Entry  Friday, September 27, 2013, 10:54, Travis Cave, Conditioning Station, Standard Operation, TM3, NiO#2, module move 
TM#3 with NiO#2 has been moved to the south hot cell from the conditioning station.
Entry  Thursday, September 26, 2013, 14:55, Bevan Moss, Conditioning Station, Standard Operation, TM3, NiO#2, HV conditioning 26092013_TM3_NiO2_HV_conditioning_first_attempt.txt
 The first attempt at HV conditioning of TM3 with the new source tray and NiO#2 target installed. Conditioning so far has been very slow, with the
current increasing quickly to a maximum of 400uA. Voltage in these cases was lowered until the current was below 200uA. Attached is the raw data. It appears
the source tray and target are conditioning just there is either something burning off or there is localized poor vacuum.
    Reply  Thursday, September 26, 2013, 15:25, Bevan Moss, Conditioning Station, Standard Operation, TM3, NiO#2, HV conditioning TM3_NiO#2_Frist_Attempt_HV_conditioning_Bias_and_El_V_and_I.JPG


    
        
            Bevan Moss wrote:
        
        
            
             The first attempt at HV conditioning of TM3 with the new source tray and NiO#2 target installed.
Entry  Thursday, September 26, 2013, 15:00, Bevan Moss, Conditioning Station, Standard Operation, TM3, NiO#2, RGA not connecting 
 Following the helium pressure test Don attempted to connect to the RGA via the network. He was unable to do so. This scan was desired so a pre
and post water scan could be compared to indicate if there was any leaking. It has been decided to carry on as the HV and HP tests are of greater importance.
Don will continue to investigate the RGA. Travis inspected from the conditioning station roof and determined that the RGA is getting power.
Entry  Thursday, September 26, 2013, 14:47, Bevan Moss, Conditioning Station, Maintenance, TM3, NiO#2, Water pumps turned on 
 The water pumps for the conditioning station were turned on at ~11:45. It took longer to start the conditioning station as the air from the leak
test had to be bled off and the make up water tank refilled. The valves on the water supply line were closed slightly to make up for the fact the water
cooled power supply has been removed. DIF2 was installed by Maico so we can measure the flow in the primary side.
Entry  Thursday, September 26, 2013, 14:31, Bevan Moss, South Hot-Cell, Repair, TM3, NiO#2, Activities September 24 - 25 elec_check.pdf
September 24
 After the manipulator repair Maico installed the NiO#2 onto the target module. Once connected I completed a leak test on the HS line with
Isaac. The leak testing cart would not pump down originally (something wrong with the cart) but eventually it did start to work. The cart pumped to its
    Reply  Thursday, September 26, 2013, 14:42, Bevan Moss, South Hot-Cell, Repair, TM3, NiO#2, Activities September 24 - 25 


    
        
            Bevan Moss wrote:
        
        
            
            September 24
Entry  Thursday, September 26, 2013, 09:46, maicodallavalle, Conditioning Station, Repair, TM3, , Leak check / Pressure Test 
TM3 has had all of the water lines pressurized with Helium and the Helium Leak detector was connected to the turbo pumps. There were no leaks detected.
    Reply  Thursday, September 26, 2013, 14:37, Bevan Moss, Conditioning Station, Standard Operation, TM3, NiO#2, Leak check / Pressure Test 


    
        
            maicodallavalle wrote:
        
        
            
