1646
|
Wednesday, October 18, 2017, 14:54 |
Anders Mjos | Assembly/Bench Test | Standard Operation | | | Source tray assembly electrical check | Source tray meggered today by Anders and
Keith
GND - MSP OL @ 1000V |
|
1648
|
Thursday, October 19, 2017, 14:20 |
Anders Mjos | Assembly/Bench Test | Standard Operation | | | Source tray inspection | Two minor chips in the main 60 kV
insulators on the source tray was inspected
today by Anders, Tom and Aurelia. The chips |
 |
1650
|
Monday, October 23, 2017, 13:38 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#21 | Spent Target move | The spent UC#21 has been moved from the
south hot cell to the spent target vault.
See attached for details |
|
1653
|
Thursday, October 26, 2017, 13:20 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#30,ZrC#7,Ta#44,TiC#4, and Ta#41 | Targets moved to mini storage | SiC#30,ZrC#7,Ta#44,TiC#4, and Ta#41 have
been moved from the spent target storage
to the mini storage. See attached PDF for |
|
1655
|
Thursday, November 09, 2017, 08:46 |
Anders Mjos | Conditioning Station | Repair | | | Communication fiber replaced for HV PLC | After extensive troubleshooting the
communication fiber was found to be damaged
and has been replaced by Gelo. |
|
1660
|
Monday, November 13, 2017, 13:50 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#54 | Spent Target Move | The spent Ta#54 target has been moved
from the south hot cell to the spent target
vault. It was placed in Pail #157 and put |
|
1663
|
Wednesday, November 15, 2017, 08:55 |
David Wang | Conditioning Station | Standard Operation | | | Install shield plug onto TCS and pumping down TCS. | Shielding plug is installed onto TCS. TCS
is being pumped down to keep it under vacuum
for the rest of the year. |
|
1664
|
Friday, December 01, 2017, 16:42 |
Isaac Earle | North Hot-Cell | Repair | | | NHC manipulator service visit | Pete Dudley, manipulator service technician
from CRL, was on site from Nov 27-30 to service
the NHC Model N manipulators (See E-log entry |
 |
1665
|
Wednesday, December 06, 2017, 09:33 |
Anders Mjos | Conditioning Station | Maintenance | | | Running chiller for maintenance tech | Dakine is on site to do maintenance
on the chiller. The tech requested the chiller
to operate. |
|
1667
|
Tuesday, December 19, 2017, 10:40 |
Don Jackson | Crane | Maintenance | | | Crane Power during winter break | The power to the crane and controls
were turned off using the power switch in
the Crane Control room. The main disconnect |
|
1668
|
Tuesday, December 19, 2017, 10:41 |
Anders Mjos | Crane | Maintenance | | | Crane powered down | The target hall crane has been powered
down by Don today in preparation for the
power shutdown over the Holidays. |
|
1669
|
Thursday, December 21, 2017, 15:11 |
Anders Mjos | Conditioning Station | Maintenance | | | Powered down devices | Powered down mechanical pumps in ISAC-I
Experimental hall, vacuum gauge and turbo
pump controllers in ISAC-I B2 North Hot Cell |
|
1671
|
Tuesday, January 02, 2018, 10:46 |
David Wang | ITE/ITW Cooling | Standard Operation | | | Start High active water system. | High active water system was
checked before restart. A small water leak
on resin can supply valve was found. It is |
|
1673
|
Tuesday, January 02, 2018, 14:47 |
Anders Mjos | Conditioning Station | Standard Operation | | | Pumping on secondary vacuum | Tuesday, January 02, 2018, 14:45: TP1S
started |
|
1674
|
Tuesday, January 02, 2018, 15:17 |
Anders Mjos | Conditioning Station | Maintenance | | | Tested chiller | Tested all 3 compressors and MP2 |
|
1675
|
Thursday, January 04, 2018, 13:28 |
Anders Mjos | Conditioning Station | Maintenance | | | Troubleshooting IG1S | TCS:IG1S is reporting vacuum levels that
seem to be too low (1E-10 to 1E-8 Torr).
The gauge was connected to the controller |
|
1676
|
Tuesday, January 16, 2018, 06:50 |
David Wang | ITE/ITW Cooling | Standard Operation | | | Field measurement on old resin tank in silo | The old resin tank has been stored in silo
since last year March. Without crane
the tank up, We use the pole monitor measured |
|
1678
|
Wednesday, January 17, 2018, 06:51 |
David Wang | Conditioning Station | Standard Operation | | | Stop TCS vacuum pumps | I stopped TCS vacuum pumps for coming TM3
move. |
|
1684
|
Wednesday, January 31, 2018, 10:32 |
David Wang | Crane | Standard Operation | | | Target Hall crane annual inspection. | Gordon crane technician Tom finished annual
TH crane inspection today. Everything is
normal. The main hoist brake gaps are checked |
|
1689
|
Wednesday, February 28, 2018, 14:47 |
David Wang | ITE | Standard Operation | | | leak check ITE primary and secondary vacuum vessel. | 2018-02-27: Anders and I finished leak
check on ITE primary and second vacuum vessel
seals. LD connected to ITE BV2 valves between. |
|