ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
|
|
115
|
Wednesday, July 08, 2015, 10:52 |
John Wong | UC2 | 40860-1 | LP-IG-LIS | Done | Conditioning UCx #13 |
|
|
|
116
|
Thursday, July 30, 2015, 17:19 |
John Wong | UO2/C | 40282-1 | TARGET BOAT | In progress | Processing UC2_flk_07 | Thursday, July 30, 2015, 17:10
The mixture of UO2/C was prepared
on July 13, 2015. See screen shot for |
|
|
120
|
Monday, September 14, 2015, 15:31 |
John Wong | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_09 | Monday, September 14, 2015, 15:28
Green cast dried UO2/C + organic |
|
|
121
|
Thursday, October 15, 2015, 16:05 |
John Wong | UC2 | 41077-5 | LP-SIS | In progress | Conditioning UCx#14 | Thursday, October 15, 2015, 15:52
Target container previously sintered
with TaC in Evap#2 - Target current at 440A, |
|
|
126
|
Friday, February 26, 2016, 10:27 |
John Wong | UC2 | 41077-1 | LP-SIS | In progress | Conditioning UCx#15 |
|
|
|
134
|
Tuesday, August 23, 2016, 17:35 |
John Wong | | | TARGET BOAT | | Sintering TaC coated target boat | Tuesday, August 23, 2016, 17:33
Target boat coated with TaC (sprayed)
and wrapped with Ta-heat shield. |
|
|
135
|
Monday, September 12, 2016, 17:41 |
John Wong | | | TARGET BOAT | In progress | RUSH. Sintering end-caps | Monday, September 12, 2016, 17:30
A bunch of end caps (12?) and a long
Ta-wire in spring sharp were coated |
|
|
140
|
Tuesday, November 15, 2016, 10:02 |
John Wong | UO2/C | 40282-1 | TARGET BOAT | In progress | Processing UC2Flk_13 |
|
|
|
213
|
Thursday, July 05, 2018, 13:43 |
John Wong | UC2 | | HP-FEBIAD-CTL | Done | Conditioning UCx#23 | Thursday, July 05, 2018, 13:24
Target container was previously coated
and sintered with TaC, also wrapped with |
|
|
214
|
Wednesday, July 11, 2018, 17:44 |
John Wong | UO2/C | | TARGET BOAT | Done | Processing UC2Flk_21 | Wednesday, July 11, 2018, 17:41
Cast prepared by Marla (see note
in Hotlab) |
|
|
215
|
Friday, August 03, 2018, 17:49 |
John Wong | UC2 | | LP-SIS | In progress | Conditioning UCx#24 | Friday, August 03, 2018, 17:44
Target consists of 230 UCx discs,
total packing length of 7.1cm. |
|
|
219
|
Saturday, September 29, 2018, 19:04 |
John Wong | UO2/C | | TARGET BOAT | In progress | Processing UC2_flk_22 | Saturday, September 29, 2018, 18:52
Cast is from Jar#1. (see process
sheet for details) |
|
|
220
|
Saturday, September 29, 2018, 20:53 |
John Wong | UC2 | 41369-2 | | Done | UCx Fully loaded graphite insert thermal test - FL#1.2 |
|
|
|
221
|
Thursday, October 11, 2018, 18:13 |
John Wong | UC2 | | LP-SIS | In progress | Conditioning UCx#25 | Thursday, October 11, 2018, 18:06
Target consists of 284 UCx discs,
total packing length of 8.0 cm. |
|
|
259
|
Tuesday, May 26, 2020, 20:44 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#33 Carbothermal Reduction | Tuesday, May 26, 2019,
18:20 |
|
|
262
|
Wednesday, June 03, 2020, 08:10 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#34 Carbothermal Reduction | Wednesday, June 03, 2020, 08:11
A loaded graphite cartridge |
|
|
272
|
Wednesday, June 30, 2021, 13:35 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#34 conditioning | Target
#34 was installed in the EVAP1 and pumped
down (Tuesday June 29, 2021). |
|
|
273
|
Wednesday, July 07, 2021, 12:40 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx Provisional ID= 200229 conditioning | Wednesday, July 07, 2021, 14:39
Target Provisional ID = 200929 |
|
|
275
|
Thursday, September 23, 2021, 07:03 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#35 C reduction | Thursday, September 23, 2021, 06:55
A loaded graphite cartridge |
|
|
281
|
Wednesday, June 01, 2022, 08:42 |
Darwin Ortiz Rosales | UO2/C | Target Boat | | Done | UO2 reduction Provisional ID C211209-1 | Wednesday, June 01, 2022, 08:39
A loaded graphite cartridge |
|
|