  410   Wednesday, May 23, 2018, 15:21 Laura LambertEmpty HP-FEBIAD-CTLDoneSintering TaC coating container for UCx#23

Wednesday, May 16, 2018, 09:56

Container coated with TaC using 'flushing technique' and let dry over weekend.

Cleaned ionizer tube with acetone, no coating inside ionizer tube.

Wrapped with 3 x Ta heat shields, not incl center block

OMEGA slope = 0.98

*NOTE: realized after pumping down, filament on IGP2 is burnt out and needs replacing, will order a new one and use IGP1 for this process


Thursday, May 17, 2018, 13:15 

HS water valves remained open since the last time evap2 was used, no leak check done.

Tapped up manually to 50A.

Waited ~1hr

Vacuum stable.

IGP1 = 1e-6 Torr

Initiating auto ramp for TGHT @ 0.2A/min to a max setpoint of 350A

Initiating auto ramp for TBHT @ 0.1A/min to a max setpoint of 230A

Once max setpoints achieved, will tap up manually to final desired temperature of 1900C


Friday, May 18, 2018, 13:00 

Tapped up manually.

TGHT = 495A, 8.84V

TBHT = 230A, 3.26V

MIKRON = 2000C

Filament = 1910C

OMEGA = 1910C

Will remain at max setpoints over weekend.


Tuesday, May 22, 2018, 10:04 

Remained at max setpoints over long wknd.

TGHT = 495A, 8.85V

TBHT = 230A, 3.26V

IGP1 = 2.47e-7 Torr

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


Wednesday, May 23, 2018, 10:08 

Vented in air this morning.

Container looks good!

Transferred into glove box.


 

 

  409   Tuesday, May 08, 2018, 15:06 John Wongnp-SiCTube container  DoneNanoSiC thermal treatment batch#2

Tuesday, May 08, 2018, 15:02

22 np-SiC fibrous discs loaded in the tube container (coated and sintered with TaC)

Heat treatment is similar to previous process, see elog #408. 

TGHT should be set at 330A/5.2V to reach temp 1575C (+/- 25).

Omega slope set at 1.05 (for carbide)

Chamber is currently being pumped down


 Tuesday, May 08, 2018, 22:46

Pressure at 2.2e-6 Torr.

Initiated autoramping at 0.2A/min to reach 330A


 Friday, May 11, 2018, 11:11

TGHT reached to 330A/5.1V but temp was measured at 1400A; It was held at that current for about 10 hours.

Increased TGHT to 335A/5.2V - temp is holding at 1420C (Will check the window if there is any coating that might have caused the discrepancy)


 Sunday, May 13, 2018, 00:25

In fact, the window is slightly coated.  The temperature should already be at optimum, 1600C.  Will keep heating for another day.


 Sunday, May 13, 2018, 14:10

Temp holding up well.. Pressure at 1.8e-7 torr. 

cooling down at 2A/min.


 Monday, May 14, 2018, 09:33

Target has been cooled for over 18 hours.  Pressure at 1.1e-7 Torr.

Venting chamber.

mass loss = (8.65 - 4.32)g = 4.33 g (50%) [slightly higher than expected, likely due to increase of 5A on TGHT]


 

  408   Tuesday, May 01, 2018, 18:07 John Wongnp-SiCTube container DoneNanoSiC thermal treatment batch#1

Tuesday, May 01, 2018, 18:06

21 fibrous discs of nanoSiC are loaded into a tube container (coated/Sintered with TaC). 

Thermal treatment temperature at 1600C, TGHT is ~338A/5.5V, according to elog #407.


 Wednesday, May 02, 2018, 08:27

20 mins ago... initiate auto ramping at 0.2A to reach TGHT 250A.  Instead of ramping incrementally, TGHT jumped straight to 250A; vacuum shot up to milli torr.

Turn off TGHT immediately to let vacuum stable down to 10-6 Torr. 

System problem??  Archive striptool for more details. 

Re-activate auto-ramping - OK!

Once TGHT reached 250A (18 hours later from now), will continue ramping up to reach 1600C


 Friday, May 04, 2018, 01:09

TGHT just reach 250A, temp at about 1190C.  Pressure remained high at 4.2e-5 Torr. 

Continue autoramping to reach TGHT 300A.


 Friday, May 04, 2018, 11:07

TGHT at 300A for about 1.5 hr.  Temp at 1315C.  Pressure at 5.7e-6 Torr.

