499
|
Tuesday, August 18, 2020, 09:26 |
Marla Cervantes | TaC | 44489-15 | TARGET BOAT | Done | TaC coating/sintering | Tuesday, August 18, 2020, 09:06
A short tantalum tube was coated
with TaC and wrapped with 3 layers of Ta, |
|
498
|
Wednesday, August 12, 2020, 11:57 |
Marla Cervantes | Empty | 44489-9 | TARGET BOAT | Done | Pristine Ta tube calibration | Short oven loaded with additional
hardware are spacers into the flex-line HS.
|
|
497
|
Wednesday, August 12, 2020, 08:58 |
Aaron Schmidt | | | | In progress | Install Flex line HS | Flex line HS installed. New SS gaskets.
Wednesday, August 12, 2020, 08:56:
Roughing (Check). |
|
496
|
Tuesday, August 11, 2020, 10:17 |
Ferran Boix Pamies | Empty | 41882-1 | TARGET BOAT | In progress | Contamination foils temperature test | The target was prepared and put under vacuum
on 2020-08-10
|
|
495
|
Wednesday, August 05, 2020, 19:14 |
Ferran Boix Pamies | Empty | 41882-1 | TARGET BOAT | Done | Parasitic target cooling test | 2020-08-05 7.13pm Roughing pump on
2020-08-06 10:48am Turbo was turned
on by Marla in the morning. Vacuum IGP1 4e-6Torr. |
|
494
|
Wednesday, August 05, 2020, 13:38 |
Aaron Schmidt | | | | | RP Swap on EVAP 2 | BP1 swapped with RP2 (TS beamline)
U-line installed.
Wednesday, August 05, 2020, 13:37: |
|
493
|
Friday, July 31, 2020, 11:16 |
Ferran Boix Pamies | Empty | 41882-1 | TARGET BOAT | Done | Thermocouple measurent of boat temperature | Boat with attached thermocouple type C
with AREMCO ceramabond glue installed in
evap2 the 30-07-2020 |
|
492
|
Saturday, July 25, 2020, 08:58 |
Darwin Ortiz Rosales | ZrC | 44139-7-SK | | In progress | ZrC for Luca's experiments | Friday, July 24, 2020, 15:00
Ta tube cotaining 497 ZrC discs |
|
491
|
Monday, July 20, 2020, 19:25 |
Darwin Ortiz Rosales | SiC | 44139-11 | LP-SIS | Done | SiC sintering for Luca 2 of 2 | Monday, July 20, 2020, 19:27
Coated Ta tube cotaining 355 |
|
490
|
Thursday, July 16, 2020, 11:15 |
Darwin Ortiz Rosales | SiC | 44139-11 | LP-SIS | Done | SiC sintering for Luca 1 of 2 | Thursday, July 16, 2020, 11:15
Coated Ta tube cotaining |
|
489
|
Monday, July 13, 2020, 11:03 |
Aaron Schmidt | | | | | Pump down / leak / vacuum check. | Darwin reported that he was unable
to achieve vacuum of 150mTorr. The flex-line
HS had been removed last week for modifications. |
|
488
|
Monday, June 15, 2020, 14:28 |
Darwin Ortiz Rosales | Empty | 42218-7 | HP-SIS | Done | TaC coating/sintering | Monday, June 15, 2020, 13:30
Container coated with TaC and |
|
487
|
Thursday, June 11, 2020, 13:01 |
Darwin Ortiz Rosales | Empty | 44139-12 | LP-SIS | Done | | Thursday, June 11, 2020, 09:56
Previous day (Wednesday June 10,
2020) |
|
486
|
Monday, June 01, 2020, 12:03 |
Aaron Schmidt | Ta | 44139-13 | LP-SIS | In progress | Ta#60 Conditioning | Ta#60 LP-SIS target
description: |
|
485
|
Friday, May 29, 2020, 10:26 |
Marla Cervantes | Empty | 43044-8 | LP-SIS | Done | TaC coating/sintering | Friday, May 29, 2020, 08:52
Ta tube was coated with TaC |
|
484
|
Wednesday, May 27, 2020, 13:04 |
Marla Cervantes | | 44139-7-SK | | Done | Conditioning graphite target #2 | Wednesday, May 27, 2020, 10:22
IGP1 = 3.2e-7 Torr |
|
483
|
Sunday, May 24, 2020, 13:39 |
Marla Cervantes | Empty | 44139-11 | LP-SIS | Done | TaC coating/sintering | Sunday, May 24, 2020, 06:54
Ta tube was coated with TaC |
|
482
|
Wednesday, May 20, 2020, 12:54 |
Marla Cervantes | | 41882-1 | TARGET BOAT | Done | Conditioning graphite target #1 (T2) |
|
|
481
|
Wednesday, May 20, 2020, 07:18 |
Aaron Schmidt | | | | | Check Evap 2 | Gradually open waterlines under vacuum
after period of no use.
Wednesday, May 20, 2020, 07:17: Vacuum |
|
480
|
Monday, March 23, 2020, 07:50 |
Marla Cervantes | | 41882-1 | TARGET BOAT | Done | Conditioning graphite target #1 (T2) | Friday, March 20, 2020, 19:39
The target material is loaded |
|