Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 520     Entry time: Tuesday, October 22, 2013, 17:07
Author: Bevan Moss 
Category: Conditioning Station 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: services shut down 

 The turbo pump, roughing pump, have been turned off and the valves for venting opened. The cooling package has also been turned off.

ELOG V2.9.2-2455