Autoramp to 320A.


 Friday, May 04, 2018, 14:39

Tapping up to 330A; temp at 1560C with slope changed to 1.05 (for carbide material). Will keep at this current/temp.


 Sunday, May 06, 2018, 13:25

TGHT at 330A/5.2V; holding temp at 1550C.  No coating on windows.  Pressure at 1.6e-7 Torr.

Cooling down at 2A/min. 


 Monday, May 07, 2018, 10:49

Evap cooled.  Venting chamber. 

Inspection of the discs next...

mass loss = 6.79 - 3.62 = 3.1 g (46%) [in agreement, good]


 

  407   Saturday, April 28, 2018, 16:12 John WongEmptyTube container  DoneTaC coating/sintering of Tube container

Saturday, April 28, 2018, 16:09

Container is coated with TaC and wrapped with TaC heatshield. 

Will be used for carbonizing nanoSiC target materials.

Chamber is pumping down...

Sintering temp 1800C, est TGHT ~550A


 Saturday, April 28, 2018, 18:08

Pressure at 5.e-6 Torr. 

Initial auto-ramp at 1.0A/min reaching TGHT 500A.  Monitoring temp.


 Sunday, April 29, 2018, 23:37

Target temp stabilizes at 1800C with TGHT holding at 400A/7.02V for 24 hours.  Pressure at 4.4 e-7 Torr.

Lower TGHT to 338A/5.51V to reach 1600C - This will temp/current will be used for carbonizing the nanoSiC fibers.

Holding TGHT overnight to determine temp stability.


 Monday, April 30, 2018, 18:04

Temp is holding at 1600C, TGHT 338A/5.5V.  Pressure at 3.0 e-7 Torr. 

Initiated cooling down at 2A/min.


 

  406   Wednesday, April 25, 2018, 07:21 Aaron Schmidt   DoneHS swap evap 2

Wednesday, April 25, 2018, 07:05: TGHT & TBHT off

Wednesday, April 25, 2018, 07:15: BV1 & TP1 off

Wednesday, April 25, 2018, 07:17: PV1 & BP1off

Wednesday, April 25, 2018, 07:19: Begin venting

Wednesday, April 25, 2018, 07:22: Full venting.

Wednesday, April 25, 2018, 07:29: HS waterlines purged.

Wednesday, April 25, 2018, 07:48: Aurelia's test ta target assembly was removed. The blank target heating heat shield for evap 2 was reinstalled. shields in but empty.

Evap 2 Doors closed.

  405   Thursday, April 19, 2018, 12:38 Laura LambertTa41177-3LP-SISDoneRound 2. Temp measurements for Aurelia target Ta#56

 Thursday, April 19, 2018, 12:37

See elog i.d. 404 for target description and first round of heating.

Endcaps inserted and expanded.

No Rh foil inserted.

Loaded into evap2 and chamber currently pumping down.


Thursday, April 19, 2018, 14:00: water cooling lines opened. No response. Vacuum @ 1.8e-06T - AS

Thursday, April 19, 2018, 14:07: Power supplies swtiched on. - AS

  404   Tuesday, April 17, 2018, 10:24 Laura LambertTa41177-3LP-SISDoneConditioning Ta#56 back-up target/ Temp measurements for Aurelia

 Tuesday, April 17, 2018, 10:20

Target consists of 470 discs.

Total packed length 3.4cm [exactly 7.8cm space on both sides]

Total mass g [Incl foils + Ta wire on 6 packs]

Target consists of 350 single discs and 6x20 packs of Ta discs

Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack

No Heat shields.

No endcaps inserted, no Rh foil inserted.

Chamber pumped down over night.

HS water valves opened, no leaks detected
 
Tapped up manually to 35A
 
Vacuum stable, IGP1 = 6.5e-7 Torr
 
Initiating auto-ramp.
 
OMEGA slope = 0.98

TGHT will be ramped up to 300A at 1.0A/min.

Aurelia will take over for temp measurements.

Final desired temperature = 1900C

Vacuum limit stop at 3.0e-5 Torr, backing off at 8.0e-5 Torr.


 Thursday, April 19, 2018, 08:39

First round of temperature measurements complete.

Reached a max current of 600A, ~1700C

Cooled down overnight.

Will remove from evap2, insert endcaps, and load back in for more measurements.


 Thursday, April 19, 2018, 12:35

Vented in air and removed from evap2.

See next elog for follow up temperature measurements.


