ID Date Author Category Type Subject Text Attachments
  140   Wednesday, April 27, 2022, 16:05 Adam NewsomeCyclotronStandard OperationLid down operation - 2022The lid down operation
took place on Apr. 27, 2022. 
  
  139   Monday, March 21, 2022, 13:14 Adam NewsomeTrolleyRepairVideo Trolley Mk 1 - Radial Limit Switch ReplacementAn issue was observed in which radial motion
on the Video Trolley Mk 1 did not respond
to commands. After troubleshooting, it was
  
  138   Tuesday, February 08, 2022, 11:39 Adam NewsomeCyclotronDevelopmentRadiation Survey - sampling rate errorWhen attempting to perform the radiation
survey, the program displayed an error at
startup stating that the software was not
  
  137   Friday, February 04, 2022, 11:52 Adam NewsomeCyclotronStandard OperationLid up operation - 2022The lid up operation
took place on Feb. 4, 2022. 
  
  136   Wednesday, January 19, 2022, 09:50 Travis CaveShieldingStandard OperationShield door is now open The shield door is now open on the
RH B2 level.
  
  135   Tuesday, August 31, 2021, 14:28 Adam NewsomeTrolleys servicedDevelopmentUpper Resonator Trolley - Finger Cylinders ReplacedThe two support fingers on the upper resonator
trolley were bent due to excessive loading
during cylinder toggling.
 new_fingers.PNG 
  134   Wednesday, June 16, 2021, 09:59 Adam NewsomeService BridgeDevelopmentBridge Lift Mechanism Refurbishment (Phase 1 of 2) - CompleteThe following items from Phase 1 of 2 of
Bridge Lift Mechanism Refurbishment (O504)
are complete:
 PXL_20210519_210527283_-_Copy.jpgPXL_20210216_175228151_-_cylinder_air_tubing_replaced.jpgPXL_20210615_171909579.jpg 
  133   Wednesday, May 05, 2021, 12:20 Adam NewsomeInfrastructureDevelopmentCyclotron RH Control Room: Outlets InstalledThe following outlets were installed by
Electrical Services Group in order to facilitate
upgrading power supplies for Cyclotron Remote
  
  132   Tuesday, April 20, 2021, 15:02 Adam NewsomeCarrierDevelopmentEmergency Trolley Rescue Winch: Installed and TestedAn emergency trolley rescue winch (TRH1527)
was developed for the purposes of retrieving
trolleys from the cyclotron tank whose radial
 PXL_20210420_185918486.MP.jpgPXL_20210420_190619179.jpg 
  131   Thursday, April 01, 2021, 13:47 Adam NewsomeCyclotronStandard OperationVault Shield Door ClosedThe vault shield door has been closed and
seal inflated. The operation was performed
with no issue. 
  
  130   Friday, February 26, 2021, 13:00 Adam NewsomeTrolleys servicedMaintenanceLower Resonator Trolley - Radial Drive Failure IssueOn Feb. 24 while practising a training
exercise, the lower resonator trolley unexpectedly
experienced a radial drive failure. The trolley
  
  129   Friday, February 26, 2021, 08:29 Adam NewsomeTrolleys servicedMaintenanceFirst Turn Radial Flag (FTRF) Jig - Pneumatic UpgradeOld fittings and broken pneumatic tubing
on the FTRF jig have been replaced with new
push-connect fittings and polyurethane tubing.
 PXL_20210216_202019350.jpg 
  128   Wednesday, February 03, 2021, 12:37 Adam NewsomeCyclotronDevelopmentLadder Handling Tool - First In-Tank Test (SAS0824)The newly developed Ladder Handling Tool
(TRH1401), which is used to move the maintenance
ladders from the #5 resonator area closer
 Capture.PNGCapture5.PNGCapture14.PNG 
  127   Friday, January 22, 2021, 14:30 Adam NewsomeCyclotronStandard OperationLid up operation - 2021The lid
up operation took place on Jan. 22, 2021.
The
  
  126   Wednesday, January 13, 2021, 11:35 Adam NewsomeShieldingMaintenanceShadow Shields Inspection - 2021 ShutdownAll shadow shields which are remotely placed
inside the cyclotron during shutdown were
inspected by Adam Newsome and Chris Peterson
  
  125   Monday, November 09, 2020, 09:17 Adam NewsomeInfrastructureDevelopmentNew crane pendant: B2 level craneA new remote crane pendant was installed
to replace the existing  wired pendant on
the B2 level of Remote Handling building
  
  124   Thursday, November 05, 2020, 15:38 Adam NewsomeInfrastructureDevelopmentNew crane pendant: B1 level craneA new remote crane pendant was installed
to replace the existing wired pendant on
the B1 level of Remote Handling building
  
  123   Thursday, July 16, 2020, 11:57 Adam NewsomeCyclotronDevelopmentCyclotron Mockup: Orbital Position Pendant UpgradeThe pendant used for controlling the orbital
motion of the bridge mockup was upgraded.
Features of the new pendant include:
 Before.jpgAfter.jpg 
  122   Sunday, April 05, 2020, 13:24 Dan McDonaldElevation JackMaintenanceElevating system station swap 2019-2020Station 11-12 where swapped for station
13-14 during 2018-2019 shutdown. Once lock
out and motor disconnect was complete we
  
  121   Saturday, April 04, 2020, 10:03 Dan McDonaldTrolleyDevelopmentAddition of DC motor controller mountsUpper and lower resonator trolleys received
mounting plates and brackets to accommodate
DC motor controls for updated drive motors.
  