  15   Tuesday, March 05, 2013, 14:11 Travis CaveCyclotronStandard OperationSetup and the Installation of the HE 1 probe.Setup of the HE 1 probe is difficult has
we have no mockup of it to properly setup
cameras and equipment for it. This is problem
  
  186   Tuesday, July 23, 2024, 13:27 Riley SykesCarrierMaintenanceService/Maintenance checks 1,2, 5 Year Service and maintenance
package completed on Carrier. All reducers
repacked with Molub-Alloy 777-1 ES grease.
  
  183   Friday, June 14, 2024, 10:04 Riley SykesService BridgeMaintenanceService/ Bridge inspection Yearly, 2 Year and 5 Year service
completed. All bearings on support frames
turn freely and were regreased with Molub
  
  73   Tuesday, October 27, 2015, 07:50 maicodallavalleElevation JackStandard OperationService to Station # 9 Right side Station #9 Cleaning of  discoloration-
The right side Jack screw nut and
worm screw (mating parts in the right side
 9x 
  11   Wednesday, February 06, 2013, 17:50 Grant MinorElevation JackMaintenanceService records compiled by G. MinorAttached is a compiled record showing the
years of service of the jacks, upper bearing,
and gear reducers, prepared by Grant Minor
 Cyclotron_Elevation_Maintenance_Rotation_Record_17Dec2012.pdf 
  188   Wednesday, July 24, 2024, 14:26 Riley SykesElevation JackMaintenanceService inspection and relubrication Jack 7R pulled apart and inspected
for deficiencies, all parts deemed to be
in working order, jack was rebuilt and lubricated
  
  189   Wednesday, August 07, 2024, 14:24 Riley SykesElevation JackMaintenanceService inspection and relubrication  Jack 7L pulled
apart and inspected for deficiencies, alignment
  
  13   Wednesday, February 13, 2013, 08:55 maicodallavalleService BridgeRepairService Bridge/Carrier Hydraulic JacksOn Monday February 4TH  the Service
Bridge was being lifted into  the Cyclotron
with the Carrier. It was noticed that one
 Hydraulic_Jack_RC-254.pdf 
  2   Tuesday, February 07, 2012, 18:09 Grant MinorService BridgeRepairService Bridge Center Post Bearing Maintenance and Orbit Counter (2011/2012)Repair
of Orbit Limit Switch Plastic Belt
During
 Stripped_Orbit_Limit_Belt_Sept_23_2011.JPGBridge_Belt_Repair_Fall_2011.JPGOrbit_Counter_Wheel_Just_Before_Skip_Point.JPGD7900_detail_Feb_7_2012.JPGCyclotron_Orbit_Counter_Wheel_emails_Mar-Sep_2011.pdf 
  185   Wednesday, July 17, 2024, 15:02 Adam NewsomeInfrastructureStandard OperationSafety Walkaround Complete - RH Shop, Back Shop, B1, and B2 levelsA safety walkaround for July 2024 was completed
for the B1 and B2 levels by A. Newsome, and
for the main shop and back shop by R. Sykes.
  
  190   Thursday, October 10, 2024, 12:30 Adam NewsomeInfrastructureStandard OperationSafety Walkaround Complete - RH Shop, Back Shop, B1, and B2 levelsA safety walkaround was completed for the
RH Shop, Back Shop, B1, and B2 levels. 
The resulting spreadsheet can be
  
  193   Monday, January 06, 2025, 13:57 Adam NewsomeInfrastructureStandard OperationSafety Walkaround Complete - RH Building Shop and Back ShopA safety walkaround was completed for the
RH building shop and back shop. 
The resulting spreadsheet can be
  
  192   Friday, January 03, 2025, 10:20 Adam NewsomeInfrastructureStandard OperationSafety Walkaround Complete - RH Building B1 and B2 LevelA safety walkaround was completed for the
RH building  B1 and B2 levels.
The resulting spreadsheet can be
  
  110   Friday, February 23, 2018, 15:44 Jason KapalkaElevation JackRepairReplacement of Elevating System wiringOn January 8, 2018, while troubleshooting
the Cyclotron Elevating System during the
lid-up operation, the
  
  63   Thursday, March 19, 2015, 13:14 maicodallavalleShieldingStandard OperationRemote Handling B2 level Shielding doorThe Remote Handling B2 level Shielding
door has been closed.
  
  22   Tuesday, March 19, 2013, 19:17 Grant MinorElevation JackStandard OperationRe-indexing of all jack station "zero" yoke elevationsThe dimension between the yokes and the
Cyclotron upper structure primary beams was
set to .25" nominal at all jack stations
 Jacks_Station_6_and_4_Procedure_Jan_12_2012_122.jpg 
  99   Tuesday, March 14, 2017, 12:02 Jason KapalkaCyclotronStandard OperationRadiation surveyThe unshielded radiation survey was performed
in the Cyclotron tank by the RH group using
the service bridge, 
 Procedure_for_Cyclotron_Tank_Radiation_Survey_by_Don_Jackson_(20000106_Obsolete).doctankworkssubplot.m2017_01_30_shields_out_tank_superimposed.png2017_02_02_shields_in.png 
  138   Tuesday, February 08, 2022, 11:39 Adam NewsomeCyclotronDevelopmentRadiation Survey - sampling rate errorWhen attempting to perform the radiation
survey, the program displayed an error at
startup stating that the software was not
  
  155   Thursday, August 03, 2023, 10:43 Adam NewsomeTrolleyDevelopmentPrevious generation video trolley decommissionedThe "old" video trolley featuring
scissor mechanism and DSLR camera has officially
been decommissioned. Going forward, Video
  
  146   Thursday, October 06, 2022, 17:15 Adam NewsomeElevation JackMaintenancePreventative Maintenance: MCC-E elevating system motor contactorsUnder work permit C2022-10-04-1,
the motor contactors for jack motors 1 through
12 were replaced. The contactors showed signs
 Elevating_System_Motor_Contactors_2022-10-06.png 