  414   Tuesday, July 10, 2018, 16:43 John WongEmpty LP-SISDoneFor nano-SiC#1 Tuesday, July 10, 2018, 16:40
Container was flashed with TaC solution
and let dry in air. 
  
  415   Wednesday, July 25, 2018, 17:33 John WongEmpty43044-2LP-SISDoneTaC coating/sintering for UCx#24Wednesday, July 25, 2018, 17:32
Container is coated with TaC and
wrapped with 3 layers of Ta heat-shields.
  
  417   Tuesday, September 04, 2018, 17:04 John WongEmpty LP-SISProblemsTaC coating/sintering for UC target containerTuesday, September 04, 2018, 16:58
Container is coated with TaC and
wrapped with Ta heat-shield ( 3 layers)
 TGHT-Current_error.JPG 
  418   Monday, September 10, 2018, 15:09 Marla CervantesEmpty42218-3LP-IG-LISDoneTaC coating/sintering for UC target container  Monday, September 10, 2018, 15:09
Container is coated with TaC
 EVAP2-_01.JPGHeater-ramp.jpgPlot_400A-230A.jpgTempeature-at-400A.jpgTaC-coating.png 
  422   Friday, November 02, 2018, 17:36 Marla CervantesEmpty39530-1LP-FEBIADDoneGraphite insert test #1 Friday, November 02, 2018, 17:33
A new LP-FEBIAD was coated and
  
  423   Monday, November 19, 2018, 12:57 Marla CervantesEmpty43630-7 DoneTaC coating/sintering for graphite insert test Monday, November 19, 2018, 08:57
Tantalum tube was coated with
 TaC-coatingPlot.JPG 
  427   Friday, January 18, 2019, 15:11 Darwin Ortiz RosalesEmpty43044-5LP-SISDoneTaC coating/sintering (training/online use) Friday, January 18, 2019, 15:00
Container was coated with TaC and
wrapped with 3 Ta heat shields.
  
  429   Thursday, February 07, 2019, 15:20 Darwin Ortiz RosalesEmpty 43630-1 DoneTaC coating/sinteringThursday, February 07, 2019, 14:12
Tantalum tube coated with TaC and
wrapped with 3 layers of Ta heat-shielding.
  
  431   Thursday, February 21, 2019, 09:15 Darwin Ortiz RosalesEmpty42464-4HP-FEBIADDone Thursday, February 21, 2019, 09:01
Container coated with TaC and wrapped
with 2 Ta heat shields.
 190225EVAP2Trend.png190225EVAP2Trendb.png 
  432   Thursday, March 07, 2019, 09:22 Darwin Ortiz RosalesEmpty40282-4TARGET BOATDoneTransfer tube TaC coating (Legnaro)Thursday, March 07, 2019, 09:09
Transfer tube from Legnaro was coated
with TaC.
  
  441   Tuesday, April 30, 2019, 09:35 Darwin Ortiz RosalesEmpty43044-6LP-SISDoneTaC coating/sinteringTuesday, April 30, 2019, 09:33
Container was coated with TaC and
wrapped with 2 Ta heat shields.
 43044_6a.png43044_6b.png 
  476   Tuesday, March 10, 2020, 09:34 Darwin Ortiz RosalesEmpty42218-8HP-SISDoneTaC coating/sinteringMonday, March 9, 2020, 03:15
Container coated with TaC and wrapped
with 3 Ta heat shields.
 SiC#40.PNG 
  483   Sunday, May 24, 2020, 13:39 Marla CervantesEmpty44139-11LP-SISDoneTaC coating/sintering  Sunday, May 24, 2020, 06:54
Ta tube was coated with TaC
 TaC-coating-sintering.PNG 
  485   Friday, May 29, 2020, 10:26 Marla CervantesEmpty43044-8LP-SISDoneTaC coating/sintering  Friday, May 29, 2020, 08:52
Ta tube was coated with TaC
 e-log-485.PNG 
  487   Thursday, June 11, 2020, 13:01 Darwin Ortiz RosalesEmpty44139-12LP-SISDone  Thursday, June 11, 2020, 09:56
Previous day (Wednesday June 10,
2020) 
 WO#_44139-12_TaC_sintering.PNG 
  488   Monday, June 15, 2020, 14:28 Darwin Ortiz RosalesEmpty42218-7HP-SISDoneTaC coating/sintering Monday, June 15, 2020, 13:30
Container coated with TaC and
  
  493   Friday, July 31, 2020, 11:16 Ferran Boix PamiesEmpty41882-1TARGET BOATDoneThermocouple measurent of boat temperatureBoat with attached thermocouple type C
with AREMCO ceramabond glue installed in
evap2 the 30-07-2020
  
  495   Wednesday, August 05, 2020, 19:14 Ferran Boix PamiesEmpty41882-1TARGET BOATDoneParasitic target cooling test 2020-08-05 7.13pm Roughing pump on
2020-08-06 10:48am Turbo was turned
on by Marla in the morning. Vacuum IGP1 4e-6Torr.
  
  496   Tuesday, August 11, 2020, 10:17 Ferran Boix PamiesEmpty41882-1TARGET BOATIn progressContamination foils temperature testThe target was prepared and put under vacuum
on 2020-08-10
 
  
  498   Wednesday, August 12, 2020, 11:57 Marla CervantesEmpty44489-9TARGET BOATDonePristine Ta tube calibration Short oven loaded with additional
hardware are spacers into the flex-line HS.
  