Message ID: 538     Entry time: Tuesday, November 12, 2013, 10:59
Author: Bevan Moss 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number:  
Subject: Electrical Test 

 Don Jackson and Myself completed started an electrical test on TM2. All lines passed the with OL to ground. When testing in between the lines individually there were several lines that read other than OL. It was decided to abandon the testing as there were too many "failures". The results are attached. The testing will be repeated in the conditioning station with vacuum. It is not expected that this will change anything as during a quick visual inspection it appears the lines are touching. Of note the water block jig was removed this morning by Chad.

Attachment 1: tm2_elec_test.pdf  39 kB  | Show | Hide all