Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 529     Entry time: Friday, October 25, 2013, 13:39
Author: Anders Mjos 
Category: ITE 
Type: Standard Operation 
Module: TM3 
Target/Number: NiO#2 
Subject: Padlle wheel frequency measurements 

with TM4 in ITW as measured today in the electrical room by David and Anders.

 

Attachment 1: ITE-TM3-NiO#2-HP-FEBIAD_Water_Flow_wITW-TM4.pdf  75 kB  | Show | Hide all
ELOG V2.9.2-2455