    Reply  Wednesday, July 08, 2015, 10:52, John Wong, UC2, 40860-1, LP-IG-LIS, Done, Conditioning UCx #13 Screen_Shot_2015-07-09_at_5.20.37_PM.pngpressure_current_plot.PNG


    
        
            Laura Lambert wrote:
        
        
            
            
            
Entry  Thursday, July 30, 2015, 17:19, John Wong, UO2/C, 40282-1, TARGET BOAT, In progress, Processing UC2_flk_07 IMG_20150714_145857963.jpg
 Thursday, July 30, 2015, 17:10
The mixture of UO2/C was prepared on July 13, 2015.  See screen shot for more info. 
The material is loaded into a target boat and wrapped with 3 layers of Ta-heat shield. 
Entry  Monday, September 14, 2015, 15:31, John Wong, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_09 poor_backing_pump.PNGcurrent_pressure_plot.PNG
 Monday, September 14, 2015, 15:28
Green cast dried UO2/C + organic mass = 61.31g
The green was rolled up and wrapped in a piece of graphite sheet.
Entry  Thursday, October 15, 2015, 16:05, John Wong, UC2, 41077-5, LP-SIS, In progress, Conditioning UCx#14 
Thursday, October 15, 2015, 15:52
Target container previously sintered with TaC in Evap#2 - Target current at 440A, temp measured at 1900C.  A few tests on the temp measured
were done (see Evap#2 elog #251 & 252).  
    Reply  Friday, February 26, 2016, 10:27, John Wong, UC2, 41077-1, LP-SIS, In progress, Conditioning UCx#15 


    
        
            Laura Lambert wrote:
        
        
            
             Thursday, February 18, 2016, 15:34
Entry  Tuesday, August 23, 2016, 17:35, John Wong, , , TARGET BOAT, , Sintering TaC coated target boat  
Tuesday, August 23, 2016, 17:33
Target boat coated with TaC (sprayed) and wrapped with Ta-heat shield. 
chamber is currently being pumped down. Vac currently at 3.3e-5Torr. 
Entry  Monday, September 12, 2016, 17:41, John Wong, , , TARGET BOAT, In progress, RUSH. Sintering end-caps  
Monday, September 12, 2016, 17:30
A bunch of end caps (12?) and a long Ta-wire in spring sharp  were coated with TaC coating and wrapped in a small sheet of graphite foil. 
Container is then wrapped with a sheet of Ta heat shield.
    Reply  Tuesday, November 15, 2016, 10:02, John Wong, UO2/C, 40282-1, TARGET BOAT, In progress, Processing UC2Flk_13 


    
        
            Laura Lambert wrote:
        
        
            
             Monday, November 07, 2016, 13:29
Entry  Thursday, July 05, 2018, 13:43, John Wong, UC2, , HP-FEBIAD-CTL, Done, Conditioning UCx#23 
Thursday, July 05, 2018, 13:24
Target container was previously coated and sintered with TaC, also wrapped with Ta heat shields (see Evap2 elog# 410).
Loaded 201 discs of UCx with 7.27 cm in length + 5 extra discs for QC samples. 
Entry  Wednesday, July 11, 2018, 17:44, John Wong, UO2/C, , TARGET BOAT, Done, Processing UC2Flk_21 
Wednesday, July 11, 2018, 17:41
Cast prepared by Marla (see note in Hotlab)
Target boat contained about 50g UO2 powder. 
Entry  Friday, August 03, 2018, 17:49, John Wong, UC2, , LP-SIS, In progress, Conditioning UCx#24 
Friday, August 03, 2018, 17:44
Target consists of 230 UCx discs, total packing length of 7.1cm. 
Container was previously coated/sintered with TaC (see elog #415) in Evap#2 with TGHT set to 450A/7.5V and TBHT 230A/4.2
Entry  Saturday, September 29, 2018, 19:04, John Wong, UO2/C, , TARGET BOAT, In progress, Processing UC2_flk_22 striptool_capture.JPGTGHT_tripped.JPGpressure_limiting.JPG
Saturday, September 29, 2018, 18:52
Cast is from Jar#1.  (see process sheet for details)
Target boat contains about 50g UO2 powder. 
    Reply  Saturday, September 29, 2018, 20:53, John Wong, UC2, 41369-2, , Done, UCx Fully loaded graphite insert thermal test - FL#1.2 


    
        
            Marla Cervantes wrote:
        
        
            
             Monday, September 03, 2018, 10:17
Entry  Thursday, October 11, 2018, 18:13, John Wong, UC2, , LP-SIS, In progress, Conditioning UCx#25 UC#25_conditioning.JPGUC#25_conditioning-450A.JPG
Thursday, October 11, 2018, 18:06
Target consists of 284 UCx discs, total packing length of 8.0 cm. 
Container was previously coated/sintered with TaC (see elog #417) in Evap#2 with TGHT set to 400A and TBHT 230A, but there was a problem with the
Entry  Tuesday, May 26, 2020, 20:44, Darwin Ortiz Rosales, UO2/C, , TARGET BOAT, Done, UCx#33 Carbothermal Reduction 
 Tuesday, May 26, 2019, 18:20
A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets (Friday
May 22, 2020)
Entry  Wednesday, June 03, 2020, 08:10, Darwin Ortiz Rosales, UO2/C, , TARGET BOAT, Done, UCx#34 Carbothermal Reduction 
Wednesday, June 03, 2020, 08:11 
A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets (Friday
May 29, 2020)
Entry  Wednesday, June 30, 2021, 13:35, Darwin Ortiz Rosales, UO2/C, , TARGET BOAT, Done, UCx#34 conditioning 
Target #34 was installed in the EVAP1 and pumped down (Tuesday June 29, 2021).
Target #34 is going to be conditioned on a Ta boat wrapped with 3 Ta foils.
IGP1 = 1.85e-6 Torr
Entry  Wednesday, July 07, 2021, 12:40, Darwin Ortiz Rosales, UO2/C, , TARGET BOAT, Done, UCx Provisional ID= 200229 conditioning 
 Wednesday, July 07, 2021, 14:39
Target Provisional ID = 200929 was installed in the EVAP1 and pumped down (Tuesday July 7, 2021).
Target is going to be thermally reduced for 8 hours and then conditioned for an additional 8
Entry  Thursday, September 23, 2021, 07:03, Darwin Ortiz Rosales, UO2/C, , TARGET BOAT, Done, UCx#35 C reduction 
 Thursday, September 23, 2021, 06:55
A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets (Wednesday
September 22)
Entry  Wednesday, June 01, 2022, 08:42, Darwin Ortiz Rosales, UO2/C, Target Boat, , Done, UO2 reduction Provisional ID C211209-1  
Wednesday, June 01, 2022, 08:39
A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets (previous
day)