Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 531     Entry time: Thursday, October 31, 2013, 10:36
Author: David Wang 
Category: ITW 
Type: Standard Operation 
Module: TM4 
Target/Number:  
Subject: I moved 5 shielding blocks from ITE to ITW. 

I moved 5 shielding blocks from ITW to ITE. The ITW  is configured to take proton beam.

ELOG V2.9.2-2455