Entry  Monday, July 10, 2017, 17:36, John Wong, np-SiC, , TARGET BOAT, Problems, Water Sensor Problem, TGHT Tripped. (np-SiC fibrous Pellet: Applied pressure vs Density) Graph3a.JPG
Monday, July 10, 2017, 17:28
Two np-SiC fibrous pellets with different applied pressure:
1) 200MPa, 2)  335 MPa (see logbook pg 36 for more details). 
Entry  Tuesday, June 20, 2017, 16:07, Laura Lambert, Ta, 42218-6, HP-SIS, Done, Conditioning Ta#53 Ta#53.JPG
 Tuesday, June 20, 2017, 15:58
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides]
Entry  Wednesday, June 14, 2017, 15:51, Laura Lambert, SiC, 40282-4, TARGET BOAT, In progress, Sintering SiC pellets 
 Wednesday, June 14, 2017, 15:49
Pellets previously made by Marla and weighed.
Pellets are placed inside a small graphite sample tube.
    Reply  Friday, June 16, 2017, 10:42, Marla Cervantes, SiC, 40282-4, TARGET BOAT, Done, Sintering SiC pellets 


    
        
            Laura Lambert wrote:
        
        
            
             Wednesday, June 14, 2017, 15:49
       Reply  Friday, June 16, 2017, 15:14, Laura Lambert, SiC, 40282-4, TARGET BOAT, Done, Sintering SiC pellets 20170619_111816.jpg20170619_111848.jpg


    
        
            Marla Cervantes wrote:
        
        
            
            
            
Entry  Monday, June 05, 2017, 15:20, Laura Lambert, Empty, 42218-15, LP-SIS, Done, Sintering TaC coating on UCx#21 container 
 Monday, June 05, 2017, 15:20
Container coated with TaC using 'flushing technique' and let dry over weekend.
Cleaned ionizer tube with acetone, no coating inside ionizer tube.
Entry  Tuesday, May 30, 2017, 14:40, Laura Lambert, Ta, 42218-14, LP-SIS, Done, Conditioning Ta#52 
 Tuesday, May 30, 2017, 14:36
Target consists of 400 discs.
Total packed length 2.9cm [exactly 8.05cm space on both sides]
Entry  Tuesday, May 16, 2017, 11:57, Laura Lambert, SiC, 41369-10, HP-FEBIAD-CTL, Done, Sintering SiC#36 window_at_max_setpoint_after_1_day.jpg20170530_094047_Richtone(HDR).jpg20170530_094118_Richtone(HDR).jpg20170530_094137_Richtone(HDR).jpg
 Tuesday, May 16, 2017, 10:56
Target container contains 460 discs of SiC 
Target packed length = 17cm. 
Entry  Thursday, April 27, 2017, 15:54, Laura Lambert, SiC, 39530-10, HP-FEBIAD, In progress, Sintering SiC#36 
 Thursday, April 27, 2017, 14:01
Target container contains 470 discs of SiC 
Target packed length = 16cm. 
    Reply  Wednesday, May 03, 2017, 13:48, Laura Lambert, SiC, 39530-10, HP-FEBIAD, Problems, Sintering SiC#36 vacuum_trip3.JPGvacuum_trip4.JPG


    
        
            Laura Lambert wrote:
        
        
            
             Thursday, April 27, 2017, 14:01
       Reply  Wednesday, May 03, 2017, 16:09, Laura Lambert, SiC, 39530-10, HP-FEBIAD, Problems resolved, Sintering SiC#36 


    
        
            Laura Lambert wrote:
        
        
            
            
            
          Reply  Wednesday, May 03, 2017, 16:10, Laura Lambert, SiC, 39530-10, HP-FEBIAD, Done, Sintering SiC#36 8x


    
        
            Laura Lambert wrote:
        
        
            
            
            
             Reply  Thursday, May 11, 2017, 11:36, Laura Lambert, SiC, 39530-10, HP-FEBIAD, Done, Sintering SiC#36 - not SiC#36: now back-up [SiC#36 should be HP-FEBIAD-CTL!!!] 


    
        
            Laura Lambert wrote:
        
        
            
            
            
Entry  Thursday, May 11, 2017, 11:30, Laura Lambert, , , , Maintenance, New Ion Gauge for IGP2 
 Thursday, May 11, 2017, 11:25
IGP2 has been having problems where sometimes it turns off and requires simply unplugging and plugging back in.
Ion gauge has been replaced.
Entry  Thursday, May 11, 2017, 11:25, Laura Lambert, Empty, 41369-10, HP-FEBIAD-CTL, Done, RUSH! Sintering TaC coated container for SiC#36 LS_during_TaC_sintering.jpgRS_during_TaC_sintering.jpg
 Thursday, May 11, 2017, 11:21
Turns out SiC HP-FEBIAD that has finished conditioning is loaded in the wrong container and it should be a SiC HP-FEBIAD cold transfer line...so
rush on new target.
Entry  Wednesday, May 10, 2017, 16:07, Laura Lambert, Empty, , TARGET BOAT, In progress, Conditioning Heat Shield for IGLIS UCx#20 - test stand is down 
 Wednesday, May 10, 2017, 16:05
Loaded.
HS water valves opened, no leaks detected.
    Reply  Wednesday, May 10, 2017, 21:33, Anders Mjos, Empty, , TARGET BOAT, In progress, Conditioning Heat Shield for IGLIS UCx#20 - test stand is down 


    
        
            Laura Lambert wrote:
        
        
            
