  168   Friday, February 16, 2024, 11:11 Adam NewsomeTrolleyRepairLift Trolley: vertical motion failure, motor relays replacedToday (2024-02-16) when operating the lift
trolley to install shields in the cyclotron,
the vertical motion was observed to be intermittently
  
  169   Monday, February 26, 2024, 11:52 Adam NewsomeCyclotronRepairControls issue - CAMAC power supplyAn issue was encountered on 2024-02-23
when attempting to operate the lift trolley.
  
  170   Friday, April 19, 2024, 15:18 Adam NewsomeCyclotronStandard OperationLid down operation - 2024The lid down operation
took place on April 19, 2024. 
 Elevation_System_Checklist_-_2024.xlsx 
  171   Wednesday, April 24, 2024, 14:26 Adam NewsomeElevation JackStandard OperationLid up operation (second) - 2024Due to an issue with resonator latching,
there was a need to raise the cyclotron lid
a second time this shutdown.
 Elevation_System_Checklist_-_2024_-_Second_Lid_Up.pdf 
  172   Tuesday, April 30, 2024, 15:00 Adam NewsomeCyclotronStandard OperationLid down operation (second) - 2024 A second lid down
operation took place on April 30, 2024. 
 Elevation_System_Checklist_-_2024_-_Second_Lid_Down.pdf 
  173   Thursday, May 02, 2024, 12:42 Adam NewsomeElevation JackStandard OperationLid up operation (third) - 2024The cyclotron lid was raised starting ~11:45am
on 2024-05-02 and  finishing at ~12:12pm
under work permit C2024-05-02-5. 
 Elevation_System_Checklist_-_2024_-_May.pdf 
  174   Tuesday, May 07, 2024, 09:35 Adam NewsomeElevation JackStandard Operation Lid down operation (third) - 2024 A third lid down
operation took place over May 6-7, 2024.
 Motor_Contactor_6_-_2024.PNGElevation_System_Checklist_-_2024_Lid_down_-_third.pdf 
  185   Wednesday, July 17, 2024, 15:02 Adam NewsomeInfrastructureStandard OperationSafety Walkaround Complete - RH Shop, Back Shop, B1, and B2 levelsA safety walkaround for July 2024 was completed
for the B1 and B2 levels by A. Newsome, and
for the main shop and back shop by R. Sykes.
  
  187   Wednesday, July 24, 2024, 11:39 Adam NewsomeCyclotronStandard OperationInvestigation of faulty Al-ALCW signalFault 16710 was initially assigned
to Remote Handling: 
  
  190   Thursday, October 10, 2024, 12:30 Adam NewsomeInfrastructureStandard OperationSafety Walkaround Complete - RH Shop, Back Shop, B1, and B2 levelsA safety walkaround was completed for the
RH Shop, Back Shop, B1, and B2 levels. 
The resulting spreadsheet can be
  
  191   Wednesday, October 16, 2024, 11:37 Adam NewsomeService BridgeDevelopment Bridge Lift Mechanism Refurbishment (Phase 2 of 2) - Complete See previous e-log for phase 1: e-log
134
 
 6x 
  192   Friday, January 03, 2025, 10:20 Adam NewsomeInfrastructureStandard OperationSafety Walkaround Complete - RH Building B1 and B2 LevelA safety walkaround was completed for the
RH building  B1 and B2 levels.
The resulting spreadsheet can be
  
  193   Monday, January 06, 2025, 13:57 Adam NewsomeInfrastructureStandard OperationSafety Walkaround Complete - RH Building Shop and Back ShopA safety walkaround was completed for the
RH building shop and back shop. 
The resulting spreadsheet can be
  