  180   Monday, June 03, 2024, 14:29 Riley SykesTrolleys servicedMaintenanceUpper Resonator Trolley 24 Month, 60 month
service completed. Bearings for drive motor
  
  179   Friday, May 31, 2024, 12:47 Riley SykesTrolleys servicedMaintenanceTool Trolley Scheduled Maintenance 60 month service completed. Bearings
for drive motor wheels regreased, Reducer
repacked with Molub Alloy 777-1 ES,
 Tool_Trolley_Drive_Motor.jpg 
  178   Friday, May 31, 2024, 11:28 Riley SykesService BridgeMaintenanceOutrigger mechanical inspection Both outriggers were inspected and
were found to be mechanically sound. No damage
to components or hardware visible, will revisit
  
  177   Friday, May 31, 2024, 08:57 Riley SykesCarrierMaintenanceCarrier Drive motor/gear reducer Motor/Gearbox unit removed from carrier
and fully inspected and serviced. Oil changed
on May 29th using Mobil 600 W Super Cylinder
  
  176   Thursday, May 16, 2024, 12:33 Riley SykesService BridgeMaintenanceCenter Post Bearing Center post bearing on service bridge
inspected, turned freely by hand and regreased
with Molub-Alloy 777-1 ES
  
  175   Tuesday, May 14, 2024, 10:53 Riley SykesCarrierMaintenanceCarrier underrail wheels maintenance All 4 Under rail wheels serviced
and cleaned. All Timken bearings repacked
with grease. No defects in any bearing set.
  
  174   Tuesday, May 07, 2024, 09:35 Adam NewsomeElevation JackStandard Operation Lid down operation (third) - 2024 A third lid down
operation took place over May 6-7, 2024.
 Motor_Contactor_6_-_2024.PNGElevation_System_Checklist_-_2024_Lid_down_-_third.pdf 
  173   Thursday, May 02, 2024, 12:42 Adam NewsomeElevation JackStandard OperationLid up operation (third) - 2024The cyclotron lid was raised starting ~11:45am
on 2024-05-02 and  finishing at ~12:12pm
under work permit C2024-05-02-5. 
 Elevation_System_Checklist_-_2024_-_May.pdf 
  172   Tuesday, April 30, 2024, 15:00 Adam NewsomeCyclotronStandard OperationLid down operation (second) - 2024 A second lid down
operation took place on April 30, 2024. 
 Elevation_System_Checklist_-_2024_-_Second_Lid_Down.pdf 
  171   Wednesday, April 24, 2024, 14:26 Adam NewsomeElevation JackStandard OperationLid up operation (second) - 2024Due to an issue with resonator latching,
there was a need to raise the cyclotron lid
a second time this shutdown.
 Elevation_System_Checklist_-_2024_-_Second_Lid_Up.pdf 
  170   Friday, April 19, 2024, 15:18 Adam NewsomeCyclotronStandard OperationLid down operation - 2024The lid down operation
took place on April 19, 2024. 
 Elevation_System_Checklist_-_2024.xlsx 
  169   Monday, February 26, 2024, 11:52 Adam NewsomeCyclotronRepairControls issue - CAMAC power supplyAn issue was encountered on 2024-02-23
when attempting to operate the lift trolley.
  
  168   Friday, February 16, 2024, 11:11 Adam NewsomeTrolleyRepairLift Trolley: vertical motion failure, motor relays replacedToday (2024-02-16) when operating the lift
trolley to install shields in the cyclotron,
the vertical motion was observed to be intermittently
  
  167   Friday, February 09, 2024, 15:43 Adam NewsomeElevation JackStandard OperationLid up operation - 2024The cyclotron lid was raised starting ~10:30am
on 2024-02-06 and finishing at ~3:30pm on
2024-02-08, under work permit C2024-02-06-4.
 Elevation_System_Checklist_-_February_2024.xlsxElevation_System_Thermal_Imaging_Report_-_Lid_Up_Feb_2024.pdf 
  166   Thursday, February 08, 2024, 08:50 Adam NewsomeElevation JackMaintenanceElevating system - station 10 motor contactor issueIt was observed during lid up operation
on 2024-02-08, approximately halfway through
raising the lid, that the motor contactor
  
  165   Wednesday, February 07, 2024, 12:04 Adam NewsomeElevation JackRepairElevating system - brake master relay fuse issueIt was observed when attempting lid up
operation on 2024-02-06 that the brakes for
each of the jacks were not operating correctly.
  
  164   Wednesday, January 31, 2024, 15:06 Eric LaheElevation JackMaintenanceElevating System - Annual Station Swap 2023-2024 The annual elevating system maintenance
for the 2023-2024 shutdown following Document-220322, 
Work done after electrical lockout
  
  163   Wednesday, January 31, 2024, 11:39 Adam NewsomeElevation JackMaintenanceJack station 11: synchro replacedBecause of observed noise on the synchro
at jack station 11 during recent shutdown
lid up/down operations, the synchro at this
  
  162   Tuesday, January 23, 2024, 14:03 Adam NewsomeElevation JackMaintenanceInspection of elevating system motor contactsMotor contactors for the cyclotron elevating
system jacks were inspected on 2025-01-23
by Joel Semilla under work permit C2024-01-19-1.
 Elev_Motor_1.jpgElev_Motor_2.jpg 
  161   Tuesday, November 14, 2023, 12:38 Nadia JorgensonService BridgeMaintenanceBridge Orbit Counter Work in 2023 All the bearings on both
the upper and lower wheel were replace to
  