Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 363     Entry time: Monday, May 27, 2013, 10:37
Author: Bevan Moss 
Category: Conditioning Station 
Type: Maintenance 
Module: TM4 
Target/Number:  
Subject: Cooling Systems topped off 

Rob walker has flushed and refilled the primary side of the system (note the water still looks nasty). This morning the primary side of system needed to be bled as there were air pockets. Also TK2 had reached its low point and needed to be topped up.

ELOG V2.9.2-2455