Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1671     Entry time: Tuesday, January 02, 2018, 10:46
Author: David Wang 
Category: ITE/ITW Cooling 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Start High active water system. 

High active water system  was  checked before restart. A small water leak on resin can supply valve was found. It is fixed. MP1 and MP2 were started and checked separately. System pressure and flow rate are normal.MP1 is in operation now. 

ELOG V2.9.2-2455