Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 22 of 35  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Source Status Subject Text Attachments
  269   Friday, January 08, 2016, 11:15 Laura LambertTa41369-5HP-SISDoneTemperature measurements

    

       
            
  
  268   Thursday, January 07, 2016, 09:19 Aurelia LaxdalTa41369-5HP-SISIn progressTemperature measurementsTemperature measurements in progress this
week for Ta HP-SIS.
See attachment for the current settings
 Jan_9_and_10_2016_measurements.docx 
  267   Wednesday, December 16, 2015, 10:22 Laura LambertTa41369-5HP-SISDoneConditioning back-up Ta Target & emissivity measurements Wednesday, December 16, 2015, 10:09
Target consists of 505 discs.
  
  266   Monday, December 07, 2015, 09:06 Laura LambertEmpty39530-9HP-FEBIADDoneemissivity measurements with no h.s on HP-FEBIAD container - round2 Monday, December 07, 2015, 09:04
No heat shields.
  
  265   Tuesday, December 01, 2015, 11:35 Anders MjosEmpty41077-5LP-SISIn progressTest#2: Measuring temp with thermocouple (away from centre) & 2C-IR Data from thermocouple attached.
Raw data and Excel sheet with plot.
 2015-10-08_Small_Centre_Block.xlsx2015-10-08.4ch2015-10-06.4ch2015-10-06_Small_Centre_Block.xlsx 
  264   Monday, November 30, 2015, 15:38 Laura LambertEmpty39530-9HP-FEBIADDoneemissivity measurements with no h.s on HP-FEBIAD container Monday, November 30, 2015, 15:37
No heat shields.
 emissivity_measurements.xlsx 
  263   Monday, November 23, 2015, 14:36 Laura LambertEmpty39530-9HP-FEBIADDonetemp measurements with no h.s on HP-FEBIAD containerMonday, November 23, 2015, 14:29
No heat shields.
 temp_measurements.xlsx 
  262   Tuesday, November 10, 2015, 14:34 Laura LambertSiC41077-3LP-SISDonetemp measurements with 3xTa h.s on LPSIS (small block) container with SiC Tuesday, November 10, 2015, 14:20
Container previously sintered
 Evernote_Camera_Roll_20151110_110128.jpgEvernote_Camera_Roll_20151110_110129.jpgstriptool_screenshot_above_1700C.JPGtemp_measurements_on_LPSIS_(small_block)_container.xlsx 
  261   Monday, November 09, 2015, 14:22 Laura Lambert 41077-3LP-SISDoneSintering TaC coating on 'temporary endcaps' springs (Slope changed to 1.04)

    

       
            
 Evernote_Camera_Roll_20151110_113123.jpg 
  260   Monday, November 09, 2015, 12:56 John Wong 41077-3LP-SISIn progressSintering TaC coating on 'temporary endcaps' springs (Slope changed to 1.04)

    

       
            
  
  259   Thursday, November 05, 2015, 16:20 Laura Lambert 41077-3LP-SISIn progressSintering TaC coating on 'temporary endcaps' springs Thursday, November 05, 2015, 16:19
Springs coated with TaC and loaded
into container for sintering.
 2015-11-02_16.03.10.jpg'temporary_endcap'_springs_nov.3_2015.jpgIMG_20151105_141239627_HDR.jpgIMG_20151105_141248901_HDR.jpg 
  258   Monday, November 02, 2015, 16:29 Laura LambertEmpty41077-3LP-SISDonetemp measurements with 3xTa h.s on LPSIS (small block) container Monday, November 02, 2015, 16:28
Container previously sintered
 temp_measurements_on_LPSIS_(small_block)_container.xlsx3xTa_h.s_-_striptool_voltage.JPG 
  257   Monday, October 26, 2015, 16:17 Laura LambertEmpty41077-3LP-SISDonetemp measurements with 2xTa h.s on LPSIS (small block) container Monday, October 26, 2015, 16:16
Container previously sintered with
TaC coating and temperature measurements
 6x 
  256   Monday, October 26, 2015, 16:14 Laura LambertEmpty41077-3LP-SISDoneSintering TaC on LPSIS (small block) container & temp measurements with 1xTa h.s

    

       
            
 temp_measurements_on_sintering_TaC_on_LPSIS_(small_block)_container.xlsx 
  255   Thursday, October 22, 2015, 17:10 John WongEmpty41077-3LP-SISIn progressSintering TaC on LPSIS (small block) container

    

       
            
  
  254   Thursday, October 22, 2015, 11:41 Laura LambertEmpty41077-3LP-SISIn progressSintering TaC on LPSIS (small block) container

    

       
            
  
  253   Wednesday, October 21, 2015, 17:39 John WongEmpty41077-3LP-SISIn progressSintering TaC on LPSIS (small block) container Wednesday, October 21, 2015, 17:35
This container is prepared for a
backup UCx target (otherwise it will be used
  
  252   Thursday, October 08, 2015, 12:26 John WongEmpty41077-5LP-SISIn progressTest#2: Measuring temp with thermocouple (away from centre) & 2C-IR

    

       
            
 Test_2_tempcurves.PNGTest1&2_IV_temp_.png 
  251   Tuesday, October 06, 2015, 15:18 John WongEmpty41077-5LP-SISIn progressTest#1: Measuring temp with thermocouple (centre) & 2C-IR

    

       
            
 Temp_LPSIS_IR2C_vs_typeC.PNGTemp_LPSIS_IR2C_vs_typeC_heating_cooling.PNG 
  250   Thursday, September 24, 2015, 12:18 John WongEmpty41077-5LP-SISDoneSintering TaC coating container for UCx Target

    

       
            
 Screen_Shot_2015-09-24_at_11.51.11_AM.png420A_1900.pngTaC_coat_sintered.png 
ELOG V2.9.2-2455