97
|
Tuesday, March 07, 2017, 09:31 |
Jason Kapalka | Shielding | Standard Operation | Blockers/Shields/Covers/Ladders | The seven copper blockers were removed from
the Cyclotron tank by the RH group using
the service bridge, lift
|
|
96
|
Friday, March 03, 2017, 13:30 |
Jason Kapalka | Cyclotron | Standard Operation | CP continuity test | Performed continuity test at Cyclotron center
post with RH and Operations group members
using the service bridge,
|
|
95
|
Tuesday, February 28, 2017, 15:45 |
Jason Kapalka | Cyclotron | Standard Operation | 2C extraction probe removal and reinstallation | 2C extraction probe was removed from cyclotron
tank on 2017-02-07 by RH and Probes group
members with service
|
|
94
|
Tuesday, February 21, 2017, 13:40 |
Isaac Earle | Cyclotron | Standard Operation | HE2 Probe Returned to Cyclotron | The HE2 probe was reinstalled in
the cyclotron this morning following the
procedure in Document #126165. An orbital |
|
93
|
Thursday, February 09, 2017, 15:21 |
Isaac Earle | Cyclotron | Standard Operation | HE2 Probe Removed | The HE2 probe was
removed from the cyclotron today following |
|
92
|
Monday, February 06, 2017, 20:32 |
Jason Kapalka | Elevation Jack | Maintenance | 2017 Cyclotron Elevating System Maintenance | The Cyclotron Elevating System planned maintenance
work this year was performed on Jack Station
#3, #8, #9, and #10.
|
|
91
|
Tuesday, January 31, 2017, 14:41 |
Travis Cave | Cyclotron | Standard Operation | Shield installation | 200, 400, 500, 600, and a pallet of 700
series of shield have been installed in the
cyclotron. |
|
90
|
Wednesday, September 14, 2016, 11:30 |
Dan McDonald | Elevation Jack | Maintenance | Jack station 10B | Annual jack maintenance : Jack 10b upon
inspection it was found that the output shaft
seal on 10b was in need of replacement. In |
14x |
89
|
Thursday, June 30, 2016, 13:47 |
Dan McDonald | Trolley | Maintenance | Lift trolley | Maintenance has been performed on the lift
trolley, re sealed the main drive gear box
it was quite dry inside and in need of new |
|
88
|
Thursday, April 07, 2016, 11:04 |
Travis Cave | Cyclotron | Standard Operation | Closed the shield door | The shield door on the B2 level of the
RH building has been closed. |
|
87
|
Tuesday, March 15, 2016, 13:56 |
Dan McDonald | Cyclotron | Standard Operation | Lid Down 2016 | Lid down Started at 12:15, station and
count numbers. Lid went down with out incident
as station 1 and 7 show the counters will |
|
86
|
Wednesday, March 09, 2016, 17:09 |
Ron Kuramoto | Cyclotron | Development | EX4N new housing installation | The new EX4N housing assembly drawing TEC0071
(unfinished) was installed and connected
to the EX4 tank side port flange over a 3 |
  |
85
|
Tuesday, March 01, 2016, 13:27 |
Travis Cave | Cyclotron | Standard Operation | Ex 2C install | EX 2C has been installed back into the
cyclotron. |
|
84
|
Thursday, February 25, 2016, 11:41 |
Travis Cave | Cyclotron | Standard Operation | Ex 2C removal | Ex 2C has been removed from the cyclotron.
A trip into the tank was needed to free the
probe, hung up on the usual spot. |
|
83
|
Friday, February 19, 2016, 10:17 |
Isaac Earle | Cyclotron | Standard Operation | HE1 Probe Installed in Cyclotron | The HE1 Probe was reinstalled into
the cyclotron this morning following Section
3.2 in Document-126165 (to be reviewed and |
|
82
|
Tuesday, February 16, 2016, 16:32 |
Isaac Earle | Cyclotron | Standard Operation | HE1 Probe Removed from Cyclotron | The HE1 Probe was removed from the cyclotron
this morning following the procedure in Document-126165
(currently in draft status, to be released |
|
81
|
Wednesday, February 10, 2016, 14:53 |
Travis Cave | Cyclotron | Standard Operation | shadow shields | All cyclotron in tank work is completed. |
|
80
|
Tuesday, February 09, 2016, 14:48 |
Travis Cave | Cyclotron | Standard Operation | shadow shields | All shadow shields have been installed.
Ladders, the pothole covers and the second
rad survey will be done tomorrow. |
|
79
|
Friday, February 05, 2016, 14:57 |
Travis Cave | Service Bridge | Maintenance | outrigger problem | outrigger 1 had a power failure, bridge
was removed power restored and outrigger
parked, outrigger will be looked at once |
|
78
|
Friday, February 05, 2016, 14:55 |
Travis Cave | Shielding | Standard Operation | shadow shields | all 200, 400, 500, 600, and some 700 series
of shield are in. |
|