Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2173     Entry time: Monday, December 21, 2020, 11:22
Author: Adam Newsome 
Category: Crane 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Crane Shutdown for Power Outage 

The Target Hall Crane has been shut down in preparation for the power outage tomorrow (Dec 22). Power will be restored on Dec 23.

 

Dec 23 update: power has been restored. The crane appears to be in working condition as there is no fault indicator on the PLC.

ELOG V2.9.2-2455