TM2 is now in the hot cell with the containment box off for inspection and eventual blank off off the water blocks.
Upon initail inspection the status (fron a hot cell point of view) is:
-Water block jig is equipped/on
-There is a thermocouple line that will need to be removed
-TM2 requires a new front containment box cover - already manufactured and waiting for installation
|