Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
1638
Entry time:
Tuesday, October 10, 2017, 10:38
Author:
David Wang
Category:
ITW
Type:
Standard Operation
Module:
Target/Number:
Subject:
5 shielding blocks have been transferred from ITE to ITW .
ITW is configured to take proton beam.
ELOG V2.9.2-2455