  1318   Friday, August 12, 2016, 10:59 Anders MjosConditioning StationDevelopmentTM3 HV Test with Service Chase Panel removedWater cooling is performed manually with
CP1. RGA is ON since yesterday. EE is not
connected and in conditioning mode.
 TM3_HV_conditioning_2016-08-12.docxTCS-2016-08-11_TM3_Service_Chase_Panel_Removed.rga 
  313   Tuesday, April 23, 2013, 11:19 Bevan MossConditioning StationStandard OperationTM3N/AHV Test All common A HV test was conducted yesterday
on TM3. There was no target and all items
were tied to common or ground. The conductivity
 TM3_40kV_22042013.txt22042013_TM3_40kV_Archiver.csvRGA_files.zip 
  342   Monday, May 13, 2013, 15:10 Bevan MossConditioning StationStandard OperationTM3N/AHV Test All common

    

       
            
 TM3_40kV_22042013.xlsx 
  1291   Monday, July 25, 2016, 08:15 Anders MjosConditioning StationRepairTM3 HV Test Monday, July 25, 2016, 08:14: Enabled
staging for chiller
Monday, July 25, 2016, 08:33: Disabled
 TM3_HV_conditioning_2016-07-25.docxTCS-2016-07-25_TM3_no_target.rgaTCS-2016-07-26_TM3_no_target.rga 
  1637   Friday, October 06, 2017, 13:25 Anders MjosConditioning StationRepair  HV Test HV was brought up to 70 kV for 1
h without sparks to test the new water installation.
 2017-10-06_HV_Water_Line_Test.xlsx 
  578   Thursday, December 12, 2013, 11:14 Bevan MossConditioning StationStandard OperationTM2 HV Chase Electrical TestWhile under vacuum Travis and I completed
diagnostics of the HV  chase. Majority of
the lines showed OL at 1kV but there were
  
  2385   Thursday, November 03, 2022, 13:15 David WangConditioning StationStandard OperationTM2UCx#40HS line helium pressure test. TM4 with UCx#40at TCS.Helium 70 psi. tested 5minutes at base
leak rate 0.9 xE09 atm.cc/sec on HS line. 
No leak.
  
  2374   Wednesday, October 05, 2022, 09:31 David WangConditioning StationStandard OperationTM4C#4HS line helium pressure test. TM4 with C#4 at TCS.TM4 HS line helium pressure test is done.
70psi helium pressure@ 3XE-8 atm.cc/sec .
No leak. 
  
  2356   Thursday, August 11, 2022, 09:10 David WangConditioning StationStandard OperationTM4SiC #44HS line helium pressure test. Gas line fitting on module top and gas line leak check. HS line helium pressure test is done at
TCS. No leak. I also leak checked gasline
adapter and fittings on TM4 top. No leak. 
  
  2364   Thursday, September 08, 2022, 09:06 David WangConditioning StationStandard OperationTM2UCx#39HS line helium pressure test.TM2 with UCX#39 HS line helium pressure
test is done at TCS. 70 psi helium 3minutes.
No leak @0.0XE-9 atm.cc/sec. 
  
  1980   Monday, September 09, 2019, 06:38 David WangConditioning StationStandard OperationTM4UCx27HS and window line leak check.TM4 HS and window line are helium pressure
checked at TCS. 70 psi helium 5 minutes.
No response @1.2XE-8 atm.cc/sec. They are
  
  485   Wednesday, October 02, 2013, 09:40 Bevan MossConditioning StationStandard OperationTM3NiO#2HP conditioningYesterday the TBHT was ramped to 250 amp
and the TGHT was ramped to 440 amps. Attached
is the data from that run the strip tool
 01102013_TM3_NiO2_TGHT_and_TBHT_ramp_up_eod.txt02102013_TM3_NiO#2_HP_testing_overnight_run.JPG02102013_TM3_NiO#2_HP_testing_overnight_run_archiver.JPG 
  476   Friday, September 27, 2013, 12:53 Bevan MossConditioning StationStandard OperationTM3NiO#2HP TGHT and TBHT conditioning Yesterday TM3 had the TGHT current
raised to 160 amps and the TBHT raised to
200 amps. At this power the TGHT showed typical
 26092013_TM3_NiO#2_HP_testing.JPG26092013_TM3_NiO2_HP_testing.txt 
  489   Friday, October 04, 2013, 19:05 Grant MinorConditioning StationStandard OperationTM3NiO#2HP Conditioning - e-mail notes from Oct 2nd to Oct 4thI have compiled the e-mail comments from
people involved in High-Power Conditioning
of TM3 w/ the new Rev 3 source tray and NiO#2
  
  493   Sunday, October 06, 2013, 15:39 Friedhelm AmesConditioning StationStandard OperationTM3NiO#2HEATERS STARTEDThe high voltage was sparking several times
during the night. It may be correlated with
the cycling of the cooling water temperature
  
  2560   Monday, April 08, 2024, 09:29 David WangCoolingStandard Operation  HALCW system general inspection. water are supplied to both ITE and ITW.
I did a general inspection on HALCW system.
Two small leaks on 2" shut off valves
  
  2495   Friday, October 13, 2023, 11:46 David WangCoolingMaintenance  HALCW system O2 sensor service and calibration.HALCW system O2 sensor service and calibration
were done in Sep 26th. electrolyte and membrane
on rose mount sensor 499ADO were refilled
  
  1444   Monday, March 06, 2017, 08:01 David WangCoolingRepair  HALCW resin tank replacement.HALCW resin tank has been replaced. The
old tank is stored in middle-west silo now.
The field on old resin tank bottom is about
 11x 
  1164   Monday, March 14, 2016, 11:24 David WangITE/ITW CoolingMaintenance  HALCW resin tank filter cartridges are changed todayTwo of resin tank filter cartridges(supply
and return) are changed today. Old cartridges
and bagged and tagged. The contact field
 002.JPG003.JPG006.JPG 
  2781   Monday, March 03, 2025, 15:33 David WangCoolingMaintenance  HALCW resin can loop two filters have been replaced. HALCW resin can loop two filters have been
replaced. no water leak on after job check.
  