371
|
Tuesday, May 16, 2017, 11:57 |
Laura Lambert | SiC | 41369-10 | HP-FEBIAD-CTL | Done | Sintering SiC#36 | Tuesday, May 16, 2017, 10:56
Target container contains 460 discs of SiC
Target packed length = 17cm.
Mass of SiC(green) = 55.5152g
Consists of 4 packs of 5 and 440 singles.
Container is wrapped with 1x heatshield around each side of cooling fins; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.
Sintering temp = 1800C
Chamber is currently being pumped down.
Tuesday, May 16, 2017, 15:27
HS water valves turned on, no leaks detected.
Tapped up manually to 30A
Waited ~30min , vacuum stable.
IGP1 = 8.25e-6 Torr
Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
TGHT max = 400A. TBHT max at 230A.
Slope on OMEGA = 1.09 [see elog i.d. # 370 for reasoning behind OMEGA slope choice]
Friday, May 19, 2017, 10:13
TGHT = 250A, 3.11V DR = 248A, 3.3V
TBHT = 137A, 1.68V DR = 140A, 1.73V
OMEGA = 1100C
IGP1= 6.9e-6 Torr DR = 1e-5mbar
IGP2 = 5.9e-6 Torr DR = 6.45e-6 Torr
Vacuum stable.
Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.
Friday, May 19, 2017, 10:33
Change in plan and switching ramping rate to 0.5A/min and 0.2A/min for the TBHT and TGHT respectively.
Friday, May 19, 2017, 14:49
TGHT = 400A, 5.46
TBHT = 200A, 2.66
IGP1 = 2.7e-5 Torr
IGP2 = 2.2e-5 Torr
OMEGA = 1200C
Increasing max setpoint for TGHT to 550A
Decreasing ramping rate to 0.2A/min and 0.1A/min for over the weekend.
Tuesday, May 23, 2017, 09:23
TGHT = 550A, 8.37
TBHT = 230A, 3.14
IGP1 = 1.6e-7 Torr
IGP2 = 1.6e-7 Torr
OMEGA = 1570C
Increasing max setpoint for TGHT to 600A at rate to 0.5A/min
Tuesday, May 23, 2017, 11:45
TGHT = 600A, 9.36
IGP1 = 3.5e-7 Torr
IGP2 = 3.8e-7 Torr
OMEGA = 1675C
Increasing max setpoint for TGHT to 625A at rate to 0.5A/min
Tuesday, May 23, 2017, 13:03
TGHT = 625A, 9.80V
IGP1 = 5.2e-7 Torr
IGP2 = 5.7e-7 Torr
OMEGA = 1715C
OMEGA no longer valid around 640A as temperature drops instantly after tapping up.
Could be due to target movement at high temperature.
No obvious window coating.
Tapped up manually to 660A, 10.49V.
Will remain at max setpoint overnight.
Wednesday, May 24, 2017, 11:13
TGHT = 660A, 10.74V
TGHT power supply = 662A, 11.00V
TBHT = 230A, 3.16V
TBHT power supply = 232A, 3.25V
IGP1 = 4.2e-7 Torr
IGP1 direct readout = 5.9e-7 mbar
IGP2 = 4.6e-8 Torr
IGP2 direct readout = 5e-7 Torr
Evap2 reached max setpoint yesterday afternoon.
Window has thiny coating - see attached photo.
OMEGA = 1800
MIKRON = ~1800
Initiating auto cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Wednesday, May 24, 2017, 11:36
Change of plan.
TGHT = 620A, TBHT = 210A
Ramping back-up to max setpoints and will remain at those points until vacuum starts to decrease more.
Friday, May 26, 2017, 15:24
IGP1 = 2.1e-7 Torr
IGP2 = 2.2e-7 Torr
TGHT = 660A, 10.72V
TBHT = 230A, 3.21V
All windows coated.
Remained at max setpoints for ~3.5days.
Conditioning process complete.
Initiating auto-cool at 2A/min and 1A/min for the TGHT and TBHT respectively.
Tuesday, May 30, 2017, 14:41
Target vented in air and removed from evap2
Looks good!
Endcaps inserted and expanded.
