ID |
Date |
Author |
Category |
Type |
Subject |
Text |
|
|
15
|
Tuesday, March 05, 2013, 14:11 |
Travis Cave | Cyclotron | Standard Operation | Setup and the Installation of the HE 1 probe. | Setup of the HE 1 probe is difficult has
we have no mockup of it to properly setup
cameras and equipment for it. This is problem |
|
|
186
|
Tuesday, July 23, 2024, 13:27 |
Riley Sykes | Carrier | Maintenance | Service/Maintenance checks | 1,2, 5 Year Service and maintenance
package completed on Carrier. All reducers
repacked with Molub-Alloy 777-1 ES grease. |
|
|
183
|
Friday, June 14, 2024, 10:04 |
Riley Sykes | Service Bridge | Maintenance | Service/ Bridge inspection | Yearly, 2 Year and 5 Year service
completed. All bearings on support frames
turn freely and were regreased with Molub |
|
|
73
|
Tuesday, October 27, 2015, 07:50 |
maicodallavalle | Elevation Jack | Standard Operation | Service to Station # 9 Right side | Station #9 Cleaning of discoloration-
The right side Jack screw nut and
worm screw (mating parts in the right side |
9x |
|
11
|
Wednesday, February 06, 2013, 17:50 |
Grant Minor | Elevation Jack | Maintenance | Service records compiled by G. Minor | Attached is a compiled record showing the
years of service of the jacks, upper bearing,
and gear reducers, prepared by Grant Minor |
|
|
188
|
Wednesday, July 24, 2024, 14:26 |
Riley Sykes | Elevation Jack | Maintenance | Service inspection and relubrication | Jack 7R pulled apart and inspected
for deficiencies, all parts deemed to be
in working order, jack was rebuilt and lubricated |
|
|
189
|
Wednesday, August 07, 2024, 14:24 |
Riley Sykes | Elevation Jack | Maintenance | Service inspection and relubrication | Jack 7L pulled
apart and inspected for deficiencies, alignment |
|
|
13
|
Wednesday, February 13, 2013, 08:55 |
maicodallavalle | Service Bridge | Repair | Service Bridge/Carrier Hydraulic Jacks | On Monday February 4TH the Service
Bridge was being lifted into the Cyclotron
with the Carrier. It was noticed that one |
|
|
2
|
Tuesday, February 07, 2012, 18:09 |
Grant Minor | Service Bridge | Repair | Service Bridge Center Post Bearing Maintenance and Orbit Counter (2011/2012) | Repair
of Orbit Limit Switch Plastic Belt
During |
|
|
185
|
Wednesday, July 17, 2024, 15:02 |
Adam Newsome | Infrastructure | Standard Operation | Safety Walkaround Complete - RH Shop, Back Shop, B1, and B2 levels | A safety walkaround for July 2024 was completed
for the B1 and B2 levels by A. Newsome, and
for the main shop and back shop by R. Sykes. |
|
|
190
|
Thursday, October 10, 2024, 12:30 |
Adam Newsome | Infrastructure | Standard Operation | Safety Walkaround Complete - RH Shop, Back Shop, B1, and B2 levels | A safety walkaround was completed for the
RH Shop, Back Shop, B1, and B2 levels.
The resulting spreadsheet can be |
|
|
193
|
Monday, January 06, 2025, 13:57 |
Adam Newsome | Infrastructure | Standard Operation | Safety Walkaround Complete - RH Building Shop and Back Shop | A safety walkaround was completed for the
RH building shop and back shop.
The resulting spreadsheet can be |
|
|
192
|
Friday, January 03, 2025, 10:20 |
Adam Newsome | Infrastructure | Standard Operation | Safety Walkaround Complete - RH Building B1 and B2 Level | A safety walkaround was completed for the
RH building B1 and B2 levels.
The resulting spreadsheet can be |
|
|
110
|
Friday, February 23, 2018, 15:44 |
Jason Kapalka | Elevation Jack | Repair | Replacement of Elevating System wiring | On January 8, 2018, while troubleshooting
the Cyclotron Elevating System during the
lid-up operation, the
|
|
|
63
|
Thursday, March 19, 2015, 13:14 |
maicodallavalle | Shielding | Standard Operation | Remote Handling B2 level Shielding door | The Remote Handling B2 level Shielding
door has been closed. |
|
|
22
|
Tuesday, March 19, 2013, 19:17 |
Grant Minor | Elevation Jack | Standard Operation | Re-indexing of all jack station "zero" yoke elevations | The dimension between the yokes and the
Cyclotron upper structure primary beams was
set to .25" nominal at all jack stations |
|
|
99
|
Tuesday, March 14, 2017, 12:02 |
Jason Kapalka | Cyclotron | Standard Operation | Radiation survey | The unshielded radiation survey was performed
in the Cyclotron tank by the RH group using
the service bridge,
|
|
|
138
|
Tuesday, February 08, 2022, 11:39 |
Adam Newsome | Cyclotron | Development | Radiation Survey - sampling rate error | When attempting to perform the radiation
survey, the program displayed an error at
startup stating that the software was not |
|
|
155
|
Thursday, August 03, 2023, 10:43 |
Adam Newsome | Trolley | Development | Previous generation video trolley decommissioned | The "old" video trolley featuring
scissor mechanism and DSLR camera has officially
been decommissioned. Going forward, Video |
|
|
146
|
Thursday, October 06, 2022, 17:15 |
Adam Newsome | Elevation Jack | Maintenance | Preventative Maintenance: MCC-E elevating system motor contactors | Under work permit C2022-10-04-1,
the motor contactors for jack motors 1 through
12 were replaced. The contactors showed signs |
|