 

  403   Thursday, March 08, 2018, 11:05 Marla CervantesEmpty39530-3LP-FEBIADDoneTemperature measurements for ARIEL

 Friday, March 09, 2018, 11:03

LP-FEBIAD loaded into evap2 and pumped down.

Temperature measurements of the ionizer will be done by Fernando for ARIEL development.

Ta foil covering side holes on heat shield so no temp measurements can be done using OMEGA on side ports of evaporator as per request of Fernando

No Ta heat shields on container.

HS water valves opened, no leaks detected.

IGP1 = 1.72e-7 Torr

 

 

IGP2 = 1.36e-7 Torr

Tapped up to TGHT = 50 A, 0.54 V; TBHT = 50 A, 0.45 V

IGP1 = 1.8e-6 Torr

IGP2 = 1.4e-6 Torr

Initiating auto ramp for TGHT at 2.0A/min up to 310A and TBHT at 1.0A/min up to 210A


Monday, March 12, 2018, 10:16 

IGP1 = 8.8e-8 Torr

IGP2 = 6.6e-8 Torr

TGHT = 310A, 5.06V

TBHT = 210A, 2.98 V

TGHT and TBHT will be adjusted accordingly for temperature measurements


Tuesday, March 13, 2018, 16:00 

Temperature measurements done.

Initiated auto-cool.

TGHT cooling at 2.0A/min and TBHT at 1.0A/min.


 

 

 

 

 

 

 

 

 

 

 

Wednesday, March 14, 2018, 16:03

Removed from evap2.

  402   Wednesday, February 28, 2018, 15:18 Laura LambertEmpty42218-13LP-SISDoneSintering TaC coating on UCx#22 container

 Wednesday, February 28, 2018, 15:16

Container coated with TaC using 'flushing technique' and let dry.

Q-tip to plug ionizer became stuck in ionizer, removed manually with small drill bit.

Inspected ionizer with microscope, ionizer still good.

Cleaned ionizer tube with acetone.

Wrapped with 3 x Ta heat shields, incl center block

Currently pumping down in evap2

OMEGA slope = 0.98

Good vac at 3.0e-5, bad vac at 8.0e-5 Torr.


 Thursday, March 01, 2018, 10:06

HW water valves opened yesterday, no leaks detected.

IGP1 = 2.8e-7 Torr

Tapped up manually to 40A.

Waited ~3hrs

Vacuum stable.

IGP1 = 5.3e-7 Torr

IGP2 = 5.4e-7 Torr

Initiating auto ramp for TGHT @ 1.0A/min to a max setpoint of 350A

Initiating auto ramp for TBHT @ 0.5A/min to a max setpoint of 230A

Once max setpoints achieved, will tap up manually to final desired temperature of 1900C


 Thursday, March 01, 2018, 14:39

Vacuum started to climb very fast - auto-ramp was stopped.

Vacuum climbed up to IGP1 = 1.3e-4 Torr

Tapped TGHT back down to 80A from 90A, TBHT down to 50A from 60A.

Waited ~40min.

Vacuum stable, IGP1 = 2.6e-6 Torr

Restarting auto-ramp.


 Thursday, March 01, 2018, 14:54

IGP1 = 2.1e-5 Torr

Vacuum climbing quite rapidly again, stopped auto-ramp and vacuum started to drop right away.

TGHT = 100A

TBHT = 56A

Waited ~10min

IGP1 = 6.0e-6 Torr

IGP2 = 5.2e-6 Torr

Decreasing ramping rate to 0.5A/min and 0.2A/min for the TGHT and TBHT respectively, and re-initiating auto-ramp.


 Friday, March 02, 2018, 10:18

TGHT = 350A, 5.61V

TBHT = 230A, 4.04V

IGP1 = 4.3e-7 Torr

IGP2 = 3.8e-7 Torr

OMEGA = 1624C

Vacuum stable.

Increasing max setpoint of TGHT to 400A

Re-initiating auto-ramp of TGHT.


 Friday, March 02, 2018, 11:04

TGHT = 372A, 6.05V

IGP1 = 5.0e-7 Torr

Increasing ramping rate for TGHT to 1.0A/min


 Friday, March 02, 2018, 11:44

TGHT = 400A, 6.60V

IGP1 = 6.9e-7 Torr

OMEGA = 1780C

Vacuum stable.

Increasing max setpoint of TGHT to 430A

Re-initiating auto-ramp of TGHT.


