Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1638     Entry time: Tuesday, October 10, 2017, 10:38
Author: David Wang 
Category: ITW 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: 5 shielding blocks have been transferred from ITE to ITW . 

ITW is configured to take proton beam.

ELOG V2.9.2-2455