16
|
Friday, March 08, 2013, 18:42 |
Grant Minor | Cyclotron | Repair | Tank lid not at upper limit and resulting effects | This morning during routine service bridge
work in the Cyclotron tank, it was observed
by Travis Cave that the cable tray for the |
![Contact_btwn_cable_tray_and_upper_equip_8Mar2013.PNG Contact_btwn_cable_tray_and_upper_equip_8Mar2013.PNG](attachment.png) ![Jack_upper_limit_switch_not_engaged_8Mar2013.png Jack_upper_limit_switch_not_engaged_8Mar2013.png](attachment.png) ![Jack_upper_limit_switch_engaged_8Mar2013.png Jack_upper_limit_switch_engaged_8Mar2013.png](attachment.png) ![Cyclotron_height_stick_half_inch_from_roof_8Mar2013.JPG Cyclotron_height_stick_half_inch_from_roof_8Mar2013.JPG](attachment.png) |
15
|
Tuesday, March 05, 2013, 14:11 |
Travis Cave | Cyclotron | Standard Operation | Setup and the Installation of the HE 1 probe. | Setup of the HE 1 probe is difficult has
we have no mockup of it to properly setup
cameras and equipment for it. This is problem |
|
14
|
Wednesday, February 27, 2013, 12:08 |
Travis Cave | Cyclotron | Standard Operation | Installation of 2C | 2C has been installed located on all QDLs
and all the numbers, continuity check done
and passed. Bridge has been removed from |
|
13
|
Wednesday, February 13, 2013, 08:55 |
maicodallavalle | Service Bridge | Repair | Service Bridge/Carrier Hydraulic Jacks | On Monday February 4TH the Service
Bridge was being lifted into the Cyclotron
with the Carrier. It was noticed that one |
|
12
|
Wednesday, February 06, 2013, 18:07 |
Grant Minor | Elevation Jack | Maintenance | Lid-down yoke gap measurements from 1994 | Attached is a scan of a handwritten record
from 1994 showing yoke-to-upper-structure
gap measurements from 1994, both L and R |
|
11
|
Wednesday, February 06, 2013, 17:50 |
Grant Minor | Elevation Jack | Maintenance | Service records compiled by G. Minor | Attached is a compiled record showing the
years of service of the jacks, upper bearing,
and gear reducers, prepared by Grant Minor |
|
10
|
Wednesday, February 06, 2013, 17:42 |
Grant Minor | Elevation Jack | Maintenance | In-situ jack power screw lubrication inspection - Stations 9, 10, 11, and 6 | Due to concerns raised regarding the state
of the lubrication of the power screws at
Station 9, the lubrication was visually inspected |
16x |
9
|
Monday, February 04, 2013, 13:52 |
Grant Minor | Service Bridge | Repair | Hydraulic cylinder failure on service bridge | The hydraulic cylinder on the West side
of the service bridge (used to raise the
bridge for insertion into the Cyclotron) |
6x |
8
|
Wednesday, January 30, 2013, 14:44 |
Grant Minor | Elevation Jack | Standard Operation | Further lid-up notes from Dan Louie | Dan Louie's e-mail comments from 30 Jan
2013 are attached.
- Grant |
|
7
|
Tuesday, January 29, 2013, 18:49 |
Grant Minor | Elevation Jack | Standard Operation | Lid-up complete - summary notes | Lid-up was first attempted yesterday (Jan
28th) by Dan Louie, Arthur Leung, and Maico
Dalla Valle. They experienced problems |
|
6
|
Thursday, October 25, 2012, 13:58 |
maicodallavalle | Service Bridge | Maintenance | Orbit Drive | It was observed during the last time the
Cyclotron service bridge was used the orbit
drive chain had a lot of slack. The drive |
|
5
|
Tuesday, September 25, 2012, 08:57 |
maicodallavalle | Elevation Jack | Maintenance | 2012 Service Maintance of #4 Station Jacking System | Shut down work for 2012.Replaced serviced
Jacking Station #6. Tapered alignment pins
were damaged. They were skimmed and checked |
|
4
|
Friday, February 17, 2012, 15:07 |
Don Jackson | Trolley | Repair | Video Trolley Failed in Cyclotron Tank | All control to the video trolley was lost
during remote photographing of components
in the cyclotron. The control system and |
![Stuck_Video_Trolley_Feb_17_2012_005.jpg Stuck_Video_Trolley_Feb_17_2012_005.jpg](attachment.png) |
3
|
Tuesday, February 14, 2012, 15:40 |
Grant Minor | Trolley | Standard Operation | 2C Removal - all 4 QDLs were actuated remotely this year! | Today Remote Handling staff (Maico Dalla
Valle, Travis Cave) used the Remote Handling
2C probe removal trolley to remove the probe |
![2C_probe_Feb_14_2012_labelled.JPG 2C_probe_Feb_14_2012_labelled.JPG](attachment.png) |
2
|
Tuesday, February 07, 2012, 18:09 |
Grant Minor | Service Bridge | Repair | Service Bridge Center Post Bearing Maintenance and Orbit Counter (2011/2012) | Repair
of Orbit Limit Switch Plastic Belt
During |
![Stripped_Orbit_Limit_Belt_Sept_23_2011.JPG Stripped_Orbit_Limit_Belt_Sept_23_2011.JPG](attachment.png) ![Bridge_Belt_Repair_Fall_2011.JPG Bridge_Belt_Repair_Fall_2011.JPG](attachment.png) ![Orbit_Counter_Wheel_Just_Before_Skip_Point.JPG Orbit_Counter_Wheel_Just_Before_Skip_Point.JPG](attachment.png) ![D7900_detail_Feb_7_2012.JPG D7900_detail_Feb_7_2012.JPG](attachment.png) |
1
|
Monday, June 27, 2011, 10:38 |
John Wong | General | Routine | Testing RH elog | |
|