 Friday, March 02, 2018, 12:17

TGHT = 430A, 7.22V

OMEGA = 1866C

IGP1 = 9.5e-7 Torr

Tapped up manually to OMEGA = 1910C

TGHT = 445A, 7.57V

TBHT = 230A, 4.07V

IGP1 = 1.1e-6 Torr

IGP2 = 9.9e-7 Torr


 Monday, March 05, 2018, 08:41

Remained at max setpoints over the weekend.

TGHT = 445A, 7.47V

TBHT = 230A, 4.06V

IGP1 = 1.87e-7 Torr

IGP2 = 1.47e-7 Torr

OMEGA = 1894C

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 Tuesday, March 20, 2018, 14:53

Vented in air.

Container was transferred to glove box for loading ~1 week ago

Container looks good.


 

  401   Monday, February 19, 2018, 14:16 Laura LambertEmpty39530-3LP-FEBIADDoneTemperature measurements for ARIEL

Monday, February 19, 2018, 13:39

LP-FEBIAD loaded into evap2 this morning and pumped down.

Temperature measurements of the ionizer will be done by Fernando for ARIEL development.

Ta foil covering side holes on heat shield so no temp measurements can be done using OMEGA on side ports of evaporator as per request of Fernando

No Ta heat shields on container.

HS water valves opened, no leaks detected.

IGP1 = 2.75e-6 Torr

IGP2 = 1.42e-6 Torr

Tapped up to TGHT = 50A, 0.53V; TBHT = 50A, 0.56V

IGP1 = 2.64e-6 Torr

IGP2 = 1.35e-6 Torr

Initiating auto ramp for TGHT at 2.0A/min up to 350A and TBHT at 1.0A/min up to 210A


 Tuesday, February 20, 2018, 09:15

IGP1 = 6.9e-7 Torr

IGP2 = 3.8e-7 Torr

TGHT = 350A, 5.98V

TBHT = 210A, 3.02V

TGHT and TBHT will be adjusted accordingly for temperature measurements...


 Tuesday, February 27, 2018, 14:55

Temperature measurements done.

Initiated auto-cool.

TGHT cooling at 2.0A/min and TBHT at 1.0A/min.


 Wednesday, February 28, 2018, 10:39

Tuesday, December 19, 2017, 11:40

Vented in air and removed from evap2 today.


 

  400   Wednesday, December 13, 2017, 10:55 Laura LambertEmpty39530-3LP-FEBIADDoneTemperature measurements for ARIEL

 Wednesday, December 13, 2017, 10:36

LP-FEBIAD loaded into evap2 this morning and pumped down.

Temperature measurements of the ionizer will be done by Fernando for ARIEL development.

Ta foil covering side holes on heat shield so no temp measurements can be done using OMEGA on side ports of evaporator as per request of Fernando

No Ta heat shields on container.

HS water valves opened, no leaks detected.

IGP1 = 2.3e-6 Torr

IGP2 = 1.7e-6 Torr

Tapped up to TGHT = 50A, 0.30V; TBHT = 50A, 0.59V

IGP1 = 1.8e-6 Torr

IGP2 = 1.4e-6 Torr

Initiating auto ramp for TGHT at 2.0A/min up to 350A and TBHT at 1.0A/min up to 210A


 Wednesday, December 13, 2017, 14:53

IGP1 = 7.6e-7 Torr

IGP2 = 6.4e-7 Torr

TGHT = 350A, 5.85V

TBHT = 210A, 3.02V

TGHT and TBHT will be adjusted accordingly for temperature measurements...


Thursday, December 14, 2017, 09:16 

IGP1 = 2.1e-7 Torr

IGP2 = 1.7e-7 Torr

TGHT = 385A, 6.80V

TBHT = 210A, 3.01V

Tapped up to TGHT = 400A, 7.11V

Stopped for temperature measurements.

Tapped up to TGHT = 450A, 8.20V


 Friday, December 15, 2017, 09:50

IGP1 = 1.2e-7 Torr

IGP2 = 9.6e-8 Torr

TGHT = 350A, 5.82V

TBHT = 210A, 2.94V

Initiating auto-ramp to TGHT = 650A


Monday, December 18, 2017, 10:43

Temperature measurements done.

Initiated auto-cool.

TGHT cooling at 2.0A/min and TBHT at 1.0A/min.


 Tuesday, December 19, 2017, 11:40

Vented in air and removed from evap2 today.