            TM3 has had all of the water lines pressurized with Helium and the Helium Leak detector was connected
Entry  Wednesday, September 25, 2013, 13:48, Travis Cave, Conditioning Station, Standard Operation, TM3, NiO#2, Electrical check TM#3_elec_chk_NiO#2_CS.PDF
Electrical check of TM#3 in the conditioning station under vacuum see attached PDF for details.
Entry  Wednesday, September 25, 2013, 11:08, Travis Cave, South Hot-Cell, Standard Operation, TM3, NiO#2, Electrical check TM#3_elec_chk_NiO#2_SHC.PDF
The module was checked electrically this morning before the module move. See the attached PDF for details.
Entry  Wednesday, September 25, 2013, 10:00, Travis Cave, South Hot-Cell, Standard Operation, TM3, NiO#2, module move 
TM#3 with NiO#2 has been moved from the south hot cell to the conditioning station.
Entry  Wednesday, September 25, 2013, 06:59, maicodallavalle, South Hot-Cell, Standard Operation, TM3, , Containment box cover 
The containment box cover has had all  the bolts installed and all bolts were checked with a mirror. TM3 has been raised and is ready for the last
electrical  test before  it goes to the conditioning station.
Entry  Tuesday, September 24, 2013, 14:46, Bevan Moss, South Hot-Cell, Repair, , , Right manipulator repair 
 The right manipulator A-9885 Handle Cable Assembly has been repaired by Maico and myself. We repaired the manipulator following
some verbal instructions from Chad on the modified repair strategy. This allows the repair to be completed without going into the hot cell. The instructions
Entry  Tuesday, September 24, 2013, 08:15, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, Electrical check TM#3_elec_chk_no_target.PDF
Electrical check was done on TM#3 yesterday and again the coil lines to the 60kV common and the coil line to each other failed, as in they had a resistance.
Everything else passed as showing an infinite value, all meggering was done at 1000V unless noted other wise. See attached PDF for details.
Entry  Monday, September 23, 2013, 16:10, Bevan Moss, South Hot-Cell, Repair, TM3, , Activities Sept 20 - 23 2013 
 September 20th
Today was a trying day. When attempting to make the water line  connections for the window the VCR seal fell off several times. Each  time this
happens the seal becomes stuck at the bottom of the  containment box. While trying to replace the seal the nut slipped down  the line to the bottom of
Entry  Monday, September 23, 2013, 13:55, David Wang, South Hot-Cell, Standard Operation, TM3, , window circuit leak check 
This morning, Bevan and I leak checked window circuit on TM3 at SHC after containment box was installed. It took about 20minutes to pump down the circuit
to  0.0xE-9atm.cc/sec. Bevan sprayed helium on both VCR joints and a final splash. No response had been found on leak detector.
Entry  Thursday, September 19, 2013, 15:56, Bevan Moss, South Hot-Cell, Repair, TM3, , Activities for September 18th and 19th IMG_1127.JPGIMG_1134.JPGIMG_1137.JPGIMG_1139.JPGIMG_1143.JPG
September 18th
The wiring harness was completed by Maico and Travis today (see pics) and was installed into the target module. During installation the bracket
went on with ease. The junction box appeared to be hung up on something but did engage eventually. The plug for the collimator is not quite long enough
Entry  Thursday, September 19, 2013, 11:09, Travis Cave, South Hot-Cell, Maintenance, TM3, no target, Electrical check 
Electrical check of TM#3 with no target was performed and it failed. There is a 135M Ohm short
between the coils and a 165M Ohm short between the coil and 60kV common.  All other circuits passed they were infinite in value.
Entry  Thursday, September 19, 2013, 09:08, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, wiring harness 
The wiring harness for TM#3 was made and a continuity and megger test was done on it and it passed, it has since been installed into the hot cell and
placed on the module.
Entry  Tuesday, September 17, 2013, 14:36, Bevan Moss, South Hot-Cell, Standard Operation, TM3, , Containment Box has been removed 
 The containment box has been removed. Tomorrow the wiring harness will be installed.
Entry  Friday, September 13, 2013, 08:05, David Wang, South Hot-Cell, Repair, TM4, , TM4 coil 1 leak check in SHC TM4_coil_1_leak_check.pdf
Leak checked TM4 coil1 in SHC with Isaac . The leak detector only can pump down to 1.5xE-7 atm.cc/sec. The leak detector got the response once the helium
valve is open, not even close to the leak area. The leak detector got a very big response when the helium probe was put close to the coil terminal block
on target front side and spray helium for 2 clicks. The leak detector got a small  response when the probe was put close to water block area and spray
Entry  Friday, September 13, 2013, 07:49, David Wang, Conditioning Station, Development, TM3, , TM3 water lines leak check at CS TM3_water_lines_leak_check_at_CS.pdf
I leak checked TM3 water lines at CS with 60 psi and 80psi helium. The base leak rate is 5.0xe-9 atm.cc/sec. Each circuit 3 minutes helium pressurizing
for each time test. No any respose had been found on leak detector during the test. See attachment