  599   Tuesday, November 01, 2022, 17:35 John WongTiC TARGET BOATDoneNp-TiC fibres systhesisTuesday, November 01, 2022, 17:24
2 samples of np-TiO2/C fibres were
produced using the e-spinner.  Each
 TiO2_C_fibres_carbonization_elog599.png 
  598   Friday, October 28, 2022, 07:59 Darwin Ortiz RosalesTaC45220-6LP-SISDoneTaC coating sinteringFriday, October 28, 2022, 07:58
The coated container was wrapped
in four Ta foil heatshields.
  
  597   Tuesday, October 25, 2022, 12:25 Darwin Ortiz RosalesTaC44139-15-SKLP-SISDoneTaC coating sinteringTuesday, October 25, 2022, 12:18
Container wrapped in 4 Ta foil heatshields
Target temperature on OMEGA= 1850-1900
  
  596   Wednesday, October 19, 2022, 09:50 John WongTiCTarget boat (tube)TARGET BOATDoneSynthesis of TiC


   
        
            
 Screenshot_2022-10-19_102257.pngScreenshot_2022-10-19_120146.pngScreenshot_2022-10-19_195305.pngScreenshot_2022-10-21_085223.png 
  595   Tuesday, October 18, 2022, 13:59 Hannah ToyTiCTarget boat (tube)TARGET BOATDoneSynthesis of TiC Tuesday, October 18, 2022, 13:52
38 pieces of samples made of TiO2/C/PVP
loaded into a target boat wrapped with 2
  
  594   Monday, October 17, 2022, 11:32 Darwin Ortiz RosalesTaC45220-2LP-SISDoneTaC coating sinteringMonday, October 17, 2022, 10:03
The coated container was wrapped
in 4 Ta foil heatshields.
  
  593   Thursday, September 29, 2022, 10:02 Darwin Ortiz Rosales 44139-3TARGET BOATDone220926-Graphite conditioning in target tubeThursday, September 29, 2022, 09:57
A Ta container tube was wrapped with
3 Ta heatshields.
  
  592   Thursday, September 22, 2022, 07:15 Darwin Ortiz RosalesTaC TARGET BOATDoneTaC coated endcaps and spring sinteringThursday, September 22, 2022, 07:13
Each endcap is separated with
  
  591   Wednesday, September 14, 2022, 11:48 Darwin Ortiz Rosales  TARGET BOATDoneGrahite disc conditioning 220907GWednesday, September 14, 2022, 9:30
A Ta container tube was wrapped with
3 Ta heatshields.
  
  590   Thursday, September 01, 2022, 12:32 Darwin Ortiz RosalesTaC44691-13LP-SISDoneTaC coating sinteringThursday, September 01, 2022, 10:34
The coated container was wrapped
in three Ta foil heatshields.
 MicrosoftTeams-image_(13).png 
  589   Thursday, August 25, 2022, 10:16 Darwin Ortiz RosalesTiC44692-10HP-FEBIADDoneTiC 220818 Sintering (TiC #6)Thursday, August 25, 2022, 10:06
 
Target container is loaded with 379
  
  588   Wednesday, August 10, 2022, 09:31 Ivan BaoEmpty TARGET BOATIn progressTC tests1st test polarity 1
10:12 am Begin pumping down to rough
vacuum
  
  587   Thursday, August 04, 2022, 09:31 Ferran Boix PamiesEmpty TARGET BOATIn progressTC on Ta boat test. 11am: Setting up new target tube
thermocouple test
Thursday, August 04, 2022, 09:31
  
  586   Wednesday, June 29, 2022, 10:12 Darwin Ortiz RosalesTaC44692-10HP-FEBIADDoneTaC coating sinteringWednesday, June 29, 2022, 10:07
Ta HP-FEBIAD was coated
  
  585   Tuesday, June 28, 2022, 09:31 Ferran Boix PamiesEmpty41882-2TARGET BOATIn progressTC test on Ta tubeTuesday, June 27, 2022, early afternoon:
We assembled the setup in evap2 and started
the pumps leaving it running over night.
  
  584   Tuesday, June 21, 2022, 09:48 Darwin Ortiz RosalesSiC37978-1HP-FEBIADDoneT-220617 sinteringTuesday, June 21, 2022, 09:43
Total number of foils:
  
  583   Monday, June 20, 2022, 14:52 Darwin Ortiz RosalesEmpty  Donesoftstart of new TPMonday, June 20, 2022, 14:50 
A new Turbo pump was installed this
morning and it was soft started.  It
  
  582   Tuesday, June 14, 2022, 09:04 Darwin Ortiz RosalesTa37978-1HP-FEBIADDoneTaC coating sinteringTuesday, June 14, 2022, 08:47
Ta HP-FEBIAD was coated
  
  581   Thursday, June 09, 2022, 19:20 John Wong boat Donecarbonize PAN 10% discs


   
        
            
 evap2-screenshot_01.PNGevap2-screenshot_02.pngevap2-screenshot_3.pngtemp-current-plot.xlsxevap2-screenshot_04.PNG 
  580   Thursday, June 09, 2022, 09:09 Darwin Ortiz RosalesTa HP-FEBIADDoneTroubleshootingThursday, June 09, 2022, 09:07
Yesterday, Wednesday June 08, 2022
@ ~3.00 pm a "dummy" target container
 MicrosoftTeams-image_(3).pngMicrosoftTeams-image_(4).pngMicrosoftTeams-image_(5).png 