  249   Thursday, September 24, 2015, 09:48 Laura LambertEmpty41077-5 In progressSintering TaC coating container for UCx TargetThursday, September 24, 2015, 08:39
IGP1 = 6.5e-7Torr
HS water valves opened, no leaks
  
  248   Thursday, September 10, 2015, 12:05 John WongSiC39530-5HP-FEBIADDoneRe-conditioning SiC#32

    

       
            
 Screen_Shot_2015-09-15_at_12.37.19_PM.pngScreen_Shot_2015-09-18_at_9.10.13_AM.pngScreen_Shot_2015-09-24_at_11.30.25_AM.png 
  247   Thursday, September 10, 2015, 09:58 Laura LambertSiC39530-5HP-FEBIADIn progressRe-conditioning SiC#32

    

       
            
  
  246   Wednesday, September 09, 2015, 18:24 John WongSiC39530-5HP-FEBIADIn progressRe-conditioning SiC#32

    

       
            
 Screen_Shot_2015-09-09_at_5.53.15_PM.png 
  245   Tuesday, September 08, 2015, 15:56 John WongSiC39530-5HP-FEBIADIn progressSintering SiC#32

    

       
            
 SiC#33_HPFEBIAD_temp.PNGSiC#33_HPFEBIAD_temp.xlsxleft_window.JPGleft_window_1.JPG 
  244   Wednesday, September 02, 2015, 11:28 Laura LambertSiC39530-5HP-FEBIADIn progressSintering SiC#32

    

       
            
 Screenshot-1stsintering-prewindow_coating.JPG 
  243   Tuesday, September 01, 2015, 17:20 John WongSiC39530-5HP-FEBIADIn progressSintering SiC#32Tuesday, September 01, 2015, 17:16
Target container contains 533 discs
of SiC with packed length of 17cm. 
  
  242   Thursday, August 27, 2015, 16:37 John WongEmpty HP-FEBIADDoneSintering TaC coating container for SiC Target

    

       
            
  
  241   Tuesday, August 25, 2015, 11:54 Laura LambertEmpty HP-FEBIADIn progressSintering TaC coating container for SiC Target Tuesday, August 25, 2015, 11:50
Container coated with TaC using new
method: Ends tapped off,  with liquid
  
  240   Monday, August 24, 2015, 12:58 John Wong   MaintenanceReplacing turbo pump, IEVAP2TP1 Monday, August 24, 2015, 12:54
The turbo pump was found to be faulty.
 The pump couldn't get on full speed
  
  239   Thursday, August 20, 2015, 17:15 John WongTa HP-SISDoneConditioning Ta#46 Target

    

       
            
  
  238   Thursday, August 20, 2015, 10:07 Laura LambertTa HP-SISIn progressConditioning Ta#46 Target

    

       
            
  
  237   Wednesday, August 19, 2015, 17:26 John WongTa HP-SISIn progressConditioning Ta#46 Target

    

       
            
  
  236   Tuesday, August 18, 2015, 16:02 Laura LambertTa HP-SISIn progressConditioning Ta#46 TargetTuesday, August 18, 2015, 15:53
Target consists of 505 discs.
Total packed length 3.4cm.
  
  235   Thursday, August 06, 2015, 15:45 Laura LambertEndcaps TARGET BOATDoneSintering TaC coating on Ta endcaps Thursday, August 06, 2015, 15:36
The endcaps are stacked together
with a punched out disc of graphite foil
 round2_july_batch_(1).jpground2_july_batch_(2).jpground2_july_batch_(3).jpgsingle_round_sintering_(1).jpgsingle_round_sintering_(2).jpg 
  234   Tuesday, August 04, 2015, 12:04 Laura LambertTa TARGET BOATDoneTest for homogeneity: Sintering TaC coating on a Ta tube

    

       
            
 Temp_measurements_of_new_port_window_for_2nd_OMEGA.xlsxIMG_20150806_151719182.jpgIMG_20150806_151748536.jpg 
  233   Friday, July 31, 2015, 15:51 John WongTa TARGET BOATIn progressTest for homogeneity: Sintering TaC coating on a Ta tube Friday, July 31, 2015, 15:39
A Ta tube was coated with TaC.  The
inner of the tube was filled with TaC solution
 Screen_Shot_2015-07-31_at_3.46.10_PM.png 
  232   Friday, July 31, 2015, 15:10 John Wong   MaintenanceInstalled leftside portFriday, July 31, 2015, 15:09
The left side port was installed
on the evaporator #2.  Leak check was
  
  231   Thursday, July 30, 2015, 17:07 John Wong   MaintenanceConnect NALCW to EVAP1  Thursday, July 30, 2015, 17:02
EVAP1 cooling system is now on the
NALCW.  The city water has been removed
  
  230   Monday, July 13, 2015, 11:54 Laura LambertEndcaps40282-5TARGET BOATProblemsSintering TaC coating on Ta endcaps Monday, July 13, 2015, 11:53
A Ta foil is placed in the target
 endcaps_july_14_2015.JPGIMG_20150715_102332633.jpgIMG_20150715_102240364_HDR.jpgIMG_20150715_102631676.jpg 