ID Date Authordown Target Material Target Oven W.O# Source Status Subject Text Attachments
  64   Wednesday, March 13, 2013, 16:08 Anders MjosEmpty38481-4HP-FEBIADDoneThermal testWednesday, March 13, 2013 
Thermocouple channels (see attached
PDF for photos)
 HP-FEBIAD-A_TC_at_fins.pdf 
  65   Thursday, March 14, 2013, 12:27 Anders MjosEmpty38481-4HP-FEBIADDoneCTL thermal test 3 (w/o CTL block)Thursday, March 12, 2013 
The CTL was removed and target heated
to 580A / 300A
 2013-03-13_-_FEBIAD-HP-A_TargetLeg_and_HeatShield_TC.pdf2013-03-13_-_FEBIAD-HP-A_TargetLeg_and_HeatShield_TC.xlsx 
  68   Friday, April 19, 2013, 15:27 Anders MjosEmpty38481-4HP-FEBIADDoneCTL testTarget installed with 4 T/C
The target assembly is ITD0300 with
the CTL Cu cooling block slightly modified.
  
  70   Tuesday, April 23, 2013, 10:11 Anders MjosEmpty38481-4HP-FEBIADDoneCTL test 

    
 2013-04-23_Evap2_ITD0300_CTL_Thermal_Test.xlsxCTL_ITD0300_Evap2.pdfDeformed_Ionizer_Tube.jpg 
  71   Tuesday, April 30, 2013, 11:20 Anders MjosEmpty38481-5HP-FEBIADDoneCTL thermal test CTL block on T/C F/T Ch 1
Supply on Ch 3
HS Return on Ch 4
 StripTool_2013-05-02.pngCTL_ITD0431_Evap2.pdf2013-04-30_Evap2_ITD0431_CTL_Thermal_Test.pdf 
  92   Tuesday, October 29, 2013, 15:50 Anders Mjos   In progressCopper bars on TGHT and TBHT Tuesday, October 29, 2013, 15:50:
Pumping down
Wednesday, October 30, 2013, 09:32:
 Current_and_Voltage.pdf 
  93   Friday, November 01, 2013, 17:20 Anders Mjos   ProblemsBacking pump needs new filterThe source of the poor vacuum in the backing
line seems to be related to a dirty filter.
We will try to find a replacement filter
  
  94   Monday, November 04, 2013, 14:02 Anders Mjos   MaintenanceBacking pump replaced 

    
  
  96   Thursday, November 07, 2013, 09:38 Anders Mjos   Problems resolvedHeat Shield cooling line twistedSee attached photo.
The Heat Shield has been taken to
the Machine Shop for repair.
 Twisted_Tube.jpgTwisted_Tube_Repaired.jpg 
  120   Friday, March 07, 2014, 10:34 Anders Mjos   Problems resolvedTGHT2 water flow signalThere was no signal going from the coils
to the PLC. After manipulating the connection
points on the coil a signal could again be
  
  161   Friday, October 03, 2014, 13:02 Anders MjosEmpty  MaintenanceBroken insulators

    

       
            
 NewInsulators.jpgBrokenInsulators.jpg 
  174   Wednesday, January 14, 2015, 13:46 Anders MjosEmpty  MaintenancePumping down for water leak test Wednesday, January 14, 2015, 13:46:
Roughing
Wednesday, January 14, 2015, 14:57:
  
  175   Thursday, January 22, 2015, 14:21 Anders MjosEmpty  Problems resolvedCG1A replaced See previous e-log entry
for details
  
  265   Tuesday, December 01, 2015, 11:35 Anders MjosEmpty41077-5LP-SISIn progressTest#2: Measuring temp with thermocouple (away from centre) & 2C-IR Data from thermocouple attached.
Raw data and Excel sheet with plot.
 2015-10-08_Small_Centre_Block.xlsx2015-10-08.4ch2015-10-06.4ch2015-10-06_Small_Centre_Block.xlsx 
  281   Monday, March 14, 2016, 13:12 Anders MjosTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

    

       
            
  
  290   Tuesday, April 19, 2016, 09:28 Anders MjosTa41790-1LP-SISDoneTa#47 LP-SIS (with new center block) conditioning

    

       
            
 2016-03-11_Evaporator_2.4ch2016-03-11_Evaporator_2.xlsx 
  315   Thursday, August 18, 2016, 10:37 Anders Mjos   MaintenanceNew cooling lines for Heat Shield Dan made a set of new cooling lines
for the Source Tray Heat Shield cooling yesterday.
No joints on the lines. Use same VCR fitting
  
  345   Monday, February 06, 2017, 11:17 Anders Mjos   Problems resolvedIOC restart after power outagae Dave Morris did a remote restart
of the IOC after the outage. Turbo pump started.
  
  352   Monday, March 13, 2017, 15:34 Anders MjosTa41790-4LP-SISDoneConditioning Ta#51Target container wrapped in 3x heat shield
foils and installed by JW
 Monday, March 13, 2017, 15:33:
  
  366   Wednesday, May 10, 2017, 21:33 Anders MjosEmpty TARGET BOATIn progressConditioning Heat Shield for IGLIS UCx#20 - test stand is down

    

       
            
  