 

  399   Monday, December 11, 2017, 14:22 Laura Lambert   MaintenanceInterlock limits updated to 500mTorr

 Monday, December 11, 2017, 14:21

Dave updated evap2 interlock limits to 500mTorr for TGHT and TBHT on friday


 

  398   Friday, December 08, 2017, 15:42 Laura LambertEndcaps TARGET BOATDoneSintering TaC coating on endcaps and springs

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

 Thursday, December 07, 2017, 09:57

Each endcap is wrapped in a separate piece of graphite foil and placed in a target boat.

There are also 4 coated springs, 2 on each side of the stack of endcaps.

The boat is wrapped with 3-layers of Ta heatshields.

Chamber pumped down overnight.

OMEGA slope = 0.98

HS water valves opened, no leaks detected.

IGP1 = 5.9e-7 Torr

IGP2 = 4.0e-7 Torr

Tapping up manually.

Final desired temperature = 1800C


 

 Thursday, December 07, 2017, 11:51

TGHT tripped off.

Turns out the vacuum limits have not been fully updated when they should have been and the old ones still apply.

IGP1 reached 8e-5 Torr which tripped off the system.

TGHT = 80A, 1.05V when the system tripped.


 

 Friday, December 08, 2017, 15:29

Interlocks have been updated.

TGHT should now run up to 500mTorr before tripping off.


 

Friday, December 08, 2017, 15:41

IGP1 = 2.8e-7 Torr

IGP2 = 1.9e-7 Torr

Tapped up manually to 50A

Initiated auto-ramp at a rate of 0.2A/min up to 300A.

Vacuum limit stop at 3.0e-5 Torr, backing off at 4.0e-5 Torr.


 Monday, December 11, 2017, 09:37

IGP1 = 2.4e-7

TGHT = 300A, 4.80V

OMEGA = 1175C

Tapping up manually...


 Monday, December 11, 2017, 14:19

Tapped up manually to 1800C

IGP1 = 2.1e-6 Torr

IGP2 = 2.1e-6 Torr

TGHT = 545A, 9.90V

OMEGA = 1810C

Will remain at max setpoints overnight and cool down in the a.m.


 Tuesday, December 12, 2017, 09:01

TGHT = 545A, 9.96V

OMEGA = 1833C

Remained at max setpoints for ~18hrs

IGP1 = 4.2e-7 Torr

IGP2 = 3.9e-7 Torr

Initiating auto-cool at 2.0A/min


 Wednesday, December 13, 2017, 11:05

Vented in air and removed from evap2 this morning.


 

  397   Friday, December 08, 2017, 15:29 Laura LambertEndcaps TARGET BOATProblems resolvedSintering TaC coating on endcaps and springs

Laura Lambert wrote:

Laura Lambert wrote:

 Thursday, December 07, 2017, 09:57

Each endcap is wrapped in a separate piece of graphite foil and placed in a target boat.

There are also 4 coated springs, 2 on each side of the stack of endcaps.

The boat is wrapped with 3-layers of Ta heatshields.

Chamber pumped down overnight.

OMEGA slope = 0.98

HS water valves opened, no leaks detected.

IGP1 = 5.9e-7 Torr

IGP2 = 4.0e-7 Torr

Tapping up manually.

Final desired temperature = 1800C


 

 Thursday, December 07, 2017, 11:51

TGHT tripped off.

Turns out the vacuum limits have not been fully updated when they should have been and the old ones still apply.

IGP1 reached 8e-5 Torr which tripped off the system.

TGHT = 80A, 1.05V when the system tripped.


 

 Friday, December 08, 2017, 15:29

Interlocks have been updated.

TGHT should now run up to 500mTorr before tripping off.


 

  396   Thursday, December 07, 2017, 11:56 Laura LambertEndcaps TARGET BOATProblemsSintering TaC coating on endcaps and springs

Laura Lambert wrote:

 Thursday, December 07, 2017, 09:57

Each endcap is wrapped in a separate piece of graphite foil and placed in a target boat.

There are also 4 coated springs, 2 on each side of the stack of endcaps.

The boat is wrapped with 3-layers of Ta heatshields.

Chamber pumped down overnight.

OMEGA slope = 0.98

HS water valves opened, no leaks detected.

IGP1 = 5.9e-7 Torr

IGP2 = 4.0e-7 Torr

Tapping up manually.

