Message ID: 258     Entry time: Wednesday, March 13, 2013, 11:23
Author: chad fisher 
Category: South Hot-Cell 
Type: Repair 
Module: TM4 
Target/Number:  
Subject: Ground Electrode Leak 

The containment box has been re-installed and the window waterlines reconnected and leak checked.

The window lines did pass the leak check, however the leak dectoctor did not pump down past 5.8 x 10-9.

The front cover has also been reinstalled.

I have requested that the module have an electrical check before it moves as the containment box has been off as well as the water blocks being leak checked. Either one of these procedures could causes the water liunes and blocks to alter there position sightly which could cause as short...this is why I have requested an electrical check.

 