Message ID: 2399     Entry time: Friday, December 16, 2022, 16:39
Author: Adam Newsome 
Category: Crane 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Crane powered off for holidays 

[edit 2023-01-03] The crane was powered back on this morning - there do not appear to be any faults and it seems that the crane was unaffected by the power outage.

The ISAC target hall overhead crane was powered off for the holidays. Note that this may result in the commonly observed PLC battery failure issue when the crane is powered back on in the new year.