ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
 |
249
|
Thursday, September 24, 2015, 09:48 |
Laura Lambert | Empty | 41077-5 | | In progress | Sintering TaC coating container for UCx Target | Thursday, September 24, 2015, 08:39
IGP1 = 6.5e-7Torr
HS water valves opened, no leaks |
|
248
|
Thursday, September 10, 2015, 12:05 |
John Wong | SiC | 39530-5 | HP-FEBIAD | Done | Re-conditioning SiC#32 |
|
  |
247
|
Thursday, September 10, 2015, 09:58 |
Laura Lambert | SiC | 39530-5 | HP-FEBIAD | In progress | Re-conditioning SiC#32 |
|
|
246
|
Wednesday, September 09, 2015, 18:24 |
John Wong | SiC | 39530-5 | HP-FEBIAD | In progress | Re-conditioning SiC#32 |
|
|
245
|
Tuesday, September 08, 2015, 15:56 |
John Wong | SiC | 39530-5 | HP-FEBIAD | In progress | Sintering SiC#32 |
|
   |
244
|
Wednesday, September 02, 2015, 11:28 |
Laura Lambert | SiC | 39530-5 | HP-FEBIAD | In progress | Sintering SiC#32 |
|
|
243
|
Tuesday, September 01, 2015, 17:20 |
John Wong | SiC | 39530-5 | HP-FEBIAD | In progress | Sintering SiC#32 | Tuesday, September 01, 2015, 17:16
Target container contains 533 discs
of SiC with packed length of 17cm. |
|
242
|
Thursday, August 27, 2015, 16:37 |
John Wong | Empty | | HP-FEBIAD | Done | Sintering TaC coating container for SiC Target |
|
|
241
|
Tuesday, August 25, 2015, 11:54 |
Laura Lambert | Empty | | HP-FEBIAD | In progress | Sintering TaC coating container for SiC Target | Tuesday, August 25, 2015, 11:50
Container coated with TaC using new
method: Ends tapped off, with liquid |
|
240
|
Monday, August 24, 2015, 12:58 |
John Wong | | | | Maintenance | Replacing turbo pump, IEVAP2TP1 | Monday, August 24, 2015, 12:54
The turbo pump was found to be faulty.
The pump couldn't get on full speed |
|
239
|
Thursday, August 20, 2015, 17:15 |
John Wong | Ta | | HP-SIS | Done | Conditioning Ta#46 Target |
|
|
238
|
Thursday, August 20, 2015, 10:07 |
Laura Lambert | Ta | | HP-SIS | In progress | Conditioning Ta#46 Target |
|
|
237
|
Wednesday, August 19, 2015, 17:26 |
John Wong | Ta | | HP-SIS | In progress | Conditioning Ta#46 Target |
|
|
236
|
Tuesday, August 18, 2015, 16:02 |
Laura Lambert | Ta | | HP-SIS | In progress | Conditioning Ta#46 Target | Tuesday, August 18, 2015, 15:53
Target consists of 505 discs.
Total packed length 3.4cm. |
|
235
|
Thursday, August 06, 2015, 15:45 |
Laura Lambert | Endcaps | | TARGET BOAT | Done | Sintering TaC coating on Ta endcaps | Thursday, August 06, 2015, 15:36
The endcaps are stacked together
with a punched out disc of graphite foil |
    |
234
|
Tuesday, August 04, 2015, 12:04 |
Laura Lambert | Ta | | TARGET BOAT | Done | Test for homogeneity: Sintering TaC coating on a Ta tube |
|
  |
233
|
Friday, July 31, 2015, 15:51 |
John Wong | Ta | | TARGET BOAT | In progress | Test for homogeneity: Sintering TaC coating on a Ta tube | Friday, July 31, 2015, 15:39
A Ta tube was coated with TaC. The
inner of the tube was filled with TaC solution |
|
232
|
Friday, July 31, 2015, 15:10 |
John Wong | | | | Maintenance | Installed leftside port | Friday, July 31, 2015, 15:09
The left side port was installed
on the evaporator #2. Leak check was |
|
231
|
Thursday, July 30, 2015, 17:07 |
John Wong | | | | Maintenance | Connect NALCW to EVAP1 | Thursday, July 30, 2015, 17:02
EVAP1 cooling system is now on the
NALCW. The city water has been removed |
|
230
|
Monday, July 13, 2015, 11:54 |
Laura Lambert | Endcaps | 40282-5 | TARGET BOAT | Problems | Sintering TaC coating on Ta endcaps | Monday, July 13, 2015, 11:53
A Ta foil is placed in the target |
   |