See photos attached.
|
Attachment 1: window_at_max_setpoint_after_1_day.jpg
|
|
Attachment 2: 20170530_094047_Richtone(HDR).jpg
|
|
Attachment 3: 20170530_094118_Richtone(HDR).jpg
|
|
Attachment 4: 20170530_094137_Richtone(HDR).jpg
|
|
410
|
Wednesday, May 23, 2018, 15:21 |
Laura Lambert | Empty | | HP-FEBIAD-CTL | Done | Sintering TaC coating container for UCx#23 | Wednesday, May 16, 2018, 09:56
Container coated with TaC using 'flushing technique' and let dry over weekend.
Cleaned ionizer tube with acetone, no coating inside ionizer tube.
Wrapped with 3 x Ta heat shields, not incl center block
OMEGA slope = 0.98
*NOTE: realized after pumping down, filament on IGP2 is burnt out and needs replacing, will order a new one and use IGP1 for this process
Thursday, May 17, 2018, 13:15
HS water valves remained open since the last time evap2 was used, no leak check done.
Tapped up manually to 50A.
Waited ~1hr
Vacuum stable.
IGP1 = 1e-6 Torr
Initiating auto ramp for TGHT @ 0.2A/min to a max setpoint of 350A
Initiating auto ramp for TBHT @ 0.1A/min to a max setpoint of 230A
Once max setpoints achieved, will tap up manually to final desired temperature of 1900C
Friday, May 18, 2018, 13:00
Tapped up manually.
TGHT = 495A, 8.84V
TBHT = 230A, 3.26V
MIKRON = 2000C
Filament = 1910C
OMEGA = 1910C
Will remain at max setpoints over weekend.
Tuesday, May 22, 2018, 10:04
Remained at max setpoints over long wknd.
TGHT = 495A, 8.85V
TBHT = 230A, 3.26V
IGP1 = 2.47e-7 Torr
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Wednesday, May 23, 2018, 10:08
Vented in air this morning.
Container looks good!
Transferred into glove box.
|
37
|
Sunday, July 22, 2012, 20:51 |
John Wong | NiO | 38481-7 | HP-FEBIAD | Done | Sintering NiO#1 | Sunday, July 22, 2012, 20:30
The NiO target materials were loaded into the container today.
Total discs = 500, (10 discs/pack)
length (after loaded) = 9.0cm
Target container is wrapped with Ta-heat shields, and will be removed after the sintering process.
One regular end cap is inserted (with Ni-foil inserted as a divider). The caps, however, are very loose (tried 2 caps and still loose). Hopefully the thermo diffusion bonding will seal the cap...
The other end is inserted with a D-cap for out-gassing proposes, and will be replaced with the regular end-cap after the process.
(see attachment#1)
Sunday, July 22, 2012, 20:48
The camber has been pumped down and currently IG1=1.3e-6 Torr.
The HS cooling water was turned on and no leaks were detected.
TGHT and TBHT were stepped up to 50A.
Auto-ramping is initiated at 0.2A/min for TGHT max = 250A, TBHT max = 230A.
Thursday, July 26, 2012, 23:31
TGHT and TBHT have reached to 250A (local @ 242A/2.88V) and 230A, respectively, and have stayed for ~4hrs (see attachment#2)
Currently, IGP1 = 4.9e-7 Torr, IGP2 = 3.5e-7 Torr, CG1B = 13mTorr.
Initiating auto-cool down at 2A/min.
Monday, July 30, 2012, 15:11
The chamber was vented and the target was removed.
There was significant condensation oily fluid coated Cu-heatshield lid and around the ionizer opening.
Overall, the target looks very good. The NiO target material was nicely sintered. No shrinkage or loose particles were observed (see attachment #3).
The endcap, however, was not properly fitted and it just fell off, (see attachment #4).
Both ends of the target are currently opened; the expension tool for the endcap is in order and hopefully this will solve the problem.
The target is being stored in the fumehood
|
Attachment 1: NiO#1_sinteringevap2.png
|
|
Attachment 2: NIO#1_TGHT_TBHT_250_220.png
|
|
Attachment 3: Sintered_NiO.GIF
|
|
Attachment 4: Endcap.GIF
|
|
43
|
Tuesday, August 14, 2012, 15:57 |
John Wong | SiC | 38295-8 | HP-FEBIAD | Done | Testing endcaps inserted /w the new expansion tool | Tuesday, August 14, 2012, 15:44
This SiC target was prepared in May 2011 with the Evaporator#1. The target will not used for online.
