Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1, Page 11 of 15  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target Material Target Oven W.O# Source Statusdown Subject Text Attachments
  141   Wednesday, November 16, 2016, 16:41 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_13

    

       
            
 UCxFlk_10_carbonization.jpgUCxFlk_13_not_done_carbonization_at_520A-see_vacuum.jpgUCxflk_13.xlsx 
  142   Tuesday, November 29, 2016, 16:20 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_14 Tuesday, November 29, 2016, 16:13
UO2/C green was prepared Nov
 UCxFlk_14[1].jpgUC2flk_14_carbonized_in_new_boat.jpg 
  144   Thursday, February 16, 2017, 15:09 Laura LambertUC242218-12LP-SISDoneConditioning UCx#19 Thursday, February 16, 2017, 15:04
Target container was previously
 IMG_1578.JPGIMG_1587.JPGIMG_1594.JPGIMG_1598.JPG 
  145   Friday, March 03, 2017, 15:51 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_15 Friday, March 03, 2017, 08:53
UO2/C green was prepared
 evap1_tripped_off_UCxFlk_15.jpg 
  146   Thursday, April 20, 2017, 11:41 Laura LambertUC242218-1LP-IG-LISDoneConditioning UCx#20 Thursday, April 20, 2017, 11:31
Target container was previously
 6x 
  152   Tuesday, May 30, 2017, 07:43 Laura LambertUO2/C40282-1TARGET BOATDoneprocessing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS

    

       
            
  
  154   Monday, June 12, 2017, 15:07 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_17 Monday, June 12, 2017, 11:41
UO2/C green was prepared June
 UC2Flk_17_entire_carbonization_process_using_new_vacuum_limits.JPGUC2Flk_17_vac_vs._cur.JPGUC2Flk_17_vac_vs._volt.JPG 
  162   Thursday, July 20, 2017, 15:57 Laura LambertUC242218-15LP-SISDoneConditioning UCx#21

    

       
            
 IMG_3249.JPGIMG_3251.JPGIMG_3257.JPGIMG_3258.JPGIMG_3260.JPG 
  164   Wednesday, August 23, 2017, 15:54 Laura LambertUO2/C40282-2TARGET BOATDoneCarbonizing UC2 discs for 1stepUCx in graphite sample container _#1 Wednesday, August 23, 2017, 15:41
2 rounds of UO2/C were cast
 IMG_1768.JPGIMG_1774.JPG 
  167   Thursday, September 21, 2017, 11:35 Laura LambertEmpty  DoneTesting TBHT [1st run!], RP [new oil] and IG [new gauge] Thursday, September 21, 2017, 11:32
Copper plate attached to TBHT to
allow current to be applied.
  
  168   Wednesday, September 27, 2017, 12:05 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_18 Wednesday, September 27, 2017, 09:25
UO2/C green was prepared Sept
  
  169   Tuesday, October 10, 2017, 14:16 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_19 Tuesday, October 10, 2017, 14:11
UO2/C green was prepared Oct
  
  172   Tuesday, November 07, 2017, 14:38 Laura LambertEmpty LP-FEBIADDoneTBHT test with LP-FEBIAD Tuesday, November 07, 2017, 14:34
LP-FEBIAD used several years ago
for temperature measurements is used for
 evap1_data.xlsx 
  173   Tuesday, November 14, 2017, 16:16 Laura LambertUO2/C40282-2TARGET BOATDoneCarbonizing UC2 discs for 1stepUCx in graphite sample container _#2 Tuesday, November 14, 2017, 16:12
Circles from cast 1 were used,
 striptool.JPG 
  175   Thursday, November 23, 2017, 13:39 Marla CervantesUO2/C40282-2 TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#3 Thursday, November 23, 2017, 13:34
Circles from cast 1 were used,
 171124_1e-1.jpg 
  178   Wednesday, January 17, 2018, 13:47 Marla CervantesUO2/C40282-1TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#5 Monday, January 15, 2018, 13:37
35 circles of 14 mm diameter
 Carbonization-Batch5-180118.docx 
  179   Thursday, January 18, 2018, 11:56 Marla CervantesUO2/C40282-2 TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container TP1-off_#4

    

       
            
 Carbonization-Batch4-110118-TP_off.docx 
  183   Tuesday, January 23, 2018, 12:49 Marla CervantesUO2/C40282-2 TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container_#6

    

       
            
 Carbonization-Batch6-220118.docx 
  187   Tuesday, January 30, 2018, 16:07 Marla CervantesUO2/C40282-2 TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#7

    

       
            
 Carbonization-Batch7-300118.docx 
  188   Thursday, February 01, 2018, 13:15 Marla CervantesUO2/C40282-1TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#8 Thursday, February 01, 2018, 12:59
35 circles of 14 mm diameter
 Carbonization-Batch8-020218.docx 
ELOG V2.9.2-2455