180
|
Monday, June 03, 2024, 14:29 |
Riley Sykes | Trolleys serviced | Maintenance | Upper Resonator Trolley | 24 Month, 60 month
service completed. Bearings for drive motor |
|
179
|
Friday, May 31, 2024, 12:47 |
Riley Sykes | Trolleys serviced | Maintenance | Tool Trolley Scheduled Maintenance | 60 month service completed. Bearings
for drive motor wheels regreased, Reducer
repacked with Molub Alloy 777-1 ES, |
|
178
|
Friday, May 31, 2024, 11:28 |
Riley Sykes | Service Bridge | Maintenance | Outrigger mechanical inspection | Both outriggers were inspected and
were found to be mechanically sound. No damage
to components or hardware visible, will revisit |
|
177
|
Friday, May 31, 2024, 08:57 |
Riley Sykes | Carrier | Maintenance | Carrier Drive motor/gear reducer | Motor/Gearbox unit removed from carrier
and fully inspected and serviced. Oil changed
on May 29th using Mobil 600 W Super Cylinder |
|
176
|
Thursday, May 16, 2024, 12:33 |
Riley Sykes | Service Bridge | Maintenance | Center Post Bearing | Center post bearing on service bridge
inspected, turned freely by hand and regreased
with Molub-Alloy 777-1 ES |
|
175
|
Tuesday, May 14, 2024, 10:53 |
Riley Sykes | Carrier | Maintenance | Carrier underrail wheels maintenance | All 4 Under rail wheels serviced
and cleaned. All Timken bearings repacked
with grease. No defects in any bearing set. |
|
174
|
Tuesday, May 07, 2024, 09:35 |
Adam Newsome | Elevation Jack | Standard Operation | Lid down operation (third) - 2024 | A third lid down
operation took place over May 6-7, 2024. |
 |
173
|
Thursday, May 02, 2024, 12:42 |
Adam Newsome | Elevation Jack | Standard Operation | Lid up operation (third) - 2024 | The cyclotron lid was raised starting ~11:45am
on 2024-05-02 and finishing at ~12:12pm
under work permit C2024-05-02-5. |
|
172
|
Tuesday, April 30, 2024, 15:00 |
Adam Newsome | Cyclotron | Standard Operation | Lid down operation (second) - 2024 | A second lid down
operation took place on April 30, 2024. |
|
171
|
Wednesday, April 24, 2024, 14:26 |
Adam Newsome | Elevation Jack | Standard Operation | Lid up operation (second) - 2024 | Due to an issue with resonator latching,
there was a need to raise the cyclotron lid
a second time this shutdown. |
|
170
|
Friday, April 19, 2024, 15:18 |
Adam Newsome | Cyclotron | Standard Operation | Lid down operation - 2024 | The lid down operation
took place on April 19, 2024. |
|
169
|
Monday, February 26, 2024, 11:52 |
Adam Newsome | Cyclotron | Repair | Controls issue - CAMAC power supply | An issue was encountered on 2024-02-23
when attempting to operate the lift trolley.
|
|
168
|
Friday, February 16, 2024, 11:11 |
Adam Newsome | Trolley | Repair | Lift Trolley: vertical motion failure, motor relays replaced | Today (2024-02-16) when operating the lift
trolley to install shields in the cyclotron,
the vertical motion was observed to be intermittently |
|
167
|
Friday, February 09, 2024, 15:43 |
Adam Newsome | Elevation Jack | Standard Operation | Lid up operation - 2024 | The cyclotron lid was raised starting ~10:30am
on 2024-02-06 and finishing at ~3:30pm on
2024-02-08, under work permit C2024-02-06-4. |
 |
166
|
Thursday, February 08, 2024, 08:50 |
Adam Newsome | Elevation Jack | Maintenance | Elevating system - station 10 motor contactor issue | It was observed during lid up operation
on 2024-02-08, approximately halfway through
raising the lid, that the motor contactor |
|
165
|
Wednesday, February 07, 2024, 12:04 |
Adam Newsome | Elevation Jack | Repair | Elevating system - brake master relay fuse issue | It was observed when attempting lid up
operation on 2024-02-06 that the brakes for
each of the jacks were not operating correctly. |
|
164
|
Wednesday, January 31, 2024, 15:06 |
Eric Lahe | Elevation Jack | Maintenance | Elevating System - Annual Station Swap 2023-2024 | The annual elevating system maintenance
for the 2023-2024 shutdown following Document-220322,
Work done after electrical lockout |
|
163
|
Wednesday, January 31, 2024, 11:39 |
Adam Newsome | Elevation Jack | Maintenance | Jack station 11: synchro replaced | Because of observed noise on the synchro
at jack station 11 during recent shutdown
lid up/down operations, the synchro at this |
|
162
|
Tuesday, January 23, 2024, 14:03 |
Adam Newsome | Elevation Jack | Maintenance | Inspection of elevating system motor contacts | Motor contactors for the cyclotron elevating
system jacks were inspected on 2025-01-23
by Joel Semilla under work permit C2024-01-19-1. |
 |
161
|
Tuesday, November 14, 2023, 12:38 |
Nadia Jorgenson | Service Bridge | Maintenance | Bridge Orbit Counter Work in 2023 | All the bearings on both
the upper and lower wheel were replace to |
|