Two endcaps were inserted with the new expansion tool. The target will be heated up to the normal operating condition (TGHT =580A, TBHT = 230A).
The chamber is currently being pumped down.
Tuesday, August 14, 2012, 16:21
Earlier, the Cu-heat shield was removed from the evaporator to replace the insulators, so all the seals were placed with new ones. However,
there seems to be some leaks after the HS cooling water is turned on. (see attachment#1).
The TP off, and the chamber is vented for investigation.
Tuesday, August 14, 2012, 17:25
All the 3 seals for the Cu-heat shield were replaced. The chamber has been pumped down and the HS water valve is open. No leaks are detected.
Tuesday, August 14, 2012, 17:29
Initiated auto-ramping at 2A/min for both TGHT and TBHT.
Parameter constraints: good vac @ 2.0e-5 Torr, bad vac @ 3.0e-5 Torr.
Currently, IG1 @ 6.5e-6 Torr.
Wednesday, August 15, 2012, 09:52
TGHT and TBHT have reached to 520A and 230A, respectively, and have stayed at the currents for about 10 hours. (see attachment #2)
IG is currently at 7.7e-7 Torr.
Initiating auto-cool down at 2A/min.
Thursday, August 16, 2012, 11:23
Chamber is vented.
|
Attachment 1: vacuum_leaks.PNG
|
|
Attachment 2: TGHT_TBHT.png
|
|
60
|
Wednesday, March 06, 2013, 10:41 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test | Wednesday, March 06, 2013
The Cool Transfer Line (CTL) test target is installed for thermal tests. Drawing number is ITD0431 REV A.
Thermocouple channels are as follows:
T1: Cu block on CTL
T2: Heat Shield above CTL
T3: Heat Shield cooling water Supply
T4: Heat Shield cooling water Return
Cooling water is in Evap2 supplied to the cooling line that goes directly to the area on the Heat Shield above the CTL.
Test results attached.
|
Attachment 1: CTL_1st_Assebmly_Thermal_Test_Evap2.pdf
|
|
Attachment 2: 2013-03-08_Evap2_First_Thermal_Test.pdf
|
|
61
|
Wednesday, March 06, 2013, 17:53 |
John Wong | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test |
Anders Mjos wrote: |
Wednesday, March 06, 2013
The Cool Transfer Line (CTL) test target is installed for thermal tests. Drawing number is ITD0431 REV A.
Thermocouple channels are as follows:
T1: Cu block on CTL
T2: Heat Shield above CTL
T3: Heat Shield cooling water Supply
T4: Heat Shield cooling water Return
Cooling water is in Evap2 supplied to the cooling line that goes directly to the area on the Heat Shield above the CTL.
|
Wednesday, March 06, 2013, 17:23
The target has been pumping down to 5.3 e-7 Torr. On the RGA mass scan, mainly H2O (mass 18 + constituents) was detected at ~2.7pA (see attachment #1).
The target will be heated up: TGHT = 850A (rate @ 1A/min); TBHT = 300A (rate @ 1A/min).
Thursday, March 07, 2013, 11:51
TGHT and TBHT reached to 850A (local, 845A\13.80V) and 300A, respectively. The out gassing of CO (mass 28) reached to ~5pA at the max currents. (see attachment #2)
TBHT will be ramped down to 0A to compare the temperatures.
Thursday, March 07, 2013, 15:55
TBHT at 0A. See attachment#3 for the temperatures and RGA data before further ramping down the TGHT.
|
Attachment 1: rampingup_1.PNG
|
|
Attachment 2: rampingup_2.PNG
|
|
Attachment 3: autorampingdown_23.PNG
|
|
62
|
Monday, March 11, 2013, 12:23 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test 2 |
Anders Mjos wrote: |
Wednesday, March 06, 2013
The Cool Transfer Line (CTL) test target is installed for thermal tests. Drawing number is ITD0431 REV A.
