Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 540     Entry time: Tuesday, November 12, 2013, 14:31
Author: Bevan Moss 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM2 
Target/Number:  
Subject: Turbo pumps started 

 The turbo pumps have been started on TM2 and the conditioning station.

ELOG V2.9.2-2455