268
|
Monday, March 18, 2013, 12:39 |
Bevan Moss | Conditioning Station | Repair | TM4 | CS Test Target #1 | TGHT PS Failure | The Model of the Power
Supply (PS) is TSQLG 480-20/1500 and serial
number is 2755.02.01.01.09. |
|
267
|
Monday, March 18, 2013, 12:03 |
Bevan Moss | Conditioning Station | Repair | TM4 | CS Test Target #1 | Turbo Pump 1 Failure and Venting | Over the weekend Turbo pump one failed.
It was attempted to restart the turbo in
soft start but that also failed. Although |
|
266
|
Thursday, March 14, 2013, 11:56 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target 1 | Cooling Package Started |
|
|
265
|
Thursday, March 14, 2013, 11:25 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Turbos Started | Turbos started at 11:14. TP1S achieved
full speed in less than 2 minutes. TP1 and
2 tripped at 9 minutes. Restarted and reached |
|
264
|
Thursday, March 14, 2013, 10:04 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target 1 | Cooling Package Started | The cooling package was started at
10:00 today. See attached picture. There
is another snap shot at 10:03. |
|
263
|
Thursday, March 14, 2013, 07:18 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | TM4 window cooling line leak check | It took a long time(more than 1 hour)
to pump down the TM4 window cooling
line during leak check time. The base leak |
|
262
|
Thursday, March 14, 2013, 07:09 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | TM4 electrical test at SHC after windown and containment box back. | TM4 electrical test at SHC after windown
and containment box back is done. Everything
is fine. |
|
261
|
Wednesday, March 13, 2013, 15:26 |
Bevan Moss | Conditioning Station | Development | TM4 | CS Test Target #1 | Roughing Started | Roughing pumps were turned on at
15:23 13/03/2013. |
|
260
|
Wednesday, March 13, 2013, 14:31 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Module Move | TM4 with CS Test Target #1 was moved
from the SHC to the Conditioning Station.
All went well. The welding cables came a |
|
259
|
Wednesday, March 13, 2013, 14:30 |
Bevan Moss | Conditioning Station | Development | | | Faraday Cup | Dave Morris and I investigated the
Faraday Cup today. It was found to be plumed
in the wrong direction (fails in). This is |
|
258
|
Wednesday, March 13, 2013, 11:23 |
chad fisher | South Hot-Cell | Repair | TM4 | | Ground Electrode Leak | The containment box has been re-installed
and the window waterlines reconnected and
leak checked. |
|
257
|
Wednesday, March 13, 2013, 07:22 |
chad fisher | South Hot-Cell | Repair | TM4 | | Ground Electrode Leak / Inspection Results | Further attempts to localize the leak were
unsucessful. The circuit was pressurized
with 60 psi air and snoop solution was applied |
|
256
|
Tuesday, March 12, 2013, 09:18 |
chad fisher | South Hot-Cell | Repair | TM4 | | Ground Electrode Leak | On Monday, March 11 the containment box
was removed from TM4 and a vacuum leak check
preformed in an attempt to locate the leak |
|
255
|
Friday, March 08, 2013, 15:50 |
Bevan Moss | ITE | Standard Operation | TM4 | CS Test Target #1 | Module Move from ITE to SHC | Today David and I moved the module
from ITE to the SHC. Move went very smoothly,
David operated the cameras and has had basic |
|
254
|
Wednesday, March 06, 2013, 14:12 |
David Wang | ITW | Repair | | | ITW EXIT1 tank to module o-ring replacement | ITW
EXIT1 o-ring replacement is fininshed today.
The ITW EXIT 1 is back to ITW. The old o-ring |
|
253
|
Wednesday, March 06, 2013, 12:50 |
Travis Cave | South Hot-Cell | Maintenance | | | module move | ITW EX1 have been moved back to the west
target station from the south hot cell. |
|
252
|
Wednesday, March 06, 2013, 10:09 |
Travis Cave | ITW | Maintenance | | | module move | ITW EX1 has been moved from the west target
station to the south hot cell for the seal
replacement on the west station. |
|
251
|
Friday, March 01, 2013, 11:35 |
David Wang | ITE | Maintenance | TM4 | | Leak check on ITE and TM4. | The
leak check on TM4 and ITE is done. All primary
vacuum vessel , secondary vacuum vessel |
|
250
|
Tuesday, February 26, 2013, 13:53 |
David Wang | Conditioning Station | Repair | TM4 | | Replaced TM4 TP1 | Bevan and I replaced TM4 TP1 today at conditioning
station .The pump will be started this week
when I do ITE and TM4 leak check . |
|
249
|
Tuesday, February 26, 2013, 13:24 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | module move | TM#4 with CS Test Target #1 (dummy target)
moved from the conditioning station to the
east target station. Move went well. |
|