Thermocouple channels are as follows:
T1: Cu block on CTL
T2: Heat Shield above CTL
T3: Heat Shield cooling water Supply
T4: Heat Shield cooling water Return
Cooling water is in Evap2 supplied to the cooling line that goes directly to the area on the Heat Shield above the CTL.
|
Monday, March 11, 2013
The CTL test target was installed again for a second thermal test. CTL block fastened to HS with 1 in lbs. A small piece of Ta-foil of 0.001" thickness was used between the CTL Cu-block and the Ta transfer line to reduce the heat transfer..
Thermocouples were re-attached to CTL and Heat Shield (see above for channels #s).
See attached graph (PDF) for details. |
Attachment 1: 2013-03-11_Evap2_Second_Thermal_Test.pdf
|
|
63
|
Monday, March 11, 2013, 15:59 |
John Wong | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test 2 |
Anders Mjos wrote: |
Anders Mjos wrote: |
Wednesday, March 06, 2013
The Cool Transfer Line (CTL) test target is installed for thermal tests. Drawing number is ITD0431 REV A.
Thermocouple channels are as follows:
T1: Cu block on CTL
T2: Heat Shield above CTL
T3: Heat Shield cooling water Supply
T4: Heat Shield cooling water Return
Cooling water is in Evap2 supplied to the cooling line that goes directly to the area on the Heat Shield above the CTL.
|
Monday, March 11, 2013
The CTL test target was installed again for a second thermal test. CTL block fastened to HS with 1 in lbs. A small piece of Ta-foil of 0.001" thickness was used between the CTL Cu-block and the Ta transfer line to reduce the heat transfer..
Thermocouples were re-attached to CTL and Heat Shield (see above for channels #s).
|
Monday, March 11, 2013, 15:55
Chamber was pumped down to 2 e-7 Torr. HS water valve opened and no leaks were detected.
TGHT and TBHT are ramping up to 850A and 300A at 2A/min, respectively.
RGA is running...
Tuesday, March 12, 2013, 10:44
TGHT/TBHT reached to max currents.
See attachment #1 for temperature and RGA measurements.
Cooling down in process... 5A/min.
|
Attachment 1: autorampingup_110.PNG
|
|
64
|
Wednesday, March 13, 2013, 16:08 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | Thermal test | Wednesday, March 13, 2013
Thermocouple channels (see attached PDF for photos)
T1 - Left target leg at tube
T2 - Between cooling fins close to tube, left side
T3 - Supply water HS
T4 - Return water HS
Friday, March 22, 2013
Test not conducted. Target removed. |
Attachment 1: HP-FEBIAD-A_TC_at_fins.pdf
|
|
65
|
Thursday, March 14, 2013, 12:27 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test 3 (w/o CTL block) | Thursday, March 12, 2013
The CTL was removed and target heated to 580A / 300A
T1: Left target leg close to tube
T2: Heat Shield above CTL
T3: Heat Shield cooling water Supply
T4: Heat Shield cooling water Return
Thursday, March 13, 2013
The target was cooled down
Results attached as PDF and Excel |
Attachment 1: 2013-03-13_-_FEBIAD-HP-A_TargetLeg_and_HeatShield_TC.pdf
|
|
Attachment 2: 2013-03-13_-_FEBIAD-HP-A_TargetLeg_and_HeatShield_TC.xlsx
|
68
|
Friday, April 19, 2013, 15:27 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL test | Target installed with 4 T/C
The target assembly is ITD0300 with the CTL Cu cooling block slightly modified.
Ch1 - CTL cooling block T/C feedtrough
Ch2 - Heat shield below left gripper arm - T/C feedthrough
Ch3 - Heat shield below left gripper arm - 9 pin connector
Ch4 - Target left side leg on tube - 9 pin connector
Friday, April 19, 2013, 15:23: Roughing
Friday, April 19, 2013, 15:41: Started turbo
Monday, April 22, 2013, 09:43: Opened water supply. Vacuum stable at 2.8E-7 T (IGP1) |
69
|
Monday, April 22, 2013, 18:49 |
John Wong | Empty | 38481-4 | HP-FEBIAD | Done | CTL test |
Anders Mjos wrote: |
Target installed with 4 T/C
The target assembly is ITD0300 with the CTL Cu cooling block slightly modified.