Final desired temperature = 1800C


 

 Thursday, December 07, 2017, 11:51

TGHT tripped off.

Turns out the vacuum limits have not been fully updated when they should have been and the old ones still apply.

IGP1 reached 8e-5 Torr which tripped off the system.

TGHT = 80A, 1.05V when the system tripped.


 

Attachment 1: trip_due_to_new_vacuum_limits_not_being_updated_properly.JPG
trip_due_to_new_vacuum_limits_not_being_updated_properly.JPG
  395   Thursday, December 07, 2017, 10:03 Laura LambertEndcaps TARGET BOATIn progressSintering TaC coating on endcaps and springs

 Thursday, December 07, 2017, 09:57

Each endcap is wrapped in a separate piece of graphite foil and placed in a target boat.

There are also 4 coated springs, 2 on each side of the stack of endcaps.

The boat is wrapped with 3-layers of Ta heatshields.

Chamber pumped down overnight.

OMEGA slope = 0.98

HS water valves opened, no leaks detected.

IGP1 = 5.9e-7 Torr

IGP2 = 4.0e-7 Torr

Tapping up manually.

Final desired temperature = 1800C


 

  394   Wednesday, November 29, 2017, 16:18 Laura LambertEmpty39530-3LP-FEBIADDoneTemperature measurements for ARIEL

 Wednesday, November 29, 2017, 16:17

LP-FEBIAD loaded into evap2 today and currently pumping down.

Temperature measurements of the ionizer will be done by Fernando for ARIEL development.

Ta foil covering side holes on heat shield so no temp measurements can be done using OMEGA on side ports of evaporator as per request of Fernando

No Ta heat shields on container.

Final desired temperature of ionizer = 2000C


 Thursday, November 30, 2017, 09:51

HS water valves opened, no leaks detected.

IGP1 = 2.1e-7 Torr

IGP2 = 1.7e-7 Torr

Tapped up to TGHT = 350A, 5.83V; TBHT = 230A, 3.31V

IGP1 = 6.3e-7 Torr

IGP2 = 3.7e-7 Torr

Will check temp measurements in lab after lunch before proceeding...


 Friday, December 01, 2017, 11:04

Temperature measurements done.

Initiated auto-cool this morning.

TGHT cooling at 2.0A/min and TBHT at 1.0A/min.


Monday, December 04, 2017, 11:04

Removed from evap2 this morning.

  393   Thursday, November 23, 2017, 15:10 Laura Lambert 41882-4TARGET BOATDoneGraphite insert test

 Thursday, November 23, 2017, 14:54

Graphite insert loaded into previously TaC coated target boat.

One endcap removed to allow for outgassing: left side out, right side in.

Weight of graphite tube + single endcap = 10.2012g

Same Ta heats shields remain on container from sintering TaC coating.

Currently pumping down in evap2.


Friday, November 24, 2017, 11:31

IGP1 = 4.52e-7 Torr

IGP2 = 3.43e-7 Torr

OMEGA slope = 0.98

Good vac at 3.0e-4, bad vac at 8.0e-4 Torr.

HS water valves have remained open since the last time evap2 was used.

No leak check done.

Tapped up manually to 50A.

Vacuum stable.

IGP1 = 5.34e-7 Torr

IGP2 = 5.54e-7 Torr

Initiating auto ramp for TGHT @ 0.2A/min to a max setpoint of 300A

Once max setpoints achieved, will tap up manually to final desired temperature of 2000C

Uranium targets go to a max temperature of 1950C online, so graphite insert should be tested to 2000C


 Monday, November 27, 2017, 10:15

IGP1 = 2.5e-7 Torr

IGP2 = 1.9e-7 Torr

Reached 300A, 4.61V

OMEGA = 1298C

Tapped up manually to 485A, 8.46V

OMEGA = 1808C

Remained at this setpoint for a day


Tuesday, November 28, 2017, 15:41 

IGP1 = 3.88e-7 Torr

IGP2 = 3.58e-7 Torr

Tapping up to 2000C...


Tuesday, November 28, 2017, 16:10 

TGHT = 570A, 10.20V

OMEGA = 2005C

IGP1 = 9.64e-7 Torr

IGP2 = 1.05e-6 Torr

There was a minor drop in voltage at 540A, 9.58V - dropped to ~9.4V then slowly went back up to 9.58V [see photo]

Will remain at this setpoint overnight and cool down in the a.m.


