Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2374     Entry time: Wednesday, October 05, 2022, 09:31
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM4 
Target/Number: C#4 
Subject: HS line helium pressure test. TM4 with C#4 at TCS. 

TM4 HS line helium pressure test is done. 70psi helium pressure@ 3XE-8 atm.cc/sec . No leak.

ELOG V2.9.2-2455