Ch1 - CTL cooling block T/C feedtrough
Ch2 - Heat shield below left gripper arm - T/C feedthrough
Ch3 - Heat shield below left gripper arm - 9 pin connector
Ch4 - Target left side leg on tube - 9 pin connector
Friday, April 19, 2013, 15:23: Roughing
Friday, April 19, 2013, 15:41: Started turbo
Monday, April 22, 2013, 09:43: Opened water supply. Vacuum stable at 2.8E-7 T (IGP1)
|
Monday, April 22, 2013, 18:48
Ramping TGHT/TBHT to 850A/300A at 1A/min.
|
70
|
Tuesday, April 23, 2013, 10:11 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL test |
John Wong wrote: |
Anders Mjos wrote: |
Target installed with 4 T/C
The target assembly is ITD0300 with the CTL Cu cooling block slightly modified.
Ch1 - CTL cooling block T/C feedtrough
Ch2 - Heat shield below left gripper arm - T/C feedthrough
Ch3 - Heat shield below left gripper arm - 9 pin connector
Ch4 - Target left side leg on tube - 9 pin connector
Friday, April 19, 2013, 15:23: Roughing
Friday, April 19, 2013, 15:41: Started turbo
Monday, April 22, 2013, 09:43: Opened water supply. Vacuum stable at 2.8E-7 T (IGP1)
|
Monday, April 22, 2013, 18:48
Ramping TGHT/TBHT to 850A/300A at 1A/min.
|
Tuesd ay, April 23, 2013, 10:07
TBHT / TGHT: 820A / 300A
TGHT:RDCUR: 816.6A
TBHT:RDCRU: 303.5A
Local P/S displays
TGHT: 821A / 11.05V
TBHT: 307A / 4.37V
Tuesday, April 23, 2013, 10:45: Ramping down TBHT to 0A @ 5A/min
Tuesday, April 23, 2013, 12:49: Ramping down TGHT to 0A @ 5A/min
Tuesday, April 23, 2013, 15:52: Swithced off TGHT and TBHT P/S. TGHT P/S showed 30A read back value, while local value was 0A
Wednesday, April 24, 2013, 09:53: Turbo stopped
Wednesday, April 24, 2013, 12:00: Target removed
The ionizer tube was found to have deformed as seen in the attached photo. |
Attachment 1: 2013-04-23_Evap2_ITD0300_CTL_Thermal_Test.xlsx
|
Attachment 2: CTL_ITD0300_Evap2.pdf
|
|
Attachment 3: Deformed_Ionizer_Tube.jpg
|
|
71
|
Tuesday, April 30, 2013, 11:20 |
Anders Mjos | Empty | 38481-5 | HP-FEBIAD | Done | CTL thermal test | CTL block on T/C F/T Ch 1
Supply on Ch 3
HS Return on Ch 4
Tuesday, April 30, 2013, 11:20: Roughing
Tuesday, April 30, 2013, 11:45: Turbo started
Wednesday, May 01, 2013, 08:43: Cooling water opened. Vacuum stable at 5.1E-7 T (IGP1)
Wednesday, May 01, 2013, 08:48: Ramping TGHT and TBHT to 850A and 300A at 1A/60s
Thursday, May 02, 2013, 09:10: TGHT reached voltage limit (12V) at ~780A yesterday at ~10pm. Increased limit to 12.5V and continued auto ramping. CTL block temp ~80C
Thursday, May 02, 2013, 10:08: TGHT voltage limit changed to 13V. TGHT:RDCUR goes to ~810A with TGHT:RDVOL at 12.5V. CTL block temp ~80C
Thursday, May 02, 2013, 11:33: TGHT manually stepped to 850A RDCUR at 846A, RDVOL at 13.1V. CTL block temp ~84C
Thursday, May 02, 2013, 15:13: Ramping down TGHT and TBHT to 580A and 280A at 2A/min and 1A/min
Friday, May 03, 2013, 08:30: TGHT and TBHT at 580A and 280A. CTL block temp ~60C
Friday, May 03, 2013, 08:37: Ramping down TGHT and TBHT to 0 at 2/min and 1A/min
Friday, May 03, 2013, 11:04: T/C logger removed
Monday, May 06, 2013, 09:37: Turbo stopped.
