Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 537     Entry time: Tuesday, November 12, 2013, 09:51
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module: TM3 
Target/Number:  
Subject: TM3 disconnection 

TM3 has been disconnected this morning and  purged all HV water lines. I found the power plug for all turbo pump fans wasnt connected  during the last run. That maybe the one of the reason on that ITE TP3 failure.

ELOG V2.9.2-2455