86
|
Wednesday, March 09, 2016, 17:09 |
Ron Kuramoto | Cyclotron | Development | EX4N new housing installation | The new EX4N housing assembly drawing TEC0071
(unfinished) was installed and connected
to the EX4 tank side port flange over a 3 |
|
|
51
|
Wednesday, January 28, 2015, 14:33 |
Travis Cave | Cyclotron | Standard Operation | Day two of in tank work | All copper blocker removed from the cyclotron
and first radiation survey done. Shields
start tomorrow. |
|
|
52
|
Thursday, January 29, 2015, 14:53 |
Travis Cave | Cyclotron | Standard Operation | Day three of in tank work | Over 50% of the shields are in some 700's
left and the monitor box covers. |
|
|
50
|
Tuesday, January 27, 2015, 14:40 |
Travis Cave | Cyclotron | Standard Operation | Day one of in tank work | Day one of RH in tank work for the cyclotron
(shields and blockers stuff like that) many
pictures were taken. |
|
|
53
|
Friday, January 30, 2015, 15:02 |
Travis Cave | Cyclotron | Standard Operation | Day four of in tank work | All shields, ladders and pothole covers
are in. One rad survey left to do. |
|
|
54
|
Monday, February 02, 2015, 14:28 |
Travis Cave | Cyclotron | Standard Operation | Day five of in tank work | Final Radiation Survey done. All in tank
work completed bridge removed from the tank. |
|
|
77
|
Wednesday, February 03, 2016, 08:16 |
Dan McDonald | Cyclotron | Standard Operation | Cyclotron lid up | Lid up procedure Started at 12:00pm.
Initial numbers. # 1-47,2-49,3-45,4-47,5-47,6-47,7-49,8-45,9-50,10-50,11-51,12-49.
After a number of unsuccessful attempts at |
|
|
45
|
Friday, July 04, 2014, 07:21 |
Dan McDonald | Elevation Jack | Standard Operation | Cyclotron lid down July-2- 2014 | Cyclotron lid down was successfully completed
on July 2 2014. Lid went partially down before
jack nine had to be jogged to catch up to |
|
|
105
|
Tuesday, January 16, 2018, 13:43 |
Travis Cave | Cyclotron | Standard Operation | Cyclotron in tank work | All cyclotron in tank work has been
completed. |
|
|
117
|
Wednesday, February 05, 2020, 12:37 |
Adam Newsome | Cyclotron | Development | Cyclotron Vacuum Cleaning Tool - Initial Test | The vacuum cleaning tool (TRH1366, vacuum
cleaning configuration) was tested in the
cyclotron tank. The following test were performed: |
|
|
118
|
Wednesday, February 05, 2020, 12:44 |
Adam Newsome | Cyclotron | Development | Cyclotron Small Object Retrival Tool - Intial Test | The small object retrieval tool was tested
in the cyclotron tank for the first time.
At this time, there are no known accessible |
|
|
133
|
Wednesday, May 05, 2021, 12:20 |
Adam Newsome | Infrastructure | Development | Cyclotron RH Control Room: Outlets Installed | The following outlets were installed by
Electrical Services Group in order to facilitate
upgrading power supplies for Cyclotron Remote |
|
|
123
|
Thursday, July 16, 2020, 11:57 |
Adam Newsome | Cyclotron | Development | Cyclotron Mockup: Orbital Position Pendant Upgrade | The pendant used for controlling the orbital
motion of the bridge mockup was upgraded.
Features of the new pendant include: |
|
|
21
|
Monday, March 18, 2013, 15:12 |
Isaac Earle | Cyclotron | Maintenance | Cyclotron Magnet Face Gap Measurements | Measurements of the cyclotron magnet face
gap were taken on March 15, 2013 at two locations
around the tank with the cyclotron lid in |
8x |
|
44
|
Wednesday, July 02, 2014, 16:46 |
Grant Minor | Elevation Jack | Standard Operation | Cyclotron Lid-Up Report for 27 June 2014 | The cyclotron lid was raised on June 27th,
2014. Start time was 1:05pm end time
was 2:17pm (good!) Dan McDonald collected |
|
|
28
|
Thursday, January 23, 2014, 18:47 |
Grant Minor | Elevation Jack | Standard Operation | Cyclotron Lid-Up Report - 22 Jan 2014 | Yesterday Grant Minor (me), Maico Dalla
Valle, Dan Louie, and Arthur Leung worked
with Operations to perform the Cyclotron |
6x |
|
64
|
Thursday, March 26, 2015, 15:48 |
Grant Minor | Elevation Jack | Standard Operation | Cyclotron Lid-Up 26 March 2015 | Lid was raised today (2nd time during 2015
shutdown) for additional inflector work.
Dan and Maico report that the lid |
|
|
41
|
Monday, March 03, 2014, 15:07 |
Grant Minor | Elevation Jack | Standard Operation | Cyclotron Lid-Down Report Monday 3-March-2014 | The Cyclotron Lid Down was successfully
completed today on Work Permit C2014-03-03-6.
The system only tripped twice on |
|
|
103
|
Monday, January 08, 2018, 09:04 |
Maico Dalla Valle / Jason Kapalka | Cyclotron | Standard Operation | Cyclotron Lid Up | Remote Handing is ready for January, 8 2018
Cyclotron lid up. Elevating system service
has been completed.
|
|
|
68
|
Thursday, April 16, 2015, 15:26 |
Grant Minor | Elevation Jack | Maintenance | Cyclotron Elevating System Maintenance Rotation Record - Updated 16 Apr 2015 | |
|