Monday, May 06, 2013, 10:26: Venting |
Attachment 1: StripTool_2013-05-02.png
|
|
Attachment 2: CTL_ITD0431_Evap2.pdf
|
|
Attachment 3: 2013-04-30_Evap2_ITD0431_CTL_Thermal_Test.pdf
|
|
75
|
Tuesday, May 14, 2013, 17:15 |
John Wong | Empty | 38481-6 | HP-FEBIAD | Done | SinteringTaC coating | Tuesday, May 14, 2013, 17:04
Target oven is coated with TaC, and wrapped with 3-Ta heat shields.
TGHT and TBHT will be ramped up to 820A and 300A, respectively.
Ramping rate set to 1A/min.
Good Vac at 3.e-5 Torr, Bad Vac @ 4.0e-5 Torr.
Chamber is currently being pumped...
Wednesday, May 15, 2013, 10:56
Chamber has pumped down to 4.5e-7 Torr.
HS cooling water valves opened; no leaks were detected.
Stepping up TGHT/TBHT to 80A; monitoring vacuum.
Wednesday, May 15, 2013, 11:26
Pressure is increasing. TGHT setpoint @ 80A, readback @ 88.6A/0.603V, local @ 83A/0.80V.
Wednesday, May 15, 2013, 12:08
TGHT/TBHT stepped up to 140A and tripped off at high limit vacuum.
Restarted p/s and set TBHT/TGHT at 100A
Initiated auto ramping...
Friday, May 17, 2013, 11:39
TGHT and TBHT reached to 820A and 300A, respectively. Target has been heating at the max currents for ~12hrs.
Vacuum is coming down to 4.3e-7 Torr.
The TaC coating sintering is completed.
Autocooling is initiated. TGHT ramping rate @ 2A/min, and 1A/min for TBHT.
Wednesday, May 22, 2013, 10:43
Sintering complete.
Chamber will be vented
|
77
|
Monday, June 17, 2013, 16:59 |
Laura Lambert | SiC | 38481-6 | HP-FEBIAD | Done | Sintering of SiC #29 | Monday, June 17, 2013, 16:57
Target is loaded with 510 SiC discs
Container was previously coated with TaC and sintered
SiC is wrapped with tantalum heat shield
Chamber is currently being pumped down

|
78
|
Tuesday, June 18, 2013, 16:40 |
John Wong | SiC | 38481-6 | HP-FEBIAD | Done | Sintering of SiC #29 |
Laura Lambert wrote: |
Monday, June 17, 2013, 16:57
Target is loaded with 510 SiC discs
Container was previously coated with TaC and sintered
SiC is wrapped with tantalum heat shield
Chamber is currently being pumped down

|
Tuesday, June 18, 2013, 16:16
HS water valves opened; no leaks were detected.
IG @ 8.9e-7 Torr.
Note: This target has a regular end cap inserted on one end, and the other with a D-cap.
TGHT will be heated up to 820A and TBHT to 300A; ramping rate at 1A/min.
Stepped up TGHT/TBHT to 60A. Vacuum slowly increasing...
Tuesday, June 18, 2013, 17:55
Stepped up TGHT/TBTH to 80A. 10 mins later, pressure went beyond the limit and tripped of the p/s. F! 
Allowed vacuum to come down below 8e-5 Torr. Stepped down TGHT/TBHT to 50A.
Currently IG @ 4.8-5 Torr.
Initiated auto-ramping: setting: Good Vac = 3e-5 Torr, Bad Vac = 4.0e-5 Torr.
Thursday, June 20, 2013, 06:21
About 10 min ago, Evap tripped off due to high vacuum.
Vacuum came back down below the trip limit and both TGHT/TBHT p/s were stepped down to 40A and turned back on.
Changed auto ramping rate to 05A/120min.
The process continues... (And I'm going back to sleep!)
Friday, June 21, 2013, 15:19
Vacuum is close to the trip limit.
Change the ramping rate to 0.2A/120min.
Monday, June 24, 2013, 17:04
Organic burnt out is complete and vacuum has come down to ~9.0e-6 Torr.
