Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 22 of 34  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Source Status Subject Text Attachments
  259   Thursday, November 05, 2015, 16:20 Laura Lambert 41077-3LP-SISIn progressSintering TaC coating on 'temporary endcaps' springs Thursday, November 05, 2015, 16:19
Springs coated with TaC and loaded
into container for sintering.
 2015-11-02_16.03.10.jpg'temporary_endcap'_springs_nov.3_2015.jpgIMG_20151105_141239627_HDR.jpgIMG_20151105_141248901_HDR.jpg 
  258   Monday, November 02, 2015, 16:29 Laura LambertEmpty41077-3LP-SISDonetemp measurements with 3xTa h.s on LPSIS (small block) container Monday, November 02, 2015, 16:28
Container previously sintered
 temp_measurements_on_LPSIS_(small_block)_container.xlsx3xTa_h.s_-_striptool_voltage.JPG 
  257   Monday, October 26, 2015, 16:17 Laura LambertEmpty41077-3LP-SISDonetemp measurements with 2xTa h.s on LPSIS (small block) container Monday, October 26, 2015, 16:16
Container previously sintered with
TaC coating and temperature measurements
 6x 
  256   Monday, October 26, 2015, 16:14 Laura LambertEmpty41077-3LP-SISDoneSintering TaC on LPSIS (small block) container & temp measurements with 1xTa h.s

    

       
            
 temp_measurements_on_sintering_TaC_on_LPSIS_(small_block)_container.xlsx 
  255   Thursday, October 22, 2015, 17:10 John WongEmpty41077-3LP-SISIn progressSintering TaC on LPSIS (small block) container

    

       
            
  
  254   Thursday, October 22, 2015, 11:41 Laura LambertEmpty41077-3LP-SISIn progressSintering TaC on LPSIS (small block) container

    

       
            
  
  253   Wednesday, October 21, 2015, 17:39 John WongEmpty41077-3LP-SISIn progressSintering TaC on LPSIS (small block) container Wednesday, October 21, 2015, 17:35
This container is prepared for a
backup UCx target (otherwise it will be used
  
  252   Thursday, October 08, 2015, 12:26 John WongEmpty41077-5LP-SISIn progressTest#2: Measuring temp with thermocouple (away from centre) & 2C-IR

    

       
            
 Test_2_tempcurves.PNGTest1&2_IV_temp_.png 
  251   Tuesday, October 06, 2015, 15:18 John WongEmpty41077-5LP-SISIn progressTest#1: Measuring temp with thermocouple (centre) & 2C-IR

    

       
            
 Temp_LPSIS_IR2C_vs_typeC.PNGTemp_LPSIS_IR2C_vs_typeC_heating_cooling.PNG 
  250   Thursday, September 24, 2015, 12:18 John WongEmpty41077-5LP-SISDoneSintering TaC coating container for UCx Target

    

       
            
 Screen_Shot_2015-09-24_at_11.51.11_AM.png420A_1900.pngTaC_coat_sintered.png 
  249   Thursday, September 24, 2015, 09:48 Laura LambertEmpty41077-5 In progressSintering TaC coating container for UCx TargetThursday, September 24, 2015, 08:39
IGP1 = 6.5e-7Torr
HS water valves opened, no leaks
  
  248   Thursday, September 10, 2015, 12:05 John WongSiC39530-5HP-FEBIADDoneRe-conditioning SiC#32

    

       
            
 Screen_Shot_2015-09-15_at_12.37.19_PM.pngScreen_Shot_2015-09-18_at_9.10.13_AM.pngScreen_Shot_2015-09-24_at_11.30.25_AM.png 
  247   Thursday, September 10, 2015, 09:58 Laura LambertSiC39530-5HP-FEBIADIn progressRe-conditioning SiC#32

    

       
            
  
  246   Wednesday, September 09, 2015, 18:24 John WongSiC39530-5HP-FEBIADIn progressRe-conditioning SiC#32

    

       
            
 Screen_Shot_2015-09-09_at_5.53.15_PM.png 
  245   Tuesday, September 08, 2015, 15:56 John WongSiC39530-5HP-FEBIADIn progressSintering SiC#32

    

       
            
 SiC#33_HPFEBIAD_temp.PNGSiC#33_HPFEBIAD_temp.xlsxleft_window.JPGleft_window_1.JPG 
  244   Wednesday, September 02, 2015, 11:28 Laura LambertSiC39530-5HP-FEBIADIn progressSintering SiC#32

    

       
            
 Screenshot-1stsintering-prewindow_coating.JPG 
  243   Tuesday, September 01, 2015, 17:20 John WongSiC39530-5HP-FEBIADIn progressSintering SiC#32Tuesday, September 01, 2015, 17:16
Target container contains 533 discs
of SiC with packed length of 17cm. 
  
  242   Thursday, August 27, 2015, 16:37 John WongEmpty HP-FEBIADDoneSintering TaC coating container for SiC Target

    

       
            
  
  241   Tuesday, August 25, 2015, 11:54 Laura LambertEmpty HP-FEBIADIn progressSintering TaC coating container for SiC Target Tuesday, August 25, 2015, 11:50
Container coated with TaC using new
method: Ends tapped off,  with liquid
  
  240   Monday, August 24, 2015, 12:58 John Wong   MaintenanceReplacing turbo pump, IEVAP2TP1 Monday, August 24, 2015, 12:54
The turbo pump was found to be faulty.
 The pump couldn't get on full speed
  
ELOG V2.9.2-2455