             Wednesday, May 10, 2017, 16:05
       Reply  Thursday, May 11, 2017, 10:51, Laura Lambert, Empty, , TARGET BOAT, Done, Conditioning Heat Shield for IGLIS UCx#20 - test stand is down 


    
        
            Anders Mjos wrote:
        
        
            
            
            
Entry  Monday, May 08, 2017, 10:05, Laura Lambert, , , , Maintenance, Turbo pump control box replaced 
 Monday, May 08, 2017, 10:05
Turbo pump control box died last week.
Replaced with a new one.
Entry  Thursday, April 20, 2017, 12:45, John Wong, np-SiC, , TARGET BOAT, In progress, Higher Temp Treament: B3-92Mpa pellets  B3_PAN_pellets_1800c.JPG
Thursday, April 20, 2017, 12:38
3 samples are loaded into the Ta boat and wrapped with heat shield (1 long piece, 3 rounds):  2x of B3-92Mpa pellets and 10% pure PAN pellet
as control.  See lab book page 32 for more details.
Entry  Thursday, April 13, 2017, 12:03, Laura Lambert, SiC, , TARGET BOAT, Done, Sintering SiC pellets IMG_1657.JPGIMG_1659.JPG
 Thursday, April 13, 2017, 12:01
Pellets made this morning and weighed.
Placed in a graphite boat which is placed inside a previously TaC coated boat.
Entry  Wednesday, April 05, 2017, 15:42, Laura Lambert, Empty, , TARGET BOAT, In progress, Sintering TaC coating on evap1 target boat 
 Wednesday, April 05, 2017, 15:36
Coated container with TaC coating using spray technique this morning and let dry.
Wrapped with one long layer of Ta heat shield, wrapped around boat 3x
    Reply  Thursday, April 06, 2017, 08:57, Laura Lambert, Empty, , TARGET BOAT, Problems, Sintering TaC coating on evap1 target boat Capture.JPG


    
        
            Laura Lambert wrote:
        
        
            
             Wednesday, April 05, 2017, 15:36
       Reply  Thursday, April 06, 2017, 11:15, Laura Lambert, Empty, , TARGET BOAT, Problems resolved, Sintering TaC coating on evap1 target boat IMG_1615.JPGIMG_1611.JPG


    
        
            Laura Lambert wrote:
        
        
            
            
            
          Reply  Thursday, April 06, 2017, 13:16, Laura Lambert, Empty, 40282-2, TARGET BOAT, Done, Sintering TaC coating on evap1 target boat IMG_1653.JPG


    
        
            Laura Lambert wrote:
        
        
            
            
            
Entry  Friday, March 31, 2017, 12:22, John Wong, np-SiC, , TARGET BOAT, In progress, Thermo test: B3 Pellets (13.3K-PSI)  heating_curve_00.JPGheating_curve_13PSI_pellets_01.JPG
Friday, March 31, 2017, 12:21
Two compressed pellets loaded into the target boat and wrapped with Ta foil.  (see lab book p32 for details).
Chamber is pumping down.
Entry  Monday, March 13, 2017, 15:34, Anders Mjos, Ta, 41790-4, LP-SIS, Done, Conditioning Ta#51 
Target container wrapped in 3x heat shield foils and installed by JW
 Monday, March 13, 2017, 15:33: Opened water for HS. Vacuum stable at IG1 1E-6 T 
Monday, March 13, 2017, 15:48: TGHT / TBHT to 30 / 15 A.
Entry  Saturday, March 11, 2017, 11:58, John Wong, np-SiC, , TARGET BOAT, Done, Thermo test B3 Pellets heating_curve_900PSI_pellet.JPG
Friday, March 10, 2017, 17:29
Three B3 pellets are loaded into the container for thermo test. 
(see lab book1 Pg 26, 28-30 for more detail about the materials)
Entry  Tuesday, February 21, 2017, 15:21, Laura Lambert, Empty, 42218-1, LP-IG-LIS, Done, sintering TaC coating on UCx#20 container IMG_1562.JPGIMG_1564.JPG
Tuesday, February 21, 2017, 15:19
Container coated with TaC using 'flushing technique' and let dry overnight.
Cleaned ionizer tube with acetone, no coating inside ionizer tube
Entry  Friday, February 03, 2017, 14:18, Laura Lambert, Endcaps, , TARGET BOAT, Problems, Sintering TaC coating on Ta endcaps and springs IMG_1526.JPGIMG_1527.JPG
 Friday, February 03, 2017, 14:17
The endcaps are stacked together with a punched out disc of graphite foil placed in between each
endcap for separation so endcaps won't fuse together.
    Reply  Tuesday, February 14, 2017, 15:44, Laura Lambert, Endcaps, , TARGET BOAT, Problems resolved, Sintering TaC coating on Ta endcaps and springs 


    
        
            Laura Lambert wrote:
        
        
            
             Friday, February 03, 2017, 14:17
       Reply  Tuesday, February 14, 2017, 15:48, Laura Lambert, Endcaps, , TARGET BOAT, Done, Sintering TaC coating on Ta endcaps and springs IMG_1542.JPGIMG_1545.JPGIMG_1549.JPGIMG_1552.JPG


    
        
            Laura Lambert wrote:
        
        
            
            
            
Entry  Thursday, February 09, 2017, 23:28, John Wong, np-SiC, , TARGET BOAT, Done, Thermotest: SiC-SiO2-Lys and SiC pellets striptool_01.JPG
Thursday, February 09, 2017, 23:26
There are two types of samples being test for thermal stability:
1.  SiC-SiO2-Lys nanofiber mats