Increase ramping rate to 0.2A/60min - The sintering process should take about another 2 days if everything goes smoothly.
Wednesday, June 26, 2013, 17:29
TGHT & TBHT have reached to 820A and 300A, respectively, for 4 hours.
Vacuum is at 9e-7 Torr.
Cooling down is in progress, at a rate of 1.0A/min for TGHT and 0.5A/min for TBHT.
The target will be ready to come out by tomorrow.
Thursday, June 27, 2013, 11:02
TGHT/TBHT reached to 0A. Vacuum is leveled at 1.2e-7 Torr.
Chamber will be vented in air soon.
|
80
|
Thursday, August 08, 2013, 15:41 |
Laura Lambert | NiO | 39530-6 | HP-FEBIAD | In progress | Sintering NiO # 2 | Thursday, August 08, 2013, 15:19
NiO target materials loaded into the container yesterday.
Total discs = 530, (5 discs/pack)
length [after loaded] = 9.0cm
Target container is wrapped with Ta-heat shields, and will be removed after sintering process.
No end caps were inserted.
The chamber has been pumped down and currently IG1 = 3.8x10-06 Torr.
The HS cooling water was turned on and no leaks were detected.
TGHT and TBHT have been stepped up to 50A.
Auto-ramping setting:
0.2A/min for TGHT max = 250A, TBHT max = 230A.
Good vacuum = 3.00e-05 Torr 
Bad vacuum = 4.00e-05 Torr 
**See attachment #1 for pictures of target pre-sintering
|
Attachment 1: NiO#2.PNG
|
|
81
|
Thursday, August 08, 2013, 17:28 |
John Wong | NiO | 39530-6 | HP-FEBIAD | Done | Sintering NiO # 2 |
Laura Lambert wrote: |
Thursday, August 08, 2013, 15:19
NiO target materials loaded into the container yesterday.
Total discs = 530, (5 discs/pack)
length [after loaded] = 9.0cm
Target container is wrapped with Ta-heat shields, and will be removed after sintering process.
No end caps were inserted.
The chamber has been pumped down and currently IG1 = 3.8x10-06 Torr.
The HS cooling water was turned on and no leaks were detected.
TGHT and TBHT have been stepped up to 50A.
Auto-ramping setting:
0.2A/min for TGHT max = 250A, TBHT max = 230A.
Good vacuum = 3.00e-05 Torr 
Bad vacuum = 4.00e-05 Torr 
**See attachment #1 for pictures of target pre-sintering
|
Thursday, August 08, 2013, 17:26
Pressure is stabilizing at ~2.2e-5 Torr. TGHT/TBHT at 50A.
Initiated auto-ramping...
Sunday, August 11, 2013, 21:30
TGHT/TBHT have reached to 250A/230A. Target have been heated over the weekend.
Cooling down initiated; 2A/min.
The chamber wil be vented in air tomorrow.
Monday, August 12, 2013, 18:01
The sinterring process is complete.
The target is ready to be removed from the evaporator, and the endcaps will be inserted.
|
138
|
Tuesday, June 17, 2014, 13:20 |
Laura Lambert | Empty | 39530-8 | HP-FEBIAD | Done | Sintering TaC coating container for SiC#30 part 2 | Tuesday, June 17, 2014, 13:11
Target container is coated with TaC.
Container is wrapped with 3x Ta-heat shields.
Currently being pumped down.
For sintering process:
TGHT and TBHT will be ramped up to 820A and 300A respectively at 0.1A/min
Tuesday, June 17, 2014, 14:22
HS water cooling valves opened, no leaks detected.
IGP1 @1.8e-6 Torr
TGHT max = 820A/ 17V
TBHT max = 300A/ 5V
Stepped up manually to 40A, waited ~20min, vacuum stable.
Initiating auto-ramp @ 1.0A/min
Wednesday, June 18, 2014, 11:24
TGHT and TBHT reached their respective 820A and 300A last night.
Internal temp measured from side of EVAP2 with mikron = 1830C
IGP1 = 7.6e-7 Torr
Initiating auto-cool down process at 2.0A/min and 1.0A/min for TGHT and TBHT respectively
vented and opened this morning.
smooth run 
|
|