#54Conditioning Ta#54Thursday, September 28, 2017
Cooling water not yet connected to
TM.
 Ta#54.docxTa#54_BIAS_current_vs_voltage.xlsx 
  1572   Wednesday, June 28, 2017, 16:43 Anders MjosConditioning StationStandard OperationTM4Ta#52Conditioning Ta#52NEW HV cable for BIAS installed earlier
this week.
Wednesday, June 28, 2017, 16:42:
 Ta#52.docx 
  1496   Thursday, April 13, 2017, 11:44 Anders MjosConditioning StationStandard OperationTM2Ta#51Conditioning Ta#51 Thursday, April 13, 2017, 11:43:
Water package started.
  
  1235   Monday, May 16, 2016, 13:26 Anders MjosConditioning StationStandard OperationTM2Ta#48Conditioning Ta#48 Monday, May 16, 2016, 13:20: BIAS/EL/EE
30 / 15 / 1.5 kV
Monday, May 16, 2016, 13:20: Ramping
 Ta#48.docx 
  1949   Wednesday, July 10, 2019, 11:59 Carla BabcockConditioning StationRepairTM4Dummy HP SIS targetConditioning TM4 w/ new ST up to 50kVDavid raised the bias to 49.5kV. Module
is still sparking mainly on top. Humidity
is super high.
  