    Reply  Wednesday, November 16, 2016, 16:41, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_13 UCxFlk_10_carbonization.jpgUCxFlk_13_not_done_carbonization_at_520A-see_vacuum.jpgUCxflk_13.xlsx


    
        
            John Wong wrote:
        
        
            
            
            
Entry  Tuesday, November 29, 2016, 16:20, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_14 UCxFlk_14[1].jpgUC2flk_14_carbonized_in_new_boat.jpg
 Tuesday, November 29, 2016, 16:13
UO2/C green was prepared Nov 23rd, 2016.
The cast peeled off the glass nicely Nov 24th, 2016 and finished drying over the weekend.
Entry  Thursday, February 16, 2017, 15:09, Laura Lambert, UC2, 42218-12, LP-SIS, Done, Conditioning UCx#19 IMG_1578.JPGIMG_1587.JPGIMG_1594.JPGIMG_1598.JPG
 Thursday, February 16, 2017, 15:04
Target container was previously coated with TaC spray and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block
Entry  Friday, March 03, 2017, 15:51, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_15 evap1_tripped_off_UCxFlk_15.jpg
 Friday, March 03, 2017, 08:53
UO2/C green was prepared Feb 28th, 2017.
The cast peeled off the glass nicely March 2nd, 2017 and loaded into evap1.
Entry  Thursday, April 20, 2017, 11:41, Laura Lambert, UC2, 42218-1, LP-IG-LIS, Done, Conditioning UCx#20 6x
 Thursday, April 20, 2017, 11:31
Target container was previously coated with TaC spray and sintered.
Container is wrapped with 3 layers of Ta-heat shield, including the center block
    Reply  Tuesday, May 30, 2017, 07:43, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS 


    
        
            Laura Lambert wrote:
        
        
            
            
            
Entry  Monday, June 12, 2017, 15:07, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_17 UC2Flk_17_entire_carbonization_process_using_new_vacuum_limits.JPGUC2Flk_17_vac_vs._cur.JPGUC2Flk_17_vac_vs._volt.JPG
 Monday, June 12, 2017, 11:41
UO2/C green was prepared June 7th, 2017.
The cast peeled off the glass nicely June 8th, 2017.
    Reply  Thursday, July 20, 2017, 15:57, Laura Lambert, UC2, 42218-15, LP-SIS, Done, Conditioning UCx#21 IMG_3249.JPGIMG_3251.JPGIMG_3257.JPGIMG_3258.JPGIMG_3260.JPG


    
        
            Laura Lambert wrote:
        
        
            
            
            
Entry  Wednesday, August 23, 2017, 15:54, Laura Lambert, UO2/C, 40282-2, TARGET BOAT, Done, Carbonizing UC2 discs for 1stepUCx in graphite sample container _#1 IMG_1768.JPGIMG_1774.JPG
 Wednesday, August 23, 2017, 15:41
2 rounds of UO2/C were cast onto a graphite sheet in the fume hood and let dry.
For this round of samples, circles from cast 1 were used
Entry  Thursday, September 21, 2017, 11:35, Laura Lambert, Empty, , , Done, Testing TBHT [1st run!], RP [new oil] and IG [new gauge] 
 Thursday, September 21, 2017, 11:32
Copper plate attached to TBHT to allow current to be applied.
Started pumping down this a.m.
Entry  Wednesday, September 27, 2017, 12:05, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_18 
 Wednesday, September 27, 2017, 09:25
UO2/C green was prepared Sept 20th, 2017.
The cast peeled off the glass Sept 22nd, 2017 - not quite enough 'special' ingredient.
Entry  Tuesday, October 10, 2017, 14:16, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_19 
 Tuesday, October 10, 2017, 14:11
UO2/C green was prepared Oct 4th, 2017
The cast peeled off the glass nicely Oct 6th, 2017
Entry  Tuesday, November 07, 2017, 14:38, Laura Lambert, Empty, , LP-FEBIAD, Done, TBHT test with LP-FEBIAD evap1_data.xlsx
 Tuesday, November 07, 2017, 14:34
LP-FEBIAD used several years ago for temperature measurements is used for this test.
3xTa heat shields on container, incl center block - these heat shields have remained on there since the last round of tests in 2014?
Entry  Tuesday, November 14, 2017, 16:16, Laura Lambert, UO2/C, 40282-2, TARGET BOAT, Done, Carbonizing UC2 discs for 1stepUCx in graphite sample container _#2 striptool.JPG
 Tuesday, November 14, 2017, 16:12
Circles from cast 1 were used, the same as the last round of 1stepUCx [see elog i.d. 164]
A 14mm punch was used to punch out circles from the cast.
Entry  Thursday, November 23, 2017, 13:39, Marla Cervantes, UO2/C, 40282-2 , TARGET BOAT, Done, Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#3 171124_1e-1.jpg
 Thursday, November 23, 2017, 13:34
Circles from cast 1 were used, the same as the last round of 1stepUCx [see elog i.d. 164]
A 14mm punch was used to punch out circles from the cast.
Entry  Wednesday, January 17, 2018, 13:47, Marla Cervantes, UO2/C, 40282-1, TARGET BOAT, Done, Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#5 Carbonization-Batch5-180118.docx
 Monday, January 15, 2018, 13:37
35 circles of 14 mm diameter were packed into a graphite sample container.
35 x UO2/C circles = 5.58 g
    Reply  Thursday, January 18, 2018, 11:56, Marla Cervantes, UO2/C, 40282-2 , TARGET BOAT, Done, Carbonizing UO2/C discs for 1stepUCx in graphite sample container TP1-off_#4 Carbonization-Batch4-110118-TP_off.docx


    
        
            Laura Lambert wrote:
        
        
            
            
            
    Reply  Tuesday, January 23, 2018, 12:49, Marla Cervantes, UO2/C, 40282-2 , TARGET BOAT, Done, Carbonizing UO2/C discs for 1stepUCx in graphite sample container_#6 Carbonization-Batch6-220118.docx


    
        
            Marla Cervantes wrote:
        
        
            
            
            
    Reply  Tuesday, January 30, 2018, 16:07, Marla Cervantes, UO2/C, 40282-2 , TARGET BOAT, Done, Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#7 Carbonization-Batch7-300118.docx


    
        
            Marla Cervantes wrote:
        
        
            
            
            
Entry  Thursday, February 01, 2018, 13:15, Marla Cervantes, UO2/C, 40282-1, TARGET BOAT, Done, Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#8 Carbonization-Batch8-020218.docx
 Thursday, February 01, 2018, 12:59
35 circles of 14 mm diameter were packed into a graphite sample container.
28 discs corresponded to cats#1 and 7 discs to cast#2