Message ID: 1667     Entry time: Tuesday, December 19, 2017, 10:40
Author: Don Jackson 
Category: Crane 
Type: Maintenance 
Module:  
Target/Number:  
Subject: Crane Power during winter break 

 The power to the crane and controls were turned off using the power switch in the Crane Control room.  The main disconnect switch in the target hall was not touched.

All site power will be off for a period of time during the Christmas break and this removes the crane from any issues when power is restored.