 Wednesday, November 29, 2017, 08:48

Voltage increased slowly while sitting at max setpoint of 570A [see photo]

TGHT = 570A, 11.20V --> voltage increased by 1.0V over ~16.5hrs

OMEGA = 2114C

IGP1 = 6.6e-7 Torr

IGP2 = 6.5e-7 Torr

Initiating auto-cool at 2.0A/min


 Wednesday, November 29, 2017, 16:15

Vented in air and removed today.

Will update tomorrow with results and photos.


 

Attachment 1: IMG_0018.JPG
IMG_0018.JPG
Attachment 2: IMG_0021.JPG
IMG_0021.JPG
Attachment 3: IMG_0028.JPG
IMG_0028.JPG
Attachment 4: IMG_0029.JPG
IMG_0029.JPG
Attachment 5: voltage_drop_11.28.2017.JPG
voltage_drop_11.28.2017.JPG
Attachment 6: voltage_increase_11.29.2017.JPG
voltage_increase_11.29.2017.JPG
  392   Tuesday, November 21, 2017, 13:55 Laura LambertEmpty41882-4TARGET BOATDoneSintering TaC coating on fully enclosed target boat for graphite test

 Tuesday, November 21, 2017, 12:01

Boat coated with TaC using 'flushing technique' and let dry overnight.

Wrapped with 1 long Ta heat shield 3x

Loaded into evap2 just before lunch

IGP1 = 7.1e-6 Torr

OMEGA slope = 0.98

Good vac at 3.0e-4, bad vac at 8.0e-4 Torr.

HS water valves have remained open since the last time evap2 was used.

No leak check done.

Tapped up manually to 35A.

Waited ~25min

Vacuum stable.

IGP1 = 1.15e-5 Torr

IGP2 = 1.17e-5 Torr

Initiating auto ramp for TGHT @ 0.2A/min to a max setpoint of 300A

Once max setpoints achieved, will tap up manually to final desired temperature of 1900C


 Wednesday, November 22, 2017, 09:32

TGHT = 270A, 4.15V

OMEGA = 1285C

IGP1 = 1.23e-6 Torr

IGP2 = 1.13e-6 Torr

Vacuum stable.

Increasing ramping rate to 1.0A/min and final setpoint to 350A


 Wednesday, November 22, 2017, 10:25

TGHT = 325A, 5.15V

OMEGA = 1500C

IGP1 = 2.80e-6 Torr

IGP2 = 2.93e-6 Torr

Vacuum stable.

Increasing ramping rate to 1.5A/min and final setpoint to 400A


 Wednesday, November 22, 2017, 10:49

TGHT = 350A, 5.60V

OMEGA = 1580C

IGP1 = 4.5e-6 Torr

IGP2 = 4.9e-6 Torr

Vacuum stable.

Increasing ramping rate to 2.0A/min


 Wednesday, November 22, 2017, 11:18

TGHT = 400A, 6.64V

OMEGA = 1734C

IGP1 = 5.8e-6 Torr

IGP2 = 6.2e-6 Torr

Vacuum stable.

Increasing final setpoint to 450A.


 Wednesday, November 22, 2017, 15:59

TGHT = 460A, 8.07V

OMEGA = 1898C

IGP1 = 1.34e-6 Torr

IGP2 = 1.27e-6 Torr

Sintering process complete.

Remained at max setpoints for just over 4hrs.

Initiating auto-cool at 2.0A/min.


 Thursday, November 23, 2017, 13:09

Removed from evap2 this morning.

Coating looks good.


 

  391   Monday, November 06, 2017, 18:25 John Wongnp-SiC TARGET BOATDoneThermal treatment npSiC Horn vs Probe samples - P74

Monday, November 06, 2017, 18:21

Samples of Horn and Probe - npSiC. see pg 74.

6 samples in total, to be heated to 1550C, about 450A.  Set ramping rate at 0.2A/min.  

Chamber pumping down


 Tuesday, November 07, 2017, 15:01

TGHT reached to 450A/8.2V, temperature measured at 1460C.  See attachment 1.

Increased ramping to 480A, targeting 1550C.


 Tuesday, November 07, 2017, 22:26

Samples have been heating at 1550C with TGHT at 480A/8.78V for about 8 hours.

Vacuum stabilizes at 8.4e-7 Torr.

Initial cooling at 2A/min.


 Wednesday, November 08, 2017, 10:36

Venting chamber.


 

Attachment 1: Capture1.JPG