ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
|
95
|
Friday, June 13, 2014, 15:21 |
John Wong | UC2 | 39165-10 | LP-SIS | Done | Conditioning UCx#10 | Friday, June 13, 2014, 15:02
Target container was previously coated
and sintered with TaC. It's wrapped |
|
94
|
Wednesday, May 21, 2014, 11:41 |
John Wong | UC2 | | TARGET BOAT | In progress | Tests: Sintering carbon Mesh coated with UC2 | Tuesday, May 20, 2014, 16:01
Target boat contains one pellet of
carbon mesh coated with UC2. The sample |
|
93
|
Wednesday, April 30, 2014, 14:58 |
John Wong | UC2 | 39165-9 | LP-SIS | Done | Conditioning UCx#9 | Wednesday, April 30, 2014, 14:50
The target container was previously
coated with TaC and sintered in Evap 2. |
|
92
|
Monday, March 24, 2014, 17:53 |
John Wong | UO2/C | | TARGET BOAT | Done | Processing UC2Flk_02 | Monday, March 24, 2014, 17:50
UO2/C cast was prepared on March
21 and let dry over the weekend. The |
|
91
|
Wednesday, March 05, 2014, 23:05 |
John Wong | | | TARGET BOAT | Done | Re-sinterring end caps |
|
|
90
|
Wednesday, March 05, 2014, 10:30 |
Laura Lambert | | | TARGET BOAT | In progress | Re-sinterring end caps |
|
|
89
|
Tuesday, March 04, 2014, 15:48 |
John Wong | | | TARGET BOAT | In progress | Re-sinterring end caps | Tuesday, March 04, 2014, 15:43
Theses endcaps (4) were previously
sinterred in Evap#2 but some surfaces were |
|
88
|
Wednesday, February 05, 2014, 14:29 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_01 | Wednesday, February 05, 2014, 14:13
1st attempt:
UO2/C green was prepared on Feb 4, |
|
87
|
Monday, January 27, 2014, 11:03 |
Laura Lambert | Empty | 40282-1 | TARGET BOAT | Done | Sintering Ta target boat with TaC coating |
|
|
86
|
Friday, January 24, 2014, 14:45 |
Laura Lambert | Empty | 40282-1 | TARGET BOAT | In progress | Sintering Ta target boat with TaC coating |
|
|
85
|
Thursday, January 23, 2014, 16:29 |
Laura Lambert | Empty | 40282-1 | TARGET BOAT | In progress | Sintering Ta target boat with TaC coating | Thursday, January 23, 2014, 16:26
A new target boat was sprayed
with TaC coating and let dry, the coating |
|
84
|
Monday, December 02, 2013, 16:10 |
Anders Mjos | | | | Done | Copper bar on TGHT | The conductivity of the TGHT circuit will
be measured with a copper bar shunt.
Monday, December 02, 2013, 16:00: |
|
83
|
Monday, December 02, 2013, 16:09 |
Anders Mjos | | | | Problems resolved | TGHT connector repositioned and tightened | The right connector for the TGHT had rotated.
It has now been repositioned and both connectors
have been tightened to reduce the chance |
|
82
|
Friday, November 01, 2013, 13:08 |
Anders Mjos | | | | Maintenance | Gloves, window and window gasket replaced. | Work covered under work permit 2013-11-01-3
and performed by Anders and Rick with the
help of Danno (RPG). |
|
81
|
Friday, October 11, 2013, 18:10 |
John Wong | UC2 | 39814-IV | LP-IG-LIS | Done | UCx#8 - Final Conditioning | Friday, October 11, 2013, 18:00
|
|
80
|
Friday, October 04, 2013, 15:56 |
John Wong | Empty | | LP-SIS | Done | Ignore this entry - Process was done in Evap2 | Friday, October 04, 2013, 15:37
A LP target container is coated with
TaC. The container is wrapped with |
|
79
|
Friday, September 20, 2013, 13:49 |
John Wong | UO2/C | Target Boat #2 | | Done | Processing UC2Flk_00 |
|
|
78
|
Thursday, September 19, 2013, 15:41 |
Laura Lambert | UO2/C | Target Boat #2 | | In progress | Processing UC2 flakes (batch #07 - 09192013) | Thursday, September 19, 2013, 15:35
UO2/C green was prepared on Aug 17,
2013. The slurry was cast on a piece of glass |
|
77
|
Tuesday, September 10, 2013, 12:20 |
Laura Lambert | UO2/C | Target Boat #2 | | Done | Processing UC2 flaskes (batch#06 - 08222013 |
|
|
76
|
Friday, August 23, 2013, 16:11 |
John Wong | UO2/C | Target Boat #2 | | Problems resolved | Processing UC2 flaskes (batch#06 - 08222013 |
|
|