Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 521     Entry time: Wednesday, October 23, 2013, 09:28
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM1 
Target/Number: UC#7 
Subject: module move 

TM#1 with UC #7 has been moved from the south west silo to the south hot cell.

ELOG V2.9.2-2455