  113   Wednesday, September 04, 2019, 15:29 Adam NewsomeTrolleyMaintenanceConnector faceplate and tubing upgradeTool Trolley: 
The connector faceplate was replaced
with a new version to allow for more space
  
  112   Tuesday, January 22, 2019, 07:18 Dan McDonaldElevation JackMaintenanceStation 11-12 jack swap and hoist plate instalPrior to commencing work on jacking stations
we installed a wall mounted come along plate
as per Jason kapalkas instructions  
  
  111   Tuesday, April 03, 2018, 11:57 Travis CaveCyclotronStandard OperationBlue Shield Door Shut. The Blue Shield Door on the B2 level
of the RH building has been closed.
  
  110   Friday, February 23, 2018, 15:44 Jason KapalkaElevation JackRepairReplacement of Elevating System wiringOn January 8, 2018, while troubleshooting
the Cyclotron Elevating System during the
lid-up operation, the
  
  109   Monday, February 19, 2018, 12:58 maicodallavalleTrolleyRepairLift Trolley RepairWe had just finished pulling out the ladders
from the cyclotron with the lift trolley.
We started to run the lift trolley into the
  
  108   Friday, February 02, 2018, 14:14 Don JacksonTrolleyRepairOvercurrent on radial drive motor 
 
  
  107   Wednesday, January 31, 2018, 11:20 Isaac EarleCyclotronStandard OperationHE1 probe reinstalled HE1 probe was reinstalled in the
cyclotron this morning as per the procedure
in Document 126165.  Hardware for the
  
  106   Thursday, January 25, 2018, 17:16 Isaac EarleCyclotronStandard OperationHE1 probe removed The HE1 probe was removed from the
cyclotron today using the procedure in Document
126165.  The reason for removal is so
  
  105   Tuesday, January 16, 2018, 13:43 Travis CaveCyclotronStandard OperationCyclotron in tank work All cyclotron in tank work has been
completed.
  
  104   Tuesday, January 09, 2018, 15:54 Jason KapalkaCyclotronStandard OperationLid-up sequence (in-tank work)2018-01-09
07:00-10:00 - Pre-job meeting, informed main
control room of operation startup, lowered
  
  103   Monday, January 08, 2018, 09:04 Maico Dalla Valle / Jason KapalkaCyclotronStandard OperationCyclotron Lid UpRemote Handing is ready for January, 8 2018
Cyclotron lid up. Elevating system service
has been completed.
 Cyclotron_Elevation_Maintenance_Rotation_Record_20180223.xlsx 
  102   Tuesday, March 14, 2017, 17:57 Jason KapalkaCyclotronStandard OperationLid raising and lowering operationsLid up (Attempt #1)

Pre-indexed 
  
  101   Tuesday, March 14, 2017, 17:28 Jason KapalkaCyclotronMaintenanceLower resonator removal simulation exerciceA simulated removal of a lower resonator from
the Cyclotron tank was attempted by the RH
group using the 
  
  100   Tuesday, March 14, 2017, 17:07 Jason KapalkaProbeMaintenanceLE probe removal simulation exerciseA simulated removal of the LE2 Probe from
the Cyclotron tank was performed by the RH
and Probes group using the 
  
  99   Tuesday, March 14, 2017, 12:02 Jason KapalkaCyclotronStandard OperationRadiation surveyThe unshielded radiation survey was performed
in the Cyclotron tank by the RH group using
the service bridge, 
 Procedure_for_Cyclotron_Tank_Radiation_Survey_by_Don_Jackson_(20000106_Obsolete).doctankworkssubplot.m2017_01_30_shields_out_tank_superimposed.png2017_02_02_shields_in.png 
  98   Tuesday, March 14, 2017, 11:23 Jason KapalkaCyclotronStandard OperationStart/end of shutdown photo and video surveyThe start of shutdown photo and video survey
was performed in the Cyclotron tank by the
RH group using the 
 Cyclotron_Video_Inspecting_Guidelines_(RevX_20170314).xlsx 
  97   Tuesday, March 07, 2017, 09:31 Jason KapalkaShieldingStandard OperationBlockers/Shields/Covers/LaddersThe seven copper blockers were removed from
the Cyclotron tank by the RH group using
the service bridge, lift 
 Checklist_for_Cyclotron_Shields_and_Blocks_and_Porthole_Covers_(Rev4_As_Run_2017).pdf 
  96   Friday, March 03, 2017, 13:30 Jason KapalkaCyclotronStandard OperationCP continuity testPerformed continuity test at Cyclotron center
post with RH and Operations group members
using the service bridge, 
  
  95   Tuesday, February 28, 2017, 15:45 Jason KapalkaCyclotronStandard Operation2C extraction probe removal and reinstallation2C extraction probe was removed from cyclotron
tank on 2017-02-07 by RH and Probes group
members with service 
  
  94   Tuesday, February 21, 2017, 13:40 Isaac EarleCyclotronStandard OperationHE2 Probe Returned to Cyclotron The HE2 probe was reinstalled in
the cyclotron this morning following the
procedure in Document #126165.  An orbital
  