Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 250     Entry time: Tuesday, February 26, 2013, 13:53
Author: David Wang 
Category: Conditioning Station 
Type: Repair 
Module: TM4 
Target/Number:  
Subject: Replaced TM4 TP1 

Bevan and I replaced TM4 TP1 today at conditioning station .The pump will be started this week when I do ITE and TM4 leak check .

ELOG V2.9.2-2455