Message ID: 2560     Entry time: Monday, April 08, 2024, 09:29
Author: David Wang 
Category: Cooling 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: HALCW system general inspection.  

water are supplied to both ITE and ITW. I did a general inspection on HALCW system. Two small leaks on 2" shut off valves are fixed. No other leak has been found so far. all water flow meters work fine. MP2 pump discharging pressure is ok which is just above 100 psi on local gauge reading. pump noise are low. pump body temperature is less than 45C which is good. 