Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 311     Entry time: Monday, April 22, 2013, 11:31
Author: Bevan Moss 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM3 
Target/Number: N/A 
Subject: Cooling Package Started 

 Cooling Package was started at 9:25 this morning inlet conductivity is 0.08 Mohm at 22.9C. Resistance reached 5.33 Mohm by 11:30

ELOG V2.9.2-2455