509
|
Thursday, September 24, 2020, 13:37 |
Aaron Schmidt | Nb | | TARGET BOAT | | Nb Test SRF group | Sample loaded into a vertical target boat.
Flex line HS removed, SS waterline HS installed
-AS. |
|
508
|
Monday, September 21, 2020, 17:01 |
Marla Cervantes | | 44139-8-SK | TARGET BOAT | Done | Conditioning graphite target #3 | Monday, September 21, 2020, 16:50
450 graphite foils coated with graphite
slurry were loaded in a tantalum tube, the |
 |
507
|
Thursday, September 17, 2020, 16:11 |
Marla Cervantes | Empty | 44139-9 | LP-SIS | Done | TaC coating/sintering | Thursday, September 17, 2020, 16:10
An LP-SIS was wrapped with 3 Ta layers,
and installed in the EVAP2 |
|
506
|
Thursday, September 10, 2020, 07:53 |
Aaron Schmidt | Empty | 41790-8 | LP-FEBIAD | Done | Fernando FEBIAD / Anode testing. | FEBIAD installed. Anode PS installed.
ANODE connected!.
Leak check |
|
505
|
Saturday, September 05, 2020, 21:33 |
Marla Cervantes | Empty | | | Done | Pristine Ta tube calibration | Saturday, September 05, 2020, 12:56
A Ta tube was wrapped with 3 |
|
504
|
Monday, August 31, 2020, 12:57 |
Marla Cervantes | | 44489-15 | | Done | TaC coating heating test | Monday, August 31, 2020, 12:23
A short naked Ta tube (no heat shielding),
previously coated with TaC was set under |
|
503
|
Sunday, August 30, 2020, 18:28 |
Marla Cervantes | Empty | 44489-13 | | Done | TaC coating/sintering | Sunday, August 30, 2020, 06:47
A short tantalum tube was coated |
|
502
|
Wednesday, August 26, 2020, 10:27 |
Marla Cervantes | | 44489-8 | | Done | C-Cartridge test #2 | Wednesday, August 26, 2020, 10:26
A Ta short tube was loaded with |
|
501
|
Saturday, August 22, 2020, 11:44 |
Marla Cervantes | | 44489-11 | | Done | C-Cartridge test#1 | Saturday, August 22, 2020, 11:41
A Ta short tube was coated with TaC
and sintered, then it was loaded with a c-cartridge |
|
500
|
Tuesday, August 18, 2020, 10:41 |
Marla Cervantes | TaC | 44489-11 | | Done | TaC coating/sintering | Thursday, August 19, 2020, 17:28
A short tantalum tube |
|
499
|
Tuesday, August 18, 2020, 09:26 |
Marla Cervantes | TaC | 44489-15 | TARGET BOAT | Done | TaC coating/sintering | Tuesday, August 18, 2020, 09:06
A short tantalum tube was coated
with TaC and wrapped with 3 layers of Ta, |
|
498
|
Wednesday, August 12, 2020, 11:57 |
Marla Cervantes | Empty | 44489-9 | TARGET BOAT | Done | Pristine Ta tube calibration | Short oven loaded with additional
hardware are spacers into the flex-line HS.
|
|
497
|
Wednesday, August 12, 2020, 08:58 |
Aaron Schmidt | | | | In progress | Install Flex line HS | Flex line HS installed. New SS gaskets.
Wednesday, August 12, 2020, 08:56:
Roughing (Check). |
|
496
|
Tuesday, August 11, 2020, 10:17 |
Ferran Boix Pamies | Empty | 41882-1 | TARGET BOAT | In progress | Contamination foils temperature test | The target was prepared and put under vacuum
on 2020-08-10
|
|
495
|
Wednesday, August 05, 2020, 19:14 |
Ferran Boix Pamies | Empty | 41882-1 | TARGET BOAT | Done | Parasitic target cooling test | 2020-08-05 7.13pm Roughing pump on
2020-08-06 10:48am Turbo was turned
on by Marla in the morning. Vacuum IGP1 4e-6Torr. |
|
494
|
Wednesday, August 05, 2020, 13:38 |
Aaron Schmidt | | | | | RP Swap on EVAP 2 | BP1 swapped with RP2 (TS beamline)
U-line installed.
Wednesday, August 05, 2020, 13:37: |
|
493
|
Friday, July 31, 2020, 11:16 |
Ferran Boix Pamies | Empty | 41882-1 | TARGET BOAT | Done | Thermocouple measurent of boat temperature | Boat with attached thermocouple type C
with AREMCO ceramabond glue installed in
evap2 the 30-07-2020 |
|
492
|
Saturday, July 25, 2020, 08:58 |
Darwin Ortiz Rosales | ZrC | 44139-7-SK | | In progress | ZrC for Luca's experiments | Friday, July 24, 2020, 15:00
Ta tube cotaining 497 ZrC discs |
|
491
|
Monday, July 20, 2020, 19:25 |
Darwin Ortiz Rosales | SiC | 44139-11 | LP-SIS | Done | SiC sintering for Luca 2 of 2 | Monday, July 20, 2020, 19:27
Coated Ta tube cotaining 355 |
|
490
|
Thursday, July 16, 2020, 11:15 |
Darwin Ortiz Rosales | SiC | 44139-11 | LP-SIS | Done | SiC sintering for Luca 1 of 2 | Thursday, July 16, 2020, 11:15
Coated